Loading...
HomeMy WebLinkAboutNCC215533_ESC Approval Submitted_20211026Towv of,C tY Nom H CAROLInrn August 26, 2021 Bainbridge Communities Acquistion III, LLC 401 Harrison Oaks Blvd. Suite 250 Cary, NC 27513 RE: Development Review Committee Approval of Bainbridge Cary Project Number: Town of Cary Project Number: 21-DP-2244 Property Real Estate ID Number(s): Planning & Development Services Town of Cary 316 N. Academy St. I Cary, NC 27513 The Town of Cary Development Review Committee is pleased to inform you that your plan is approved, effective 26 Aug 2021. SCOPE OF WORK APPROVED: This is a development of an apartment complex that will consist of four buildings. There will be no more than 260 units. This development is associated with the approved PDP #17-REZ-27. Road widening improvements along Chapel Hill Road and NW Maynard are associated with this development. Utility infrastructure will be developed to include water, sewer, irrigation and fire services. DURATION AND EFFECT OF APPROVAL • Substantial Commencement by 26 Aug 2022 • This approval shall become null and void if the applicant fails to substantially commence work authorized by this approval prior to the date noted above CONSTRUCTION COMPLETION • In no case shall this plan or parts of this plan be valid if work is intentionally or voluntarily discontinued fora period of not less than 24 months. If plan is deemed to no longer be valid, the owner or applicant will be required to resubmitfor approval a plan that meets current development ordinances unless otherwise noted in this Ordinance. • No change(s) maybe made to the above -referenced development plan unless approved by the Town of Cary. PAYMENT OF FEES: • Before a pre -construction meeting can be scheduled and anywork begin on this project, all fees included in the attached Statement of Fees must be paid either online (following the below instructions), by phone (311 inside Cary, 919-469-4046 outside Cary), or by check. • Failure to do so may result in delays to processing times for related applications and permits, and may also result in the Town initiating appropriate enforcement action in accordance with Chapter 11 of the LDO. Such action may include, but is not limited to, issuance of civil penalties and/or withholding issuance of building and occupancy permits. To Pay Fees Online: www.townofcary.org Select Permit Put in permit number View Application Fees To Pay Fees by check: • Mail your check (payable to Town of Cary) to Development Services, PO Box 8005, Cary, NC 27512 -you must reference your Development Plan number on the check. If paying by check, allow approximately 2 weeks for us to receive and process the check. REQUIRED DOCUMENTS Created with idtPlans Review Bainbridge Cary Page 1 of 2 8/26/21 Please email to Lisa Booze (lisa.booze@townofcary.org) the following documents: • One (1) complete 11" x17" set of the signed approved plans • Town of Cary Environmental (Land Disturbance/Grading) Permit Application for 15.0 acres, including: • Financial Responsibility form • Certificate of Insurance Please also drop off two hard copies of the plans to staff at Jordan Hall - 908 N Harrison Ave, Cary NC 27513. • A Soil and Erosion Certificate of Compliance must be obtained from Town of Cary Stormwater Management prior to issuance of any building permits. PRE -CONSTRUCTION MEETINGS: • E-mail 311 (a)townofcary.org to arrange a pre -construction meeting prior to any construction activity and after the above requirements have been met. • Pre -construction meetings are available weekly on Tuesdays between 1 pm-3pm and Thursdays between 10am-12pm on a first come first serve basis. • Once all requirements have been meta Pre -construction meeting should be scheduled a minimum of 3 business days prior to the meeting date. A Record Drawing of this plan set per Section 10000 of Town of Cary Standard Specifications shall be provided to the Town at the conclusion of development, and prior to the final site inspection. This final set shall include all revisions, Minor Alterations, field changes, and other modifications to the original approval so that the site inspector has the most accurate plans possible to perform their inspection. ADDITIONAL APPROVALS REQUIRED Constructing and/or occupying buildings or other structures • A building permit issued by the Town of Cary is required prior to commencing the construction, alteration, repair or removal of a building or structure, or part thereof, including interior and/or exterior work. • A building permit is required prior to a change in the use or occupancy of any existing building, or part thereof, regardless of work (interior or exterior) to be performed on the building. • All required building permit and development fees will be due prior to the issuance of a building permit. For questions about building permits, inspections or fees, contact Development Services at (919) 469-4046 or dre@townofcary.org. No Certificate of Occupancy or Certificate of Compliance maybe issued until all on -site and off -site improvements have been completed unless otherwise approved by the Town of Cary. SIGNS • Signage is a separate application and approval process and has not been reviewed or approved as part of this development plan. • A sign permit must be obtained prior to erecting any permanent or time -limited sign(s) on the property. • For information about sign requirements and application process, contact Development Services at (919) 4694046 or drc@townofcary.org. For any questions about this development plan approval, please contact Development Services at (919) 469-4046 or email dre@townofcary.org. We thank you for choosing the Town of Cary. S i nce rely, TOWN ofCARY Created with idtPlans Review Bainbridge Cary Page 2 of 2 8/26/21