Loading...
HomeMy WebLinkAbout20130987 Ver 1_More Info Received_20131002WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From /To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 17 +33 -L LT 0.03 0.010 0.02 0.03 19 +29 -L- LT 2 18 +39 -L- (RT) 0.03 0.01 0.02 0.01 61 19 +38 -L RT 3 19 +41 -L- LT 0.06 0.04 0.16 22 +84 -L- LT 4 19 +45 -L- (RT) 0.06 0.07 21+92 -L- RT 5 19 +41 -L- LT 0.12 0.05 0.13 6 22 +38 -L- (RT) FILL /BRIDGE 0.01 0.01 0.02 22 +89 -L RT TOTALS: 0.31 0.010 0.20 0.36 0.01 61 PERMIT DRAWINGS SHEET 9 OF 9 Rev.10 /2/2013 Revised 3/31105