HomeMy WebLinkAbout20051457 Ver 1_Review Doc's for Stakeholder meeting 9-1-11_20110817Strickland, Bev
From:
Wicker, Henry M JR SAW [ Henry .M.Wicker.JR @usace. army. mi1]
Sent:
Wednesday, August 17, 2011 2:04 PM
To:
gwood @lincolncounty.org; James.McRight @ncdenr.gov; John. Condrey @rutherfordcountync.gov;
Britt. Setzer @ncdenr.gov; linvillejr @earthlink.net-, Cyndi.Karoly @ncdenr.gov; Alan.Johnson @ncdenr.gov;
renee .gledhill- earley @ncdenr.gov; russtown @nccherokee.com; mholder @dot. state. nc. us-,
Jim.Mead @ncdenr.gov; fred.tarver @ncdenr.gov; turnerle @dhec.sc.gov; allen_ratzlaff @fws.gov;
Bryan_Tompkins @fws.gov; Fox.Rebecca @epamail.epa.gov; hortonjl @dhec.sc.gov;
gormancm @dhec.sc.gov; kfortner @gbpw.com; Rick.Howell @cityofshelby.com; marilyns @cityofkm.com;
Tom. Reeder @ncdenr.gov; Melba.Mcgee @ncdenr.gov; teweenot @yahoo.com; elammt @hotmail.com;
stevek @cityofkm.com; eporter @cityofkm.com; chris.goudreau @ncwildlife.org;
ian.mcmillan @ncdenr.gov; Laycock.Kelly @epamail.epa.gov; Jones, Amanda D SAW; Jones, Scott SAW;
Brian McCrodden; Karen. Higgins @ncdenr.gov; danny .searcy @rutherfordcountync.gov
Cc:
Pugh, Robin; O'Quinn, Barney; keith.webb @mcgillengineers.com; pam boaze; CCSD Manager
Subject:
Review documents for USACE Stakeholder /agency meeting on September 1, 2011, from 10:00 to 12:00,
in Shelby, NC to comment on the draft alternative analysis. (UNCLASSIFIED)
Classification: UNCLASSIFIED
Caveats: NONE
Hello Everyone,
As stated in my July 29, 2011 E -mail, you are invited to the US Army Corps of Engineers
Stakeholder /Agency meeting September 1, 2011, from 10:00 to 12:00, in Shelby, NC. The
location of this meeting is the Commissioners Chambers, second floor of the County
Administration Building, 311 East Marion Street, Shelby, NC.
For Directions see this google maps link:
http: / /maps.google.com/ maps ?hl= en &biw= 1259& bih = 845 &q = 311 %2OEast %20Marion %2OSt
reet% 2C% 20Shelby% 2C% 20NC.& gs_ sm= s& gs_ upl= 254551254551012658011111010101014691
46914 - 11110 &um= 1 &ie= UTF- 8 &sa =N &tab =wl
Meeting Purpose.
The purpose of this meeting is to get comments and clarify any questions you may have on the
preliminary alternative analysis being developed for the environmental impact statement (EIS)
on Cleveland County Water's proposal to construct a water supply reservoir on the First Broad
River. We will accept comments on the alternatives analysis for 2 weeks after the meeting
(September 15). We previously had a stakeholder /agency meeting on February 18, 2009, in which
we requested comments on the "Purpose and Need" developed for the EIS and have incorporated
them into that section of the document. We are not asking comments on the "Purpose and Need"
section at this time, but
are providing it as a reference document to the "Alternative Analysis ".
FTP Site to down load Documents.
Because of the large size of the files, the reports are not attached to this email, but are
available on the ARCADIS ftp site. To download the reports, go to
http : / /filetransfer.arcadis- us.com
< httD : / /filetransfer.arcadis- us.com> .
Provide the following (case sensitive) user name and password - Username:
arcadisftp Password: Tr4nsf3R. Then click "Login." Select "From ARCADIS"
then the "First Broad River Reservoir EIS" folder. The alternatives report
and the purpose and need report are located in that folder.
Please print copies of these documents and bring them with you to the meeting. We will have
some handouts available at the meeting, but will not have enough for everyone.
1
Teleconference capabilities.
I am presently working on providing teleconference capabilities for our meeting. I will
provide teleconference information as soon as I have worked out the logistics.
See you September 1!
Henry Wicker
Henry Wicker
Project Manager
Regulatory Division
U.S. Army Corps of Engineers
69 Darlington Ave
Wilmington NC, 28402
(910) 251 -4930 (Ph)
(910) 251 -4025 (Fax)
Classification: UNCLASSIFIED
Caveats: NONE
N