Loading...
HomeMy WebLinkAbout20120142 Ver 1_20120142_ Notice of Violation Letter_ DWR_20211022 Carpenter,Kristi From:Fine, Cary A Sent:Friday, October 22, 2021 3:07 PM To:Conchilla, Ryan; Chapman, Amy Cc:Blakley, Reuben; McKenzie, Michael L; Partin, John A; Young, Joshua M; DeWit, Benjamin J; James.C.Lastinger; King, Art C; LaBounty, Tim L; Young, Joshua M; Sullivan, Shelton Subject:RE: Notice of Violation Letter, DWR 20120142 Attachments:Permit Site 4 LT -L- #3.jpg; Permit Site 4 LT -L- #2.jpg; Permit Site 4 Basin ID 121.jpg; Permit Site 4 LT -L-.jpg; Permit Site 6 LT -L-.jpg; Permit Site 4 Basin ID 122.jpg Mr. Conchilla, As requested, please see the attached photos of the progress made to permit sites 4 & 6. Significant progress has been th made since the compliance review on October 13 and NCDOT continues to work with our contractor to promptly identify and correct site repairs as needed throughout the project. Considering this progress made, we would request th that NCDWR conduct a follow up compliance review on Tuesday October 26 or at the earliest convenience. If you have any questions or require additional information please do not hesitate to reach out. Thanks, Cary Fine, PE Resident Engineer NCDOT Highway Division 8 District 1 - Construction Office 336 318 4020 office 336 225 4237 mobile cafine@ncdot.gov 300 DOT Drive Asheboro, NC 27204 From: Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Sent: Thursday, October 21, 2021 4:15 PM To: Fine, Cary A <cafine@ncdot.gov>; Chapman, Amy <amy.chapman@ncdenr.gov> Cc: Blakley, Reuben <rblakley@ncdot.gov>; McKenzie, Michael L <mlmckenzie1@ncdot.gov>; Partin, John A <jpartin@ncdot.gov>; Young, Joshua M <jmyoung@ncdot.gov>; DeWit, Benjamin J <bjdewit@ncdot.gov>; James.C.Lastinger <james.c.lastinger@usace.army.mil>; King, Art C <acking@ncdot.gov>; LaBounty, Tim L <tim.labounty@ncdenr.gov>; Young, Joshua M <jmyoung@ncdot.gov>; Sullivan, Shelton <shelton.sullivan@ncdenr.gov> Subject: RE: Notice of Violation Letter, DWR 20120142 1 Mr. Fine, Thank you for taking the time to speak with me and providing updates on the site repairs. Providing photo documentation with stamped collection dates for the repairs listed in the NOV will greatly assist in compliance review and progress made. Current conditions at the remaining permit sites (1-12) should be evaluated and documented to identify potential concerns prior to the next site inspection. Let me know if I can provide further assistance at this time. Thanks- Ryan Conchilla, PWS Environmental Specialist II 401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8) Division of Water Resources, NC Department of Environmental Quality Ryan.Conchilla@ncdenr.gov From: Fine, Cary A <cafine@ncdot.gov> Sent: Wednesday, October 20, 2021 2:12 PM To: Conchilla, Ryan <ryan.conchilla@ncdenr.gov>; Chapman, Amy <amy.chapman@ncdenr.gov> Cc: Blakley, Reuben <rblakley@ncdot.gov>; McKenzie, Michael L <mlmckenzie1@ncdot.gov>; Partin, John A <jpartin@ncdot.gov>; Young, Joshua M <jmyoung@ncdot.gov>; DeWit, Benjamin J <bjdewit@ncdot.gov>; James.C.Lastinger <james.c.lastinger@usace.army.mil>; King, Art C <acking@ncdot.gov>; LaBounty, Tim L <tim.labounty@ncdenr.gov>; Young, Joshua M <jmyoung@ncdot.gov>; Sullivan, Shelton <shelton.sullivan@ncdenr.gov> Subject: RE: Notice of Violation Letter, DWR 20120142 Mr. Conchilla, Please see the attached response to the NOV issued October 15, 2021 on TIP project R-3421AB. If you have any questions or require additional information please do not hesitate to contact me. Thanks, Cary Fine, PE Resident Engineer NCDOT Highway Division 8 District 1 - Construction Office 336 318 4020 office 336 225 4237 mobile cafine@ncdot.gov 300 DOT Drive Asheboro, NC 27204 2 From: Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Sent: Friday, October 15, 2021 4:48:46 PM To: Norman, Patrick A <pnorman@ncdot.gov>; greg.martin@vecelliogrogan.com <greg.martin@vecelliogrogan.com>; 'james.c.lastinger@usace.army.mil' <james.c.lastinger@usace.army.mil>; Harris III, Philip S <psharris@ncdot.gov>; King, Art C <acking@ncdot.gov>; LaBounty, Tim L <tim.labounty@ncdenr.gov>; Young, Joshua M <jmyoung@ncdot.gov>; Sullivan, Shelton <shelton.sullivan@ncdenr.gov>; Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Subject: Notice of Violation Letter, DWR 20120142 All, This email is being sent to you because you have been identified as an electronic copy recipient of the subject document. If you have any questions about this email or the attached document, please contact Ryan Conchilla at ryan.conchilla@ncdenr.gov If you have General Certification questions please use the following link to access the site map for General Certifications on our Website: https://deq.nc.gov/about/divisions/water-resources/water-quality-permitting/401-buffer-permitting- branch/general. Sincerely, Kristi Lynn Carpenter Kristi Lynn Carpenter Administrative Assistant 401 & Buffer Transportation Permitting Branch Department of Environmental Quality Division of Water Resources 919.707.3872 office kristilynn.carpenter@ncdenr.gov th 512 N Salisbury Street, 12 Floor 1617 Mail Service Center Raleigh, NC 27699-1617 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Based on the current guidance to minimize the spread of COVID-19, the Department of Environmental Quality has adjusted operations to protect the health and safety of the staff and public. Many employees are working remotely or are on staggered shifts. To accommodate these staffing changes, all DEQ office locations are limiting public access to appointments only. Please check with the appropriate staff before visiting our offices, as we may be able to handle your requests by phone or email. We appreciate your patience as we continue to serve the public during this challenging time. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3