HomeMy WebLinkAbout20051457 Ver 1_Re Teleconference information for USACE Stakeholderagency meeting on September 1 2011 from 1000.msg_20110824Strickland, Bev
From: Reeder, Tom [tom.reeder @ncdenr.gov]
Sent: Wednesday, August 24, 2011 4:08 PM
To: Wicker, Henry M JR SAW; CCSD Manager
Subject: Re: Teleconference information for USACE Stakeholder /agency meeting on September 1, 2011, from
10:00 to 12:00, in Shelby, NC (UNCLASSIFIED)
Henry / Butch - I will be participating in this meeting by the teleconference. I have an
employee retiring on that day after 30 years of service and I need to be in Raleigh that
afternoon to present him with his awards. Thanks.
Tom Reeder
Director, NC Division of Water Resources
Phone: 919 - 715 -3045
email: tom.reeder(@ncdenr.gov
On 8/18/11 1:16 PM, "Wicker, Henry M 7R SAW"
< Henry .M.Wicker.JR(@usace.armv.mil> wrote:
>Classification: UNCLASSIFIED
>Caveats: NONE
>Hello everyone,
>If you are not able to come to the USACE
>September 1, 2011, from 10:00 to 12:00,
>to participate via teleconference. Here
>The call in number is (888)296 -1938
>The Participant code is 219159
> Thanks you for your participation,
>Henry Wicker
Stakeholder /agency meeting on
in Shelby, NC, you will be able
is the teleconference information:
> - - - -- Original Message -----
>From: Wicker, Henry M 7R SAW
>Sent: Wednesday, August 17, 2011 2:04 PM
>To: 'gwood @lincolncounty.org'; 'James.McRight @ncdenr.gov';
>' john. Condrey @rutherfordcountync.gov'; 'Britt.Setzer @ncdenr.gov';
>'linvillejr @earthlink.net'; 'Cyndi.Karoly @ncdenr.gov';
>'Alan.Johnson @ncdenr.gov'; 'renee .gledhill- earley @ncdenr.gov';
>'russtown @nccherokee.com'; 'mholder @dot.state.nc.us';
>'7im.Mead @ncdenr.gov'; 'fred.tarver @ncdenr.gov';
>'turnerle @dhec.sc.gov'; 'allen_ratzlaff @fws.gov';
>'Bryan_Tompkins @fws.gov'; 'Fox.Rebecca @epamail.epa.gov';
>'hortonjl @dhec.sc.gov'; 'gormancm @dhec.sc.gov'; 'kfortner @gbpw.com';
1
> 'Rick.Howell @cityofshelby.com'; 'marilyns @cityofkm.com';
>'Tom.Reeder @ncdenr.gov'; 'Melba.Mcgee @ncdenr.gov';
>'teweenot @yahoo.com'; 'elammt @hotmail.com'; 'stevek @cityofkm.com';
>'eporter @cityofkm.com'; ' chris.goudreau @ncwildlife.org';
>'ian.mcmillan @ncdenr.gov'; ' Laycock.Kelly @epamail.epa.gov'; Jones,
>Amanda D SAW; Jones, Scott SAW; 'Brian McCrodden';
>'Karen.Higgins @ ncdenr.gov'; ' danny .searcy @rutherfordcountync.gov'
>Cc: 'Pugh, Robin'; O'Quinn, Barney; keith .webb(@mcgillengineers.com; pam
>boaze; 'CCSD Manager'
>Subject: Review documents for USACE Stakeholder /agency meeting on
> September 1, 2011, from 10:00 to 12:00, in Shelby, NC to comment on the
>draft alternative analysis. (UNCLASSIFIED)
>Classification: UNCLASSIFIED
>Caveats: NONE
>Hello Everyone,
> As stated in my July 29, 2011 E -mail, you are invited to the US Army
>Corps of Engineers Stakeholder /Agency meeting September 1, 2011, from
>10:00
>to 12:00, in Shelby, NC. The location of this meeting is the
>Commissioners Chambers, second floor of the County Administration
>Building, 311 East Marion Street, Shelby, NC.
>For Directions see this google maps link:
>http: / /maps.google.com/ maps ?hl= en &biw= 1259 &bih = 845 &q = 311 %20East %20Mario
>n %2
>0St
> reet% 2C% 20Shelby %2C %20NC. &gs_sm= s &gs_upl= 254551254551012658011111010101
>014
>691
>46914- 11110 &um= 1 &ie= UTF- 8 &sa =N &tab =wl
>Meeting Purpose.
>The purpose of this meeting is to get comments and clarify any
>questions you may have on the preliminary alternative analysis being
>developed for the environmental impact statement (EIS) on Cleveland
> County Water's proposal to construct a water supply reservoir on the
>First Broad River. We will accept comments on the alternatives analysis
>for 2 weeks after the meeting (September 15). We previously had a
>stakeholder /agency meeting on February 18, 2009, in which we requested
> comments on the "Purpose and Need"
>developed
>for the EIS and have incorporated them into that section of the document.
> We
>are not asking comments on the "Purpose and Need" section at this time,
>but are providing it as a reference document to the "Alternative
> Analysis".
>FTP Site to down load Documents.
>Because of the large size of the files, the reports are not attached to
>this email, but are available on the ARCADIS ftp site. To download the
> reports, go to http : / /filetransfer.arcadis- us.com
> < http : / /filetransfer.arcadis- us.com> .
>Provide the following (case sensitive) user name and password - Username:
N
>arcadisftp Password: Tr4nsf3R. Then click "Login." Select "From
>ARCADIS"
>then the "First Broad River Reservoir EIS" folder. The alternatives
>report
>and the purpose and need report are located in that folder.
>Please print copies of these documents and bring them with you to the
>meeting. We will have some handouts available at the meeting, but will
>not have enough for everyone.
> Teleconference capabilities.
>I am presently working on providing teleconference capabilities for our
>meeting. I will provide teleconference information as soon as I have
>worked out the logistics.
>See you September 1!
>Henry Wicker
>Henry Wicker
>Project Manager
>Regulatory Division
>U.S. Army Corps of Engineers
>69 Darlington Ave
>Wilmington NC, 28402
>(910) 251 -4930 (Ph)
>(910) 251 -4025 (Fax)
>Classification: UNCLASSIFIED
>Caveats: NONE
>Classification: UNCLASSIFIED
>Caveats: NONE
3