Loading...
HomeMy WebLinkAboutNC0026921_Facility Update_2005101010/10/05 PARKTON (NC0026921) It was understood by BH, DL, & Mark Brantley, from the meeting in Town Hall at Parkton today (10-10-05), that the mayor would provide this office with an update by Friday (10-14-05) concerning the status of hiring a new ORC for the Wastewater Treatment Plant (WWTP). We also understood that the mayor will contact us immediately when he hired a new Wastewater Treatment Plant Operator in Responsible Charge (ORC) and Collection System ORC, and that the Water Pollution Control System Designation Form would be completed and sent to Raleigh and to the Fayetteville Regional Office. The following are other items that were discussed in today's meeting: 1) Robert Adams decided to re -run for Mayor of Parkton for the election in November of this year, 2) Don Register, of this office, is available for working with the new ORC, 3) the 24-hour composite sampler for Parkton was not operating properly during the WWTP inspection performed last week, 4) the NPDES permit requires that 24-hour composite samples be collected at the facility once per week (please refer to the Parkton's NPDES permit), 5) a WWTP ORC is required to visit the Parkton WWTP at least five days per week, 6) the ESB unit did not receive the Parkton July 2005 aquatic toxicity form (AT-1 form) (note that this form was later faxed to FRO), and 7) the records of all WWTP monitoring information must be kept and made available during inspection.