Loading...
HomeMy WebLinkAbout20120659_Email_20131002Euliss, Amy From: Euliss, Amy Sent: Wednesday, October 02, 201310:34 AM To: Suggs, Phillip H Cc: Braquet, Stephanie; Archer Sr, Wright; Panek, Lindsey F Subject: RE: Spainhour Mill Rd Bridge Phil, met Lindsey on site this morning, I asked that they remove the material that's accumulated behind the weir, and monitor the small delta in the river, Hopefully removing the material will prevent additional accumulation of material in the river. We'll have to keep a close watch on this area, as it looks like this project is going to be open for quite sometime. Let me know if you have any questions. Amy - - - -- Original Message---- - From; Suggs, Phillip H Sent; Tuesday, October 01, 2013 4;06 PM To: Archer Sr, Wright; Panek, Lindsey F Cc: Braquet, Stephanie; Euliss, Amy Subject: Spainhour Mill Rd Bridge With the water levels down, I recommended removing the accumulated silt in the rock lined ditch. Removing it from the stream will be mostly handwork if they want to avoid damaging those slopes. They have removed as much of the 57 stone and silt as they could earlier, asked in the report for the silt in the stream to be removed but would like input on whether its worth the additional disturbance at this point, will be out til Monday so we can talk then if needed. Kiera is back in so she will be around if needed. Thanks. Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.