Loading...
HomeMy WebLinkAbout20210317 Ver 1_Certificate of Completion_20210928GOY COOPER Governor DIONNE DELLhGATTI , Secretary Fa' S. DANIEL SMITH NORTH Director Environn WRProjectNo.: 40d /- 0317 County: Applicant: Tim r9ty F /In & Project Name: Date of Issuance of 401 Water Quality Certificate of Completion Upon completion of all work approved within the 40 Rules, and any subsequent modifications, the applica Buffer Permitting Unit, North Carolina Division of y NC, 27699-1650. This form may be returned to DW the project engineer. It is not necessary to send certi Applicant's Certification I, 7,1rh O_7/ti 1Fh7,b1 "!Ps.�,h diligence was u d n the observationb fthe constn within substantial compliance and intent of the 401 approved plans and specifications, a other suppc Signature: D Agent's Certification I, hi diligence was used in the observation of the constn within substantial compliance and intent of the 401 approved plans and specifications, and other suppo. Signature: If this project was designed by a Certified Professil I, , as Engineer, Landscape Architect, Surveyor, etc.) in t observe (periodically, weekly, full time) the constr the best of my abilities, due care and diligence was construction was observed to be built within substo Certification and Buffer Rules, the approved plans Signature: Date North Carollm _ Asheville Regic om'u:�14a�mnownr� /`� 828296AS00 RECENED SEP 2 8 2021 RESOURCES I PERMrmlva Water Quality Certification or applicable Buffer t is required to return this certificate to the 401 and ner Resources, 1650 Mail Service Center, Raleigh, by the applicant, the applicant's authorized agent, or sates from all of these. 7y state that, to the best of my abilities, due care and on such that the construction was observed to be built ater Quality Certification and Buffer Rules, the g materials. state that, to the best of my abilities, due care and i such that the construction was observed to be built er Quality Certification and Buffer Rules, the materials. Iuly registered Professional (i.e., State of North Carolina, having been authorized to ion of the project, for the Permitee hereby state that, to ed in the observation of the construction such that the al compliance and intent of the 401 Water Quality d specifications, and other supporting materials. Registration No. nt of Environmental Quality I Division of Water Resources 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778