Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20130987 Ver 1_More Info Received_20131002
WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From /To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 1 17 +33 -L LT 0.03 0.010 0.02 0.03 19 +29 -L- LT 2 18 +39 -L- (RT) 0.03 0.01 0.02 0.01 61 19 +38 -L RT 3 19 +41 -L- LT 0.06 0.04 0.16 22 +84 -L- LT 4 19 +45 -L- (RT) 0.06 0.07 21+92 -L- RT 5 19 +41 -L- LT 0.12 0.05 0.13 6 22 +38 -L- (RT) FILL /BRIDGE 0.01 0.01 0.02 22 +89 -L RT TOTALS: 0.31 0.010 0.20 0.36 0.01 61 PERMIT DRAWINGS SHEET 9 OF 9 Rev.10 /2/2013 Revised 3/31105