Loading...
HomeMy WebLinkAbout20210994 Ver 1_Certificate of Completion_20210831NCDWR Project No.: 21-0 el q 4 Applicant: Project Name: ��� � )MPLETION Np� �\\ County: CA fa VDCA Lch'[a WakcAoy1T -14y�b & Date of Issuance of 401 Water Quality Certificate of Completion Upon completion of all work approved within the Rules, and any subsequent modifications, the app Wetland & Buffer Permitting Unit, North Carolina Raleigh, NC, 27699-1617. This form may be retur authorized agent, or the project engineer. It is no Applicant's Certification 1,e1�� LehCla 11 and diligence was used in the observation of the i to be built within substantial compliance and inte Rules, the approved plans and specifications, and Signature: Agent's Certification 1, NIA 1- and diligence was used in the observation of the i to be built within substantial compliance and inte Rules, the approved plans and specifications, and Signature: Engineer's Certification Partial Final of North Carolina, having been authorized to obs the project forthe Permittee hereby state that, t used in the observation of the construction such substantial compliance and intent of the 401 Wa plans and specifications, and other supporting m Signature A/l ok 9111 svifku, wo'iv 7 Ckk%-&F10hov, . Kvck, NC. S "i. -10u -2I7 7Z3gi 01 Water Quality Certification or applicable Buffer cant is required to ret rn this certificate to the 401 iivision of Water Resources, 1617 Mail Service Center, ad to NCDWR by the applicant, the applicant's necessary to send certificates from all of these. state that, to the best of my abilities, due care fiction such that the construction was observed of the 401 Water Quality Certification and Buffer supporting materials. Date: gIJ�Izl 2by state that, to the best of my abilities, due care istruction such that the construction was observed of the 401 Water Quality Certification and Buffer supporting materials. Date: Al IA as a duly registered Professional Engineer in the State ve (periodically, weekly, full time) the construction of the best of my abilities, due care and diligence was at the construction was observed to be built within r quality Certification and Buffer Rules, the approved No. tj lk Date N