HomeMy WebLinkAbout20051457 Ver 1_RE Revised 8-15-12 Draft.msg_20120820Strickland, Bev
From: Peele, Linwood [linwood.peele @ncdenr.gov]
Sent: Monday, August 20, 2012 11:07 AM
To: Reeder, Tom; Fransen, Tom
Cc: Ramsey, Dennis R
Subject: RE: Revised 8 -15 -12 Draft
Will do. I will incorporate comments and send when we receive Tom Fransen's comments.
Thanks,
Li nwood
From: Reeder, Tom
Sent: Monday, August 20, 2012 11:01 AM
To: Peele, Linwood; Fransen, Tom
Subject: Re: Revised 8 -15 -12 Draft
Here are some minor comments from me. I like to idea of sending this out to Jim and Britt to get their input. However, I think
that we should ask them to keep the draft report to themselves. Thanks.
Tom Reeder
Director, NC Division of Water Resources
Phone: 919 - 707 -9027
email: tom.reeder @ncdenr.gov
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties.
From: " Peele, Linwood" <linwood.peele @ncdenr.gov>
Date: Wed, 15 Aug 2012 15:25:50 -0400
To: Tom Reeder <tom.reeder @ncdenr.gov >, " Fransen, Tom" <tom.fransen @ncdenr.gov>
Subject: FW: Revised 8 -15 -12 Draft
HEM112m,
Please see attached a preliminary draft report for the water systems in the Broad River Basin, please review and
comment.
Thanks,
Li nwood
From: Ramsey, Dennis R
Sent: Wednesday, August 15, 2012 2:48 PM
To: Peele, Linwood; Spencer, Lee G
Subject: Revised 8 -15 -12 Draft
Linwood and Lee
Please find attached a revised version of the Very Preliminary Analysis of Future Water Supply Needs and Availability for
2060— Broad River Basin. It is the 8 -15 -12 PM DRAFT. The only change is that I updated the population projections on
page 2 based on the most recent information from the NC OSBM. The new numbers show an even slower rate of
growth in the basin than the previous numbers from the March 2012 report. An example is that the projected rate of
growth in Cleveland County from 2010 to 2030 dropped from 5% to 1.4 %.
Thanks
Dennis