Loading...
HomeMy WebLinkAbout20131052 Ver 1_Approval Letter_201310031� Ain MCDENR North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder John E. Skvarla, III Governor Director Secretary October 3, 2013 Alexander County NCDWR Project No. 13 -1052 Bridge #289 Mr. Mike Holder NCDOT, Division 12 1710 East Marion St. Shelby, NC 28151 APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS Dear Mr. Holder: You have our approval, in accordance with the conditions listed below, for the following impacts at the subject site located on Boone Gap Lane (SRI 309) in Alexander County: Stream Imp acts in the Catawba River Basin Site Permanent Temporary Total Stream Impact Impact Stream Impacts Perennial Stream Perennial Impact Requiring (linear ft) Stream (linear ft) (linear ft) Mitigation linear ft S1 43 30 73 0 S2 65 65 0 Total 108 30 138 0 The project shall be constructed in accordance with your application dated /received September 30, 2013. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 3886. This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non - Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. 1. Diversion ditches and similar measures for the purpose of sediment and erosion control will be matted and maintained to ensure maximum efficiency for the reduction of sediment loss and turbidity. Transportation and Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699 -1650 Location: 512 N. Salisbury St. Raleigh, North Carolina 27604 Phone: 919 - 807 -63001 FAX: 919 -807 -6492 Internet: www.rimaterquality.orq An Equal Opportunity \ Affirmative Action Employer NorthCarolina 2. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills. 3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. 4. The use of rip -rap above the Normal High Water Mark shall be minimized. Any rip -rap placed for stream stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life passage. 5. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize sedimentation and reduce the introduction of other pollutants into the stream. 6. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 7. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this certification. 8. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface waters is prohibited. 9. Native riparian vegetation (ex. list herbaceous, trees, and shrubs native to your geographic region) must be reestablished in the riparian areas within the construction limits of the project by the end of the growing season following completion of construction. 10. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct impact from road construction activities. 11. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT Division Engineer or authorized agent shall complete and return the enclosed "Certification of Completion Form" to notify the NCDWR when all work included in the 401 Certification has been completed 12. The permittee shall report any violations of this certification to the NCDWR within 24 hours of discovery. 13. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with the,Division Engineer and the on -site project manager. 14. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State or federal law is being violated, or that further conditions are necessary-to assure compliance, the NCDWR may reevaluate and modify this certification. If you wish to contest any statement in the attached Certification you must file a petition for an administrative hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered filed when it is received in the office of Administrative Hearings during normal office hours. The Office of Administrative Hearings accepts filings Monday through Friday between the hours of 8:00am and 5:00pm, except for official state holidays. The original and one (1) copy of the petition must be filed with the Office of Administrative Hearings. VT .t The petition may be faxed - provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for the Office of Administrative Hearings is: Office of Administrative Hearings, 6714 Mail Service Center Raleigh, NC 27699 -6714 Telephone: (919)- 431 -3000, Facsimile: (919) -431 -3100 A copy of the petition must also be served on DENR as follows: Mr. Lacy Presnell, General Counsel Department of Environment and Natural Resources 1601 Mail Service Center This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you have any questions, please contact Alan Johnson at 704 - 663 -1699 or Alan.Johnson @ncdenr.gov. Attachment cc: Trish Beam, Division 12 Environmental Officer Steve Kichefski, US Army Corps of Engineers, Asheville Sonia Carrillo, Wetland Transportation Unit Sincerely, ,7 Thomas A. Reeder