Loading...
HomeMy WebLinkAbout20131058 Ver 1_Application_20131001i� 14 � �b i��� � ,' STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAT L. MCCRORY GoverzNOa September 30, 2013 Mr. Steven Kichefski Asheville Regulatory Field Office US Army Corp of Engineers 151 Patton Avenue, Suite 208 Asheville, NC 28801-5006 AN �OrrY J. TATA SECRETARY SUBJECT: Bridge #117 Replacement on SR 1565 (Stikeleather Road), Iredell County Dear 5ir: The North Carolina Department of Transportation requests authorization to replace a deteriorating bridge on SR 1565 (Stikeleather Road) in Iredell County. NCDOT proposes to replace the existing 19-ft timber deck bridge with a 42 foot long, 20' x 6' Conspan on concrete footings. The footings will be constructed outside of the stream channel; however, imperoious dikes will be utilized to manage the stream during conshuction of the concrete footings. The banks and stream immediately upstream and downstream of the spanning shucture will be disturbed (see attached culvert construction sequence sheet); therefore, it will be necessary to conshuct 25-foot long riprap-faced floodplaiu benches upstream and downstream of the bottomless culvert to re-establish "normal" channel dimensions. Addirionally, 25 feet of bank stabilization along an adjacent unnamed iributazy will be necessary due to dishubance during construction of the Conspan concrete footings. A temporary cofferdam pumping system will be nsed to divert the stream azound the construction site as needed. Any azeas affected by temporary cofferdam system will be restored to pre-project condifions. The scope of the work will result in a total of 75 feet of permanent impacts to Cullys Branch and an unnamed tributary to Cullys Branch, wluch is classified a WS IV Watershed by the Division of Water Quality. A survey was conducted March 2012 for federally listed species for Iredell County (USFWS listed dated September 22, 2010), which include the dwazf-flowered heartleaf (Hexastydis naniflora) and the bog turtle (Cdemmys muhlenbergit�. Suitable habitat for the federally listed heartleaf species did not e�st in the project study azea. No impact on either species is anticipated. A cultural resowces review of the area of potential impact was conducted. There are no archaeological sites or historic properties wluch would be affected by the project. (Project Tracking No. 11-10-0018). The project area is not located within % mile of any critical watershed area. SR 1565 is not a rural or urban arterial; therefore, hazardous spill basins are not required. Enclosed is the hazardous spill basin checklist. Bridge # 117, SR 1 S65 Page 2 September 30, 2013 I have enclosed a pr�construction notificarion for a NW#14, sketches of planned activifies and location maps relative to the project. Project information for the 401 Automated Payment Procedure is as follows: • Work order number: 150461-55120005-17BP12.R21-3372 • TIP#: NA • Project Category: $240.00 Fee If you have any questions or concerns please feel free to contact me at (704) 480-9044. Thank you for your time and consideration on this matter. Respectfully yours, M.L. Holder, P.E. Division Engineer Twelfth Division ., s � : - . .�: r° BY: _ / ` w: C!°b--- �.�'1^ Trish Beam Division 12 Environmenta] Supervisor Enclosures F `N T�y �. �, tiW �' , � � _ � __. „� Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre-Construcfion Notificafion C Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps � Section 404 Permit ❑ Section 10 Permit 1b. Specify Nationwide Permit (NWP) number. 14 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes � No 1 d. Type(s) of approval sought from the DWQ (check all that apply): � 401 Water Qualiry Certification — Regular ❑ Non-404 Jurisdictional General Permit ❑ 401 Water Quality Certiflcation — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record For the record only for DWQ 401 For the record only for Corps Permit: because written approval is not required? Certification: ❑ Yes � No ❑ Yes � No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation � yes � No of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h ❑ Yes � No below. 1 h. Is the project located within a NC DCM Area of Environmental Concem (AEC)? ❑ Yes � No 2. Project Information 2a. Name of project: SR 1565 (Stikeleather Road) 2b. County: Iredell 2c. Nearest municipality / town: Statesville 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state 17BP.12R.21 project no: 3. Owner Information 3a. Name(s) on Recorded Deed: NC DOT Right of Way 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Streetaddress: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: ❑ Agent ❑ Other, specify: 4b. Name: Mike Holder 4c. Business name N.C. Department of Transportation, Division 12 (if applicable): 4d. Street address: 1710 East Marion Street 4e. City, state, zip: Shelby, NC 28151 4f. Telephone no.: 704-480-9020 4g. Fax no.: 704-480-5401 4h. Email address: mholder@ncdot.gov 5. AgenUConsultant Information (if applicable) 5a. Name: Trish Beam 5b. Business name N.C. Department of Transportation, Division 12 (if applicable): 5c. Street address: 1710 East Marion Street 5d. City, state, zip: Shelby, NC 28151 Se. Telephone no.: 704-480-9044 5f. Fax no.: 704-480-5401 5g. Email address: pdbeam@ncdot.gov Page 2 of 12 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Properly Identiflcation 1a. Property identification no. (tax PIN or parcel ID): NA 1b. Site coordinates (in decimal degrees): Latitude: 35.8774 Longitude: - 81.0334 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: <.10 acres 2. SurFace Waters 2a. Name of nearest body of water (stream, river, etc.) to Cully's Branch proposed project: 2b. Water Quality Classification of nearest receiving water: WS-IV 2c. River basin: Yadkin 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Existing 19-foot timber deck span bridge on paved secondary road; Land use is mostiy forested/residential. 3b. List the total estimated acreage of all existing wetlands on the property: 0 3c. List the total estimated linear feet of all existing streams (intermittent and per2nnial) on the property: 200 feet 3d. Explain the purpose of the proposed project: The purpose of the proposed work is to replace the deteriorating bridge for the safety of the travelling public. 3e. Describe the overall project in detail, including the type of equipment to be used: NCDOT proposes to replace the existing 19-ft timber deck bridge with a 42 foot long, 20' x 6' conspan on concrete footings. The footings will be constructed outside of the stream channel; however, ilmpervious dikes will be utilized to manage the stream during construction of the concrete footings; therefore, the banks and stream immediately upstream and downstream of the conspan will be disturbed. It will be necessary to construct riprap-faced floodplain benches to re- establish "normal" channel dimensions. Additionally, a side channel adjacent to the existing bridge will require 25 feet of bank stabilization due to disturbance during construction. A temporary cofferdam pumping system will be used to divert the stream around the constructio� site as needed. Any areas affected by temporary cofferdam system wiil be restored to pre-project conditions. All Best Management Practices will be utilized during the course of the project. The Project will be constructed using typical heavy equipment (trackhoe, backhoe, etc.) 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including ali prior phases) in the past? ❑ Yes � No ❑ Unknown Comments: Jurisdictional stream determination made by Division 12 DEO. 4b. If the Corps made the jurisdictional determination, what type � preliminary 0 Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Name (if known): Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. Page 3 of 12 PCN Form — Version 1.3 December 10, 2008 Version 5. Project History 5a. Have permits or certifications been requested or obtained for � yes � No ❑ Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ❑ Yes � No 6b. If yes, explain. Page 4 of 12 PCN Form — Version 1.3 December 10. 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that appiy): ❑ Wetlands � Streams - tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction Page 5 of 12 PCN Form — Version 1.3 December 10, 2008 Version 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetiand area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forestad (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non-404, other) (acres) Tem ora W1 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P � T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3 b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number- (PER)or (Corps-404,1-0 stream length Permanent (P) or intermittent DWQ — non-404, width (linear Temporary (T) (INT)? other) (feet) feet) Impervious dikes � pER � Corps S1 ❑ P� T forconstruction of Cully's Branch � INT � DWQ 12 65 footings Inlet/outlet flood benches to re- S2 � P❑ T establish channel Cully's Branch � PER � Corps 12 50 dimensions after ❑ INT � DWQ removal of impervious dikes S3 � P 0 T Bank Stabilization UT to Cully's ❑ PER � Corps 1 25 Branch � INT � DWQ S4 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impaMs 75" 3i. Comments: * Permanent impacts Page 6 of 12 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number— (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent(P)or Tem ora 01 ❑P❑T 02 ❑P❑T 03 ❑P�T 04 ❑P❑T 4f. Total open water impacts 4g. Comments: 5. Pond or Lake Construction If ond or lake construction ro osed, then com lete the chaR below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) number of pond Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 Sf. Total Sg. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any im acts re uire miti ation, then ou MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar-Pamlico ❑ Other: Project is in which protected basin? ❑ Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number— Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Tem ora im act re uired? B1 ❑P❑T ❑Yes ❑ No B2 ❑P❑T ❑Yes ❑ No B3 ❑P❑T ❑Yes ❑ No 6h. Tota► buffer impacts 6i. Comments: Page 7 of 12 PCN Form — Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. Construction of inleUoutlet flood benches to re-establish channel dimensions after removal of impervious dikes used during consturction of conspan footings. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Minirnization of impacts by installing appropriate erosion control measures. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the SWte 2a. Does the project require Compensatory Mitigation for ❑ Yes � No impacts to Waters of the U.S. or Waters of the State? 2b. If yes, mitigafion is required by (check all that apply): ❑ DWQ ❑ Corps ❑ Mitigation bank 2c. If yes, which mitigation option will be used for this � payment to in-lieu fee program project? ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool �coid 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 8 of 12 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No buffer mitigation? 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. 6c. 6d. 6e. Zorie Reason for impact Total impact Multiplier Required mitigation (square feet) (square feet) Zone 1 3(2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: Page 9 of 12 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers identified � Y� � No within one of the NC Riparian Buffer Protection Rules? 1b. If yes, then is a diffuse flow plan included? If no, explain why. ❑ Yes ❑ No Comments: 2. Stormwater Mana emeM Plan 2a. What is the overall percent imperviousness of this project? 0% 2b. Does this project require a Stormwater Management Plan? ❑ Yes � No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: Complies with NCDOT's individuai NPDES permit NCS000250. 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Loca� Govemment 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Govemment Stormwater Review 3a. in which locai govemmenYs jurisdiction is this project? NA ❑ Phase II 3b. Which of the following locally-implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Pro rem Review ❑ Coastal counties ❑ HQW 4a. Which of the following state-implemented stormwater management programs apply � ORW (check all that apply): ❑ Session Law 2006-246 ❑ Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ❑ Yes ❑ No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ yes ❑ No 5b. Have alI of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 10 of 12 PCN Form — Version 1.3 December 10, 2008 Version F. Supplementary Information 7. Enviranmental Documentation (DWQ Requirement) 1 a. Does the project irnolve an expenditure of public (federal/state/local) funds or the � yes ❑ No use of public (federai/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes � No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized 6y the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ❑ Yes ❑ No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in vioiation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes � No or Riparian Buffer Rules (15A NCAC 2B A200)7 2b. Is this an after-the-fact permit application? ❑ Yes � No 2c. If you answered "yes' to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in � Yes � No additional development, which couid impact nearby downstream water quality? 3b. If you answered "yes° to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The project is a minimum criteria project which has low potential for cumulative/indirect impacts and will not result in additional development which could impact water quality. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. No wastewater generated from project. Page 11 of 12 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or � Yes � No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act � Yes � No impacts? ❑ Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? NC Natural Heritage Program database and onsite survey. 6. EsseMial Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes � No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? No salt marshes, oyster reefs, or seagrass beds located in vicinity of project. 7. Historic or Prehistoric Culturel Resources (Corps Requirement) 7a. WiII this project occur in or near an area that the state, federal or tribal govemments have designated as having historic or cultural preservation � Yes � No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? The project was reviewed/cleared by Cultural Resources, Project # U-10-0018. 11/7/11(Archaeology) and 11/8/11 (Historic Architecture). 6. Flood 2one Designation �Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes � No 8b. If yes, explain how project meets FEMA requirements: Sc. What source(s) did you use to make the floodplain determination? FEMA FIRM panal number: 3710378800E I P t� g a � � �L' � ii��f'' � � t r�f] .� ��.. tt��, /� �/ �L7 � f. � ApplicanUAgenYs Printed Name AppiicanUAgent's Signature Date (AgenYs signaYUre is valid only rf an authorization letterfrom the applicant is provided.) Page 12 of 12 PCN Form — Version 1.3 December 10, 2008 Version NCDOT HA7.ARDOUS SPILL BASIN CHECKLIST Division: 1 � County: Trerlell Project ID: 17BP.12.R.21 River Basin: Yadkin Bridge No: 117 Route: SR 1565 Water Quality Criteria: Stream: Culllys Branch Stream Crossing Blue Line On USGS ORW WSI WS II,III OR IV, Crossing Within O.Smi of W.S. Critical Area Roadwav Criteria: Route Designation- Arterial Urban Arterial Rural Additional Site Information: Is a Hazardous Spill Basin Required? Yes No � • iV` � Yes No I� Criteria Based Upon NCDOT `Best Management Practices far the Protection of Surface Waters" (March, 1997). Yes No iy ;� _ i� ' J Bridge #117 Replacement Stikeleather Road (SR 1565) Iredell County Vicinity Map N 0 0.45 0.9 1.8 Miles I i i i I i i i I ,�. � / �, � ,� � , , _ . >_ � � . _. . . �� „ . _ . �� � , , . , � �. ;��' � � � �- ' .z.�� , � � �. � � 3`" <� '�: � i; �. ! � �h �1��� I \I � � � (i 'S <* �" � � � ��-� . ^Ae'� ; . . '- .��� ,� �. � . i —� � � ' ,� � '� _ i j• -i �._ '� i � t' � �:� � � i _ . � � � �� � �� i ' i �_ � � y �� . ,.�s � — . �f/�C��r / t i -:f t �� r' . � e.,� , "hmub�; � - ' " f ' f i:' � � ; g���g � `�,� � r' �; 1`) ' �i ; � . Gl.. r�` � �� ` - i = �, r a �� � , � � n �,; . ; z� i � _` �, ; � ' ��l J � . '�. b / � �Y�e � I i � � _, - - — ' .,.= ' A' . ; � _ . 4� d�e#ii d �, ���/` ��`ti . `^u� _� � .EpOG,°�itoL r.y,i i . __ � 4i � � �..r.e ' t � I� , f , � � , . . . . . .� , . � �^ � , I � , � `_�, � ?" - , ' � . � (, i : . � � � _ ," � . z ��� � � � � �.��i�. � � — . ' � � �, o ,.. - � . . . .. , :... ,- , .... . .. . :: ir � -, , : �/. �_ � � : . � - t . . ._ , .. . ., . . . . , , i _ �. , _ .. G � � . . � .., . �i ,. . � �� Z. 10�� _ _ �-Q �• , I } 7 �' ..: � G_ i s. , � ; .:. - ' . �, � - : � �, �"tt/ ..- �� � v � ,.•,. . �' , ^�. # - �t� . ° - - - :aqa � q . r. "w . .� .. � �. .. ..., ` . ' . y ,J , �� �• � u�1. �,� . �.; • � �� __ � - . . ==A .. . / ' • ' ..• - . � ;. J �`°�, . • � . . � We.. � � �s�n� ���nt . � � _ � ,o�r . . .. .� .f F � ' z:< . . : � = r� .� � i BN ..,. � . � �., . � t . .,.. � . � ' ♦ ..�. . � ,� .::: ` . �, , 4ii .. �. - _.. � � � 31` .��, h5 1 a, • f T� x '•� •' •,; � , . - °�,c� �„ _ ;�;� , . .� � - . , , . , �, ; _ , r , ! . .. / .a: _ _ ,� -, : � i �. � �r .. ;°^ — ... ...., �_ . . � . :..� .. . ,. ,.... ., -A..�, _ � . ',,. �ri � . �.-,..���.. . . . ;,a .� � , , . �b,.. � . � W ,: � � , i .. .. F�,. .. . Name: HIDpENITE Location: 035.8796872° N 081.0322722° W Date: 6/5/2013 Caption: Bridge #117 Replacement, SR 1565 (Stikeleather Rd), Iredell Scale: 1 inch equals 2000 feet County, Cullys Branch, WS-IV, Yadkin River Basin NCDOT HAZARDOUS SPILL BASIN CHECKLIST Division: 1 �- County: Trer1P11 Project ID: 17BP.12.R.21 River Basin: Yadkin Bridge No: 117 Route: SR 1565 Water Quality Criteria: Stream: Culllys Branch Stream Crossing Blue Line On USGS ORW WSI WS II,III OR IV, Crossing Within O.Smi of W.S. Critical Area Roadway Criteria: Route Designation- Additional Site Information: Yes No Arterial Urban � - `� Arterial Rural , ,� Is a Hazardous Spill Basin Required? Yes No ; _ �. Criteria Based Upon NCDOT `Best Management Practices for the Protection of Surface Waters" (March, 1997). Yes No J'..... . iJ �__ ,� �r IMPERVIOUS DIKES ARE TO BE USED TO DIVERT THE STREAM AROUND THE CONSTRUCTION SITE AS NEEDED. ANY CONTAMINATED WATER WITHIN THE CONSTRUCTION SITE IS TO BE PUMPED INTO A SPECIAL STILLING BASIN. SILT FENCE IS TO BE PLACED AROUND STOCKPILE AND PROJECT AS WORK ALLOWS. UPON COMPLETION OF THE PROJECT ALL SILT FENCE IS TO BE PLACED AS NEEDED. SEED AND MULCH ALL DISTURBED AREAS. EXISTING STREAMBED MATERIAL TO BE -�_ �"--__ EXCAVATED AND STORED FOR USE �b{�``� ALONG PROPOSED STREAMBED. ���_ �O � �� PROPOSED 1 @ �,\ 20'X6' BY 42' LONG CON-SPAN 70 DEG SKEW �O � �\ � � ` `, � � , � CLASS II RIP RAP TO FACE THE � EDGE OF THE PROPOSED CHANNEL, EMBEDDING THE ROCK INTO THE '--y EXISTING STREAMBED. SLOPE THE - BANKS TO TIE INTO THE EXISTINCZ � CONTOURS. �_, Q� \' �fi�� . REMOVE EXISTING 18"RCP --C AND PLACE PROPOSED 18" DRAINAGE PIPE 30' O' 30' 60' 15' M � h' M > � � �, � � SHOP/ CUR�/ED GU!}RDRAIL R=fO' i / ° �� o/ 0 � � �; Q %i �� i �' ti' � � 0 z � 3 0 F O �. � �O j � i � i � i N ! � i --; i r i i i / / � -vY I / / / PROPOSED LATERAL V-DITCH WITH CLASS B RIPRAP LINER AND GEOTEXTILE PLACE PROPOSED 15" DRAWAGE PIPE PROP. CLASS B � RIP RAP WITH GEOTEXTILE _ _--'_ __�'_- -'. _,- -���� . _' �---'� � ,. Sp8 % i� _. , f � ' �/ � gRAN�N ,�� _ �UL�YS _ .-- -�o� CLASS II RIP RAP TO FACE THE EDGE OF THE PROPOSED CHANNEL /EMBEDDING THE ROCK INTO THE EXISTING STREAMBED. SLOPE THE —BANKS TO TIE INTO THE EXISTING CONTOURS. RIP RAP ALONG THE CHANNEL TO BE APPROX. 25' +/- EXISTING BRIDGE TO BE REMOVED l2th DlV NCDOT REPLACE BRIDGE WITH CULVERT, BRIDGE #ll7 STIKELEATHER ROAD IREDELL COUNTY WBS: l7BP.l2.R.2/ SR /565 4//3 E'.II� A. STREAM GRADIENT 873.5 —873.3 0.280 =0.25% 875 3 � 3 � 8�4 ��� ��`��w�� ��� 873 -------- - ---- ----- an 82.3' PROFILE & CRO55 SECTION (HORIZONTAL) PROFILE (VERTICAL) CROSS SECTION (VERTICAL 8]4' 8]2' 8]1' 870' 52.3' 47.3' 37.3' 1 1 � � � � � � i � � � � � � 1 1 � � � � � :•�� 22.2' 2.3' 17.7' PROPOSED CHANNEL GRADIENT = 0.95% 0' S' 10' 1S 20' 25' 30' 35' 4p' 45' S0' S5' 60' CRO55 SECTION TAKEN APPROX.113' DOWNSTREAM FROM THE FACE OF THE CON-SPAN ARCH. 880' 879' 878' B]]' 9 9' 876' BJS' 874' Q 873' 8]2' PROPOSED 1@ 2 0' x b' CON-SPAN 70 DEG SKEW STREAM GRADIENT 873.5 —873.4 O.1/65 =0.15% �3 �� � I �h ------ �'� _ �'�.�---------�_ U 'L �Z � J 57.7' 42.7' 52.7' 82.7' _ w s��Zl� y � � "�' �� ------ ���. ------- � 873 872 0' S' 10' 15' 20' ]5' 30' CROSS SECTION TAKEN APPROX. 61' UPSTREAM FROM THE CENTERLINE OF THE CON-SPAN ARCH. $2.�� ��2.�� �22.�� STREAM GRADIENT 874.0 —873.5 0.�/40 =1.25°/a PpO1ER 0.fFE�NCE NO. SHEEi NO. I7BP.I2.R,21 ec-awcorus w,v snen No. :oaowav oesi�u xroawucs ENGINEER ENGMEER CULVERT CONSTRUCTION SEQUENCE STA. 14 + 53 -L- 1. Close SR 1565 (STIKELEATHER ROAD) to Traffic as shown in ihe }roffic manogement plans. 2. Install perimeter erosion wn}rol devices as shown on EC-4. Place special stilling basins as direcfed by The Engineer 3. Remove exisiing bridge#480177 over Cully's Branch creek. 4. Construct impervious dikes to diveri stream oway from foundaTions for pipe arch wWert. 5. ConsTruc} proposed pipe arch culvert foundafions and install wlveH 6. Remove impervious dikes and return flow back To creek channel. J�r 't ... �.,, st,}�....— _:, ra u>u� ........ � �f i J?1 � 1"i } fY G��' i R`:'. . f.) ..;° 4t�' JG.� r' rµ. ?,r.;= F z TJf ' l.���l.i " J4,. -).r,, R t}�� f:f' . � s� r�,� �r. - c�� J .._: .;!, ri � - _ 5 iE?': ± --C`�r r - �✓-- :, 7r -C;«:� Fi,='.r ��,:s" v�a2.2a ;'iS?c:t�*�3tirG ^ �X're -�4`tL7) xi'* � 4":I,t'? � LJ �fi d S"'4 - c �7. .. Fls3 5%'.r�` T PY%) .. t�j 1�"� 'tl� � " f fiI v ,:� ,. x� � .� r ... . 1P '��*,` ?i7 ) t.-sr r � „`�j, €k Q �"3 �.,, mt � x .�r ,�7. r,; ti 5c.£ �tp `j ._. i..._�/ 11 3'--. a?`�t<7 �-0`� 'nd`- k t.li � x' .� <.3.z;� 5 '^�Ypi!I . � c �J ` 7 N�'y i? �.?t)t" .. r v� ��� ,c��s,b �r�� v3)- .,`�, . r .Jyr9%{J� � o "���-. � .....��"�.�,.� i` � � ! Q ��� i ty rr J . �: t ..�'l S i .- �.._�- . r � , �; . � , r..._. .__.. .-. see��oernn e __..,_ - " ; �.... , k �_ �"' ,_.�r- ,w" .n � -- �-^�k , � '_ , '. - . . PHASING 7. Complete any necessary Inlet/Ouilet channel improveme�Ts. 8. Remove special sTilling basins. 9. Complete roadway construction. i: � ��,^' r '` J -i�F � :,{ �l/ �-�•. � �r, �'I -( _L� / �"/�;�. . .::00 / � ;. � � 0 : J_ �� i ?�� � / .,�r �.�3= 3'�; r 6µ: u ,. 1 � '�*„ � �d � _ ��� .%�' EST.60 TONS ''�r � -' '^+ r E r C1A55 II RIP RAP 1 F E� �(� �' ,- j esr. ize sF E a 1 � �(,. i �, GEOTEXTILE � � �� � 3 r <�c,C j' i (, �� 4.. STILLING 1 1 : / �,...-.,.-.=�^��^"°""°,..�..�.-,,:. t F .,. t ,� ,„ �� , _.� a — ��_ ... 3 0 m �y � � � , t,^'L IMPERVIOUS 1� 3 � i� � DIKE � j q � erJ.O�E �. �.�� � � ,d' . -._. _ . . - _ , i, S ._.. _ � _ S _. .. � ..e..,;:�. o:....-.,... . � ... _ ... _.,:.; .. II.AVFPVI[lllf ` �� �� �d� iTvLfl-r �`� C5t'.J Cr' i �\_ !tll`� i� ��� =FtJ`i�Pi It Le,�Ff �_ i���,�-,- �1 2�y:?i� ...�. � �l,�L, i�. +r,�'i.'vti4) i l.. ., . . l l \ ,� PAasin�qllZ�gn 8/19/20t3 328:59 PM TGS EST.20 TONS CL45S II RIP RAP EST.75 SF GEOTEXTILE � � � Nqp 8 �SR�� � >`��� ::�.u�.a=� �.�ar�' ;>,.., = a .., ._,�. �. `_ J 1� �� —�....:.� _. . _ :r�°",. �. � � � �` ./ ... � SFE OETAIL A �R X` \ '^,. d0 A� t % ::mm [.�m�,.h xr J � � � � � �� � ��v3 � v".r l;-e � � A �� i ii ` i C}J � � 4 ryf � 4.. . l.. < i'f ..!'i'� .I n � �� � r ' � i �t� � +ti'L"JNV \ } ., r � CL B GP RhP � ` T�� �'�� en. i .orv 7. GEDiE%I.FABRIO � \ y� ESr 5 SY y,� �� \ ,. _ . V. _ T06, \• .. s .� � .a � \ :� '\ `� \ � . , �\ \ � ,\ wit'� �RC3E�C.T �x,>»�au�� ��� .- a'i'.�?.. 7 t i' ei�. H / Y �y i7 � f L'� .. � .,�"Y i�i�q� : .:1.,��1 ,^...��'9 � DETAIL B CUT DITCH I Nm m sroi�� r.em o�m sioP. Geote�iile-J � u.e �- e�aaa M�o- ri. iype olLiner docs B RyR p M.tl�. Fl. FROM -L- STA. 12+]5 TO L STA. 13+' EST.44 TONS RIP RAP EST 126 SY GEOTEXTLLE FA9RIC �- INSTALL PIPE(5) IN JLIRISDICTIONAL AREAS ACCORDMG TO NCDOT BEST MANAGEMENT PRACTICES FOR CONSTRUCTION AND MAINTENANCE ACTIVITIES hV+NUAL.