Loading...
HomeMy WebLinkAbout20201084 Ver 1_Certificate of Completion_20210928ROY COOPER Governor MICHAEL S. REGAN secretary S. DANIEL SMITH Director WR Project No.: Applicant: Project Name: Date of Issuance of 401 Water Quality Certificate of Completion NORTH Upon completion of all work approved within the 40 Rules, and any subsequent modifications, the applice Buffer Permitting Unit, North Carolina Division of NC, 27699-1650. This form may be returned to DW the project engineer. It is not necessary to send certi App an's rlticain 1, tV� i f i hi diligence was used in the obsery ton of the cousin within substantia compliance an intent of the 401 approved pAnsU sAeciflAtions, and other suppo: Signature: Agent's Certification I, , hi diligence was used in the observation of the cousin within substantial compliance and intent of the 401 approved plans and specifications, and other suppo Signature: If this project was designed by a Certified I, , as Engineer, Landscape Architect, Surveyor, etc.) in t observe (periodically, weekly, full time) the constn the best of my abilities, due care and diligence was construction was observed to be built within substa Certification and Buffer Rules, the approved plans Signature: Date North Carolina Del Asheville Regional wm,+ca�arva om�mmmowm.,mao+nr 828.2 fi.4500 RECEIVED SEP 2 8 202, 40E$ BUFFER PEERM�HQ Coo Water Quality Certification or applicable Buffer t is required to return this certificate to the 401 and 3ter Resources, 1650 Mail Service Center, Raleigh, by the applicant, the applicant's authorized agent, or sates from all of these. state that, to the best of my abilities, due care and such that the construction was observed to be built r Quality Certification and Buffer Rules, the state that, to the best of my abilities, due care and i such that the construction was observed to be built -r Quality Certification and Buffer Rules, the materials. luly registered Professional (i.e., State of North Carolina, having been authorized to ion of the project, for the Permitee hereby state that, to ed in the observation of the construction such that the al compliance and intent of the 401 Water Quality d specifications, and other supporting materials. Registration No. I Division of Water Resources 12090 U.S. Highway 70 1 Swannanoa. North Carolina 28778