Loading...
HomeMy WebLinkAbout20200311 Ver 1_Certifiate of Completion_20211012NCDWR Project No.: o20 — 03 11 Applicant: Project Name: Date of Issuance of 401 Water Quality Certificate of Completion Upon completion of all work approved within the 4 Rules, and any subsequent modifications, the appli Wetland & Buffer Permitting Unit, North Carolina I Raleigh, NC, 27699-1617. This form may be return authorized agent, or the project engineer. It is not Applicant's Certification I, ('ha�Les QDNNie Mil16s n and diligence was used in the observation of the i to be built within substantial compliance and inte Rules, the approved plans and specifications, and Signature: Agent's Certification and diligence was used in the observation of the i to be built within substantial compliance and inte Rules, the approved plans and specifications, and Signature: Engineer's Certification Partial Final of North Carolina, having been authorized to obse the project for the Permittee hereby state that, to used in the observation of the construction such tl substantial compliance and intent of the 401 Wate plans and specifications, and other supporting ma' Signature County: Q. o W a t`1 Co u O X Pack Lak Water Quality Certification or applicable Buffer it is required to return this certificate to the 401 sion of Water Resources, 1617 Mail Service Center, to NCDWR by the applicant, the applicant's !cessary to send certificates from all of these. ?by state that, to the best of my abilities, due care istruction such that the construction was observed of the 401 Water Quality Certification and Buffer supporting materials. Date: q-,;�o-aaa state that, to the best of my abilities, due care action such that the construction was observed of the 401 Water Quality Certification and Buffer her supporting materials. RECEIVED Date: 21 DEOVATER RESOURCES 401 & BUFFER pEWIT7ING s a duly registered Professional Engineer in the State e (periodically, weekly, full time) the construction of ie best of my abilities, due care and diligence was t the construction was observed to be built within Quality Certification and Buffer Rules, the approved No. Date