Loading...
HomeMy WebLinkAboutNC0021229_Pretreatment - STMP_20210301TOWN OF OLD FORT WWTP PRETREATMENT PROGRAM (MODIFIED) SHORT TERM MONITORING PLAN ACTIVATED SLUDGE/ AEROBIC DIGESTER WITH CLASS A BIORESIDUAL MANAGEMENT FACILITY SAMPLING FREQUENCY SAMPLING POINT Within one year before HWA: 1-- INFLUENT QUARTERLY 2--EFFLUENT QUARTERLY 3--ACTIVATED ONCE SLUDGE TANK 4--SLUDGE TO PER SLUDGE PERMIT AND DISPOSAL 503 REGULATIONS (ONCE) 5 --SIU PER SIU PERMIT AND ONCE PER YEAR FOR POC's Influent and effluent will be sampled in March, June, September and December . Influent will be composite sampled on Monday and effluent will be composite sampled on Thursday to allow for detention time through the WWTP. TOWN OF OLD FORT WWTP PRETREATMENT PROGRAM (MODIFIED) SHORT TERM MONITORING PLAN ACTIVATED SLUDGE/ AEROBIC DIGESTER WITH CLASS A BIORESIDUAL MANAGEMENT FACILITY SAMPLING PLAN: P.O.C.PT. 1 PT. 2 PT. 3 PT. 4 PT.5 As X X X X X Cd X X X X X Cr X X X X X Cu X X X X X Pb X X X X X Hg X X X X X Mo X X X X X Ni X X X X X Se X X X X X Zn X X X X X FLOW X X % SOLIDS X BOD X X X TSS X X X X NH3 X X X X 1= influent 2 = effluent 3 = aeration 4 = sludge 5 = SIU (Hillman) TOWN OF OLD FORT WWTP PRETREATMENT PROGRAM (MODIFIED) SHORT TERM MONITORING PLAN ACTIVATED SLUDGE/ AEROBIC DIGESTER WITH CLASS A BIORESIDUAL MANAGEMENT FACILITY DETECTION LEVEL AND SAMPLING METHOD P.O.C.DETECTION LEVEL, MG/L SAMPLING METHOD As 0.01 24 HOUR COMPOSITE Cd 0.002 24 HOUR COMPOSITE Cr 0.005 24 HOUR COMPOSITE Cu 0.002 24 HOUR COMPOSITE Pb 0.01 24 HOUR COMPOSITE Hg *0.0002 GRAB Mo 0.1 24 HOUR COMPOSITE Ni 0.01 24 HOUR COMPOSITE Se 0.01 24 HOUR COMPOSITE Zn 0.01 24 HOUR COMPOSITE FLOW N/A N/A % SOLIDS N/A N/A BOD 2 24 HOUR COMPOSITE TSS 2.5 24 HOUR COMPOSITE NH3 0.1 24 HOUR COMPOSITE * Effluent (sampling point 2) mercury samples require EPA method 1631 with a detection limit of 0.000001 mg/L ( 1 ng/L). TOWN OF OLD FORT WWTP PRETREATMENT PROGRAM (MODIFIED) SHORT TERM MONITORING PLAN ACTIVATED SLUDGE/ AEROBIC DIGESTER WITH CLASS A BIORESIDUAL MANAGEMENT FACILITY DIAGRAM: 5 - SIU pump station influent 1 bar screen return sludge 4 sludge to disposal 2 receiving stream- Curtis Creek equalization tank 0.8 MG aeration tank 1.2 MG 3 clarifiers 1, 2, & 4 aerobic digester belt press & lime pasteurization Cl2 contact chamber