Loading...
HomeMy WebLinkAbout20191006 Ver 3_401 Request Attachment_20211020 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J.ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL ANALYSIS UNIT 1598 MAIL SERVICE CENTER RALEIGH, NC 27699-1598 Telephone: (919) 707-6000 Fax: (919) 250-4224 Customer Service: 1-877-368-4968 Website: ncdot.gov Location: 1000 BIRCH DRIVE RALEIGH, NC 27610 October 20, 2021 U.S. Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587-4346 ATTN: Mr. Monte Matthews NCDOT Coordinator Subject: Request for Modification to Section 404 Individual Permit and Section 401 Water Quality Certification for the I-40/I-77 interchange improvements including I-40 from west of SR 2003 (Radio Road) to SR 2158 (Old Mocksville Road) and I-77 from south of SR 2321 (East Broad Street) to south of SR 2171 (Jane Sowers Road) in Iredell County. Division 12, TIP No. I-3819B. Debit $570.00 from WBS 34192.3.2. References: 1) Section 404 Individual Permit, Action ID No. SAW-2018-01504, issued January 21, 2020, modified February 25, 2021; 2) Section 401 Water Quality Certification No. WQC004203, NCDWR Project No. 20191006 v.2, issued February 12, 2021. Dear Sir: The purpose of this letter is to request a modification to the United States Army Corps of Engineers (USACE) Section 404 Individual Permit and associated North Carolina Division of Water Resources (NCDWR) Section 401 Water Quality Certification for the above referenced project. Revisions resulting in changes to permitted impacts have been made to one impact site (Site 2) and one impact site (Site 7A) has been added. Both sites are discussed in detail below. Previously permitted stream impacts included 3,213 linear feet of permanent stream impacts (which includes 1,047 linear feet of stream bank stabilization) and 471 linear feet (0.10 acre) of temporary stream impacts. The total permanent wetland impacts previously permitted for roadway construction and utilities was 1.55 acres. Previously permitted wetland impacts for roadway construction included 1.39 acres of permanent wetland impacts (1.06 acres of permanent fill and 0.33 acre of mechanized clearing) and 2.66 acres of temporary fill in wetlands. Previously permitted impacts associated with utilities included 0.16 acre of mechanized clearing and 0.27 acre Page 2 of 6 of temporary wetland fill impacts (permanent fill in wetlands and hand clearing impacts were <0.01 acre). The revised stream impacts for the project total 3,305 linear feet of permanent stream impacts (which includes 1,139 linear feet of stream bank stabilization impacts) and 482 linear feet (0.10 acre) of temporary stream impacts. The revised wetland impacts for roadway construction include 1.40 acres of permanent wetland impacts (1.07 acres of permanent fill and 0.33 acre of mechanized clearing), and 2.64 acre of temporary wetland fill impacts. There are no changes to utilities impacts; therefore, the revised total permanent wetland impacts proposed for roadway construction and utilities is 1.56 acres. This modification will result in 92 linear feet of additional stream bank stabilization impacts, 11 linear feet of additional temporary stream impacts, and 0.01 acre of additional permanent wetland fill impacts. There will be 0.02 acre less temporary wetland fill impacts than previously permitted. A summary of the changes is shown in Table 1 below. Table 1 – Summary of changes to impacts* Impact Type Previously Permitted Impacts Proposed Permit Modification Difference Roadway Impacts Permanent Stream Impacts 3,213 3,305 +92 Bank Stabilization Impacts 1,047 1,139 +92 Temporary Stream Impacts 471 482 +11 Permanent Wetland Fill 1.06 1.07 +0.011 Mechanized Clearing in Wetlands 0.33 0.33 0 Hand Clearing in Wetlands 0 0 0 Temporary Wetland Fill 2.66 2.64 -0.021 Utility Impacts Permanent Wetland Fill < 0.01 < 0.01 0 Mechanized Clearing in Wetlands 0.16 0.16 0 Hand Clearing in Wetlands < 0.01 < 0.01 0 Temporary Wetland Fill 0.27 0.27 0 *Stream impacts are in linear feet. Wetland impacts are in acres. 1The impact change was 0.014 acre. Differences were calculated using impact totals. Please see the enclosed DWR Pre-Filing Meeting Request Form, revised DMS acceptance letter, revised permit drawings, and as-built plans showing changes to permitted impacts at Site 2 and the addition of impact Site 7A. These impact modifications have been constructed and are the result of field changes approved by NCDWR prior to receiving this permit modification approval. These changes are summarized below. Summary of Impacts to Waters of the U.S. Tables 2 and 3 summarize the permitted and revised impacts to jurisdictional water resources for the project. Changes to permitted impacts are shown with a strikethrough and revisions are shown in red text. A narrative describing the revisions made to the two permit impact sites are presented in the following section. Page 3 of 6 Table 2 – I-3819B Wetland Impacts* Permit Site Wetland Number Wetland Size ac Permanent Fill in Wetlands ac Temporary Fill in Wetlands1 ac Mechanized Clearing ac Impacts Requiring Mitigation ac 2 WC 2.94 0.32 -- 0.09 0.41 2 WC/WD 2.94/9.57 0.02 0.042 0.62 0.612 0.02 0.05 0.06 3 WF 0.31 <0.01 -- 0.01 0.02 4 WD 9.57 -- -- 0.02 0.02 5 WD 9.57 0.03 2.04 0.05 0.09 8 WH 0.08 <0.01 -- <0.01 0.01 9 WK 1.20 0.40 -- 0.08 0.47 11 WAN 0.21 0.19 -- 0.02 0.21 26 WI 0.13 0.09 -- 0.04 0.13 Total Wetland Impacts3 1.06 1.072 2.66 2.642 0.33 1.39 1.404 *All wetlands impacted are riparian. 1Temporary fill impacts will result from the use of mats and crane barges. 2The impact change was 0.014 acre. Values are based on rounding. 3Values are based on rounding, due to calculating totals with actual numbers to the thousandths. 4When permanent wetland impacts resulting from utilities are included, total impacts requiring mitigation are 1.56 acres. Table 3 – I-3819B Stream Impacts Permit Site Stream Name/ NRTR ID Status/ Class Permanent Temporary Channel Impacts ac (lf) USACE Required Mitigation lf NCDWR Required Mitigation lf Channel Impacts lf (ac) Bank Stabilization lf (ac) 2 UT to Fourth Creek SJ Perennial C -- 42 (<0.01) 115 (0.02) <0.01 (20) (10) -- -- 3 UT to Fourth Creek SI Perennial C 206 (0.02) -- <0.01 (10) 206 -- 5 UT to Fourth Creek SJ Perennial C -- -- 0.02 (77) -- -- 6 Fourth Creek Perennial C -- 12 (<0.01) <0.01 (20) -- -- 7 Fourth Creek Perennial C -- 12 (<0.01) <0.01 (20) -- -- 7A Fourth Creek Perennial C -- 19 (<0.01) <0.01 (21) -- -- 9 UT to Fourth Creek SL Perennial C 747 (0.07) -- <0.01 (10) 747 747 Page 4 of 6 Table 3 – I-3819B Stream Impacts (continued) Permit Site Stream Name/ NRTR ID Status/ Class Permanent Temporary Channel Impacts ac (lf) USACE Required Mitigation lf NCDWR Required Mitigation lf Channel Impacts lf (ac) Bank Stabilization lf (ac) 9A UT to Fourth Creek SK Perennial C 0.01 (50) 10 UT to Fourth Creek SK Perennial C -- 25 (<0.01) <0.01 (20) -- -- 12 UT to Fourth Creek SK Perennial C 10 (<0.01) -- 0.01 (54) 10 -- 13 UT to Fourth Creek SL Perennial C 17 (<0.01) 44 (<0.01) <0.01 (10) 17 17 14 UT to Fourth Creek SX Intermittent C 17 (<0.01) -- <0.01 (10) 17 -- 15 UT to Fourth Creek SX Intermittent C -- 11 (<0.01) <0.01 (20) -- -- 16 UT to Fourth Creek SX Intermittent C 113 (0.01) -- <0.01 (10) 113 -- 17 UT to Fourth Creek SX Perennial C 114 (0.02) -- <0.01 (14) 114 -- 18 UT to Fourth Creek SW Perennial C 72 (0.01) -- <0.01 (10) 72 -- 19 UT to Fourth Creek SW Perennial C 34 (<0.01) -- -- 34 -- 20 UT to Fourth Creek SBA Perennial C 61 (0.01) -- <0.01 (10) 61 -- 21 UT to Fourth Creek ST Perennial C 176 (0.10) -- <0.01 (21) 176 176 22 UT to Fourth Creek ST Perennial C 455 (0.18) 901 (0.34) -- 455 455 23 UT to Fourth Creek ST Perennial C -- -- <0.01 (33) -- -- 24 UT to Fourth Creek SU Perennial C 49 (<0.01) -- 0.01 (10) 49 -- 25 UT to Fourth Creek SU Perennial C 31 (<0.01) -- <0.01 (21) 31 -- 27 UT to Fourth Creek SR Perennial C 48 (0.01) -- <0.01 (10) 48 -- 28 UT to Beaver Creek SO Perennial C 16 (<0.01) -- <0.01 (11) 16 -- Total Stream Impacts 2166 1047 1139 0.10* (471) (482) 2166 1395 3213 3305 * Value are based on rounding. Page 5 of 6 Permit Impact Site Modifications (shown in revised permit drawings): Site 2 (Permit Drawing Sheet 2) – This site has been updated to include riprap bank stabilization along stream SJ under the footprint of the constructed three-lane ramp bridge in this location. Because the bridge is low, the area underneath may not receive adequate sunlight to revegetate; therefore, at the request of Donna Hood with the NCDWR, Class II riprap was installed along the stream banks. Permanent stream bank stabilization impacts increased from 42 linear feet to 115 linear feet, which is 73 linear feet of additional impacts. Temporary stream impacts decreased from 20 linear feet to 10 linear feet, which is 10 linear feet less of impacts. A section of the bank stabilization riprap was installed within wetland WD in order to reduce the potential for future erosion issues, resulting in minor additional permanent wetland impacts. The extent of the riprap was reviewed in the field and agreed to by NCDOT, Lane Construction, and NCDWR. This area (0.014 acre) was previously permitted as temporary wetland fill impacts and has been revised to permanent wetland fill impacts. Temporary wetland fill impacts decreased from 0.62 acre to 0.61 acre and permanent wetland fill impacts increased from 0.02 acre to 0.04 acre. New Permit Impact Site (shown in revised permit drawings): Site 7A (Permit Drawing Sheet 46) – This area was reviewed in the field by NCDWR, NCDOT, and Lane Construction. Upon review, a section of stream bank erosion along Fourth Creek near the new bridge bent was noted. This area is prone to flooding and the bank has experienced erosion during past flooding events. At the request of Donna Hood, Class II riprap was installed along the stream bank to provide stabilization in this location. Impacts resulting from this addition of riprap included 19 linear feet of permanent stream bank stabilization impacts and 21 linear feet of temporary stream impacts. Revised Compensatory Mitigation The North Carolina Division of Mitigation Services (NCDMS) previously provided compensatory mitigation for 2,166 linear of permanent stream impacts and 1.55 acre of permanent riparian wetland impacts, as referenced in the February 12, 2021 Section 404 Individual Permit issued from the USACE and the Section 401 WQC from NCDWR issued on February 25, 2021. Of the revised permanent stream impacts totaling 3,305 linear feet for this modification, 1,139 linear feet are the result of bank stabilization and are not considered loss of waters and therefore do not require mitigation from USACE or NCDWR. After the revisions due to changes in the field, permanent stream impacts that require mitigation from USACE for this project have not changed from the previous DMS mitigation acceptance. The revised permanent wetland impacts for this project total 1.56 acres and therefore this modification will require additional mitigation for 0.01 acre of permanent riparian wetland impacts. A revised DMS acceptance letter reflecting this change was issued and received on October 15, 2021 (attached). NCDOT requests to modify the permit for this project. Application is hereby made for modification of the USACE Section 404 permit and the Section 401 WQC from NCDWR as required for the above-described activities. We have provided a method of debiting $570.00 to be submitted to the NCDWR for processing the WQC renewal for I-3819B, as noted in the subject line of this application. Page 6 of 6 A copy of this permit application and its distribution list will be posted in the NCDOT website at http://connect.ncdot.gov/resources/Environmental. Thank you for your assistance with this project. If you have any questions or need additional information, please contact Erin Cheely at either ekcheely@ncdot.gov or (919) 707-6108. Sincerely, Philip S. Harris III, P.E., C.P.M. Environmental Analysis Unit Head cc: NCDOT Permit Application Standard Distribution List DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Ple ase list all e xisting proje ct ID's associate d with this proje cts.* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low and include location information.* 20191006 3 Mooresville Regional Office - (704) 663-1699 Donna Hood Pre-Filing Me eting Reque st submitte d 3/14/2021 Michael Turchy maturchy@ncdot.gov I-3819 B NCDOT Iredell City Raleigh State / Province / Region NC Postal / Zip Code 27699 Country US Street Address 1598 Mail Service Center Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No 20191006v2 No Meeting Requested This is a future/anticipated modification request. No meeting is requested. Please give a couple of dates you are available for a meeting. Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 3/14/2021 ROY COOPER Governor ELIZABETH S. BISER Secretary NORTH CAROLINA Environmental Quality October 15, 2021 Mr. Philip S. Harris, III, P.E., CPM Environmental Analysis Unit North Carolina Department of Transportation 1598 Mail Service Center Raleigh, North Carolina 27699-1598 Dear Mr. Harris: Subject: DMS Mitigation Acceptance Letter: I-3819B, Statesville – I-40 / I-77 Interchange – I-40 from SR 2003 (Indian Ridge Road) to SR 2158 (Old Mocksville Road) and I-77 from SR 2171 (Jane Sowers Road) to SR 2321 (East Broad Street), Iredell County References: USACE 404 Individual Permit issued January 21, 2020 and Individual Permit Modification issued February 25, 2021 (USACE Action ID 2018-01504) NCDWR 401 Water Quality Certification issued November 19, 2019 (NCDWR ID 2019-1006) The purpose of this letter is to notify you that the Division of Mitigation Services (DMS) will provide the additional riparian wetland mitigation for the subject project. Based on the information supplied by you on October 14, 2021, the impacts are located in CU 03040102 of the Yadkin River basin in the Central Piedmont (CP) and Central Piedmont (CP) Eco-Regions, and are as follows: Table 1 – Additional Impacts (feet / acres) Yadkin 03040102 CP Stream Wetlands Buffer (Sq. Ft.) Cold Cool Warm Riparian Non- Riparian Coastal Marsh Zone 1 Zone 2 Impacts (feet/acres) 0 0 0 0.010 0 0 0 0 *NOTE: Some of the impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. This additional impact and associated mitigation needs were not projected by the NCDOT in the 2021 impact data. DMS is currently providing stream and riparian wetland mitigation for the impacts associated with this project located in cataloging unit 03040102 of the Yadkin River basin as required by the 404 and 401 permits issued in 2019, 2020, and 2021 as shown in the below table (in mitigation credits): Mr. Harris TIP I-3819B October 15, 2021 Page Two Table 2 – Current Permitted Impacts and Associated Mitigation Requirements provided by DMS (based on issued permits) and Revised Anticipated Impacts (based on mitigation request) Impact Type Total Permitted Impacts (feet / acre / sq ft) Mitigation Provided by DMS per Issued Permits (Credits) Additional Impact (for approval) Revised Total Impacts* Stream (warm) 2,166.000 4,332.000 0.000 2,166.000 Riparian Wetland 1.550 3.100 0.010 1.560 *Some of the additional impacts may be proposed to be mitigated at a 1:1 mitigation ratio. See permit application for details. DMS will provide the amount of mitigation as determined by the regulatory agencies. This mitigation acceptance letter replaces the mitigation acceptance letter issued on May 20, 2018, July 12, 2019, and November 23, 2020. DMS commits to implementing additional riparian wetland mitigation credits to offset the impacts associated with this project as determined by the regulatory agencies using the delivery timeline listed in Section F.3.c.iii of the In-Lieu Fee Instrument dated July 28, 2010. If the above referenced impact amounts are revised, then this mitigation acceptance letter will no longer be valid and a new mitigation acceptance letter will be required from DMS. If you have any questions or need additional information, please contact Ms. Beth Harmon at 919- 707-8420. Sincerely, James B. Stanfill DMS Asset Management Supervisor cc: Mr. Monte Matthews, USACE – Raleigh Regulatory Field Office Ms. Amy Chapman, Division of Water Resources, Wetlands/401 Unit File: I-3819B Additional 2 77$ (90 115( 40$ Vanced 77$ STATESVILLE (115 90( $40 Al e xander Norfolk Sout her n Cor p. $77 Norfolk Corp.Southern Rail r oadAle xa n d er R ailroa d 72" CMP PARKINGDISTURBDO NOT PARKINGDISTURBDO NOT PROP CHL FENCE 216+99.3 -L-TIE TO EXIST. FENCE PROP CHL FENCE STREAM S B STREAM S X STREAM SP STREAM SBB STREAM S S IREDELL COUNTY I-40/I-77 INTERCHANGE INCLUDING I-40 FROM WEST OF GRADING, DRAINAGE, PAVING, STRUCTURES, DHV D T V = = = = = =MPH ADT ADT 2018 2040 * TTST 13 DUAL 3 60 = = = 34192.1.2 P.E. IMS-40-2(124) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA P.E. SIGNATURE: SIGNATURE: P.E. P.E. PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN LOCATION: TYPE OF WORK:09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 9/30/2021c:\projectwise\pb\projectwiseint\wsp__victoria.kohlwey\d0339329\I3819_hyd_prm_TSH.dgnUSVK677148STATE HIGHWAY DESIGN ENGINEERDEPARTMEN T O F TRA N SPORTATIONSTATEOFNORT H CAR O LI NA5 6 7 8 9 23 22 24 25 26 12 13 14 15 16 17 18 19 20 2130 3128 29 + RETAINING WALLS, NOISE WALLS, AND TRAFFIC CONTROL Prepared in the Office of:TO HI CKORYTO WI NSTON-SALEM-Y- -L--Y- -L- I-40 I-77 I-40 I-77 RADIO RD. -Y1- SR 2003 US 21-Y4-DAV IE AVE .-Y10- US 64 E . B R O A D S T .-Y 9- S R 2321OLD MOCKSVILLE RD. -Y15- SR 2158 -Y5- -LCDWB- -Y3A-US 64TO MOORESVILLE TO ELKIN VICINITY MAP PROJECT: 34192.1.2WITH ACCESS BEING LIMITED TO INTERCHANGES THIS IS A CONTROLLED ACCESS PROJECT 4 27 MPH60 I-40 I-77 CLASSIFICATION: INTERSTATE DUAL 3 +** TTST 16 (I-40) (I-77) 32 WSP NC LIC NO. F-0165 1001 Morehead Square Dr., Suite 610, Charlotte, NC 28203 ERIC W. SECKINGER, P.E. SR 2321 (EAST BROAD ST.) TO SOUTH OF SR 2171 (JANE SOWERS RD.) SR 2003 (RADIO RD.) TO SR 2158 (OLD MOCKSVILLE RD.) & I-77 FROM SOUTH OF JANE SO WER RD.SR 2171 JAMES FARM RD. SR 2173 CRAWFORD RDOLD MOCKSVILLE RD. SR 2158 E BRO A D ST.SR 2321SULLIVAN RD. MO CK SV ILLE RD M USEUM RD.SR 1965 S CHIPLEY FOR RD. SR 1907 WILKESBORO HWYSALISBURY RD.ISLAND FORD RD.SR 1006 TOTAL LENGTH OF TIP PROJECT I-3819B LENGTH STRUCTURES TIP PROJECT I-3819B LENGTH ROADWAY TIP PROJECT I-3819B 57,300 72,500 5,800 55 16 % % * 62,900 77,500 6,200 55 19 % % ** BEGIN TIP PROJECT I-3819B -L- STA. 7+83.00 INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION OCTOBER 30, 2018 OCTOBER 30, 2018 4.009 0.124 3.885TIP PROJECT:I-3819B/U-603934192.3.2 N/A DESIGN BUILD -L- STA. 219+50.00 END TIP PROJECT I-3819B CHRISTOPHER D. DAVIS,P.E. 10 11 -L- STA. 178+50 BEGIN SEGMENT "B" END SEGMENT "A" -Y_N- STA. 175+00 BEGIN SEGMENT "B" END SEGMENT "A" -L- STA. 92+00 END SEGMENT "B" BEGIN SEGMENT "A" TO THE LIMITS ESTABLISHED BY METHOD III. CLEARING ON THIS PROJECT SHALL BE PERFORMED 2018 STANDARD SPECIFICATIONS AND THE TOWNSHIP OF BETHANY BOUNDARIES OF THE CITY OF STATESVILLE THIS PROJECT IS WITHIN THE MUNICIPAL 9 A -Y_S- STA. 111+00 END SEGMENT "B" BEGIN SEGMENT "A" -Y_S- STA. 25+00.09 BEGIN SEGMENT "B" WETLAND AND SURFACE WATER IMPACT PERMITS 0 PLANS OVERSIZED PLANS 0 200 400 100 200 100 25 SEE ABOVE INSETS SCALE VARIES I-3819B/U-6039 50 50 are modified in this submittal.) (Note: The sites highlighted in RED DATE: October 4, 2021 SITE #2 SITE #3 SITE #4 SITE #9 SITE #10 SITE #11 SITE #7 SITE #8 SITE #12 SITE #6 SITE #5 SITE #9 SITE #13 NO IMPACTS U-6039 SITE #14 SITE #15 SITE #16 SITE #19 SITE #22 SITE #18 SITE #17 SITE #20 SITE #21 SITE #25 SITE #23 SITE #26 SITE #24 SITE #27 SITE #28 -YRPD- -YRPAC- -YRPA- -YRPBD- -YRPCA- -YRPB- -YRPC- -YLPC- -LCDEB- SITE #9A SITE #7A END CONSTRUCTION NAD 83 NC GRID DI DI MTL MTL M T L MTL MTL MTL MTL CONC 16 •'60" CONC60" CONCS1SFBUS S 54" CONC 54" CONC 96" CHLSRIPRAPRIPRAPRIPRAP72" RCPRIP RAPMTL MTL MTL MTL MTL RI PRAP134.94'DUKE ENERGY -- 68' R/WOF TRANSPORTATION NORTH CAROLINA DEPARTMENT 173.39'126.61'400.00' EXISTING R/W EXCEL REALTY TRUST -- NC EXCEL REALTY TRUST -- NC CENTRO NP HOLDINGS 1 SPE, LLC 190.04' K & W RESTAURANTS, INC EX IST ING R/W 68.00';; I I c n | }aaEOIEOIM TL3S CABLE 24" CMPJB 30" RCP 24" RCP36" CMP42" CMP 18" RCP 15" CMP42" RCP DI W/FESS 8"VCP 8"VCP 8"V C P 8"VCP30"VCP DIU/C U/C RIPRAP RIPRAP WOOD WALL WALLWOOD1SMTLBUS DI CONC 72" CONC RUINS RIPRAP CONC WALL CONC WALL CONC WALL CONC WALL CONC WALL MTL MTL RIPRAP RIPRAP RIPRAP HEIP EIP EIP80.30'137.71'EIP MOORESVILLE LODGING, LLC 208.65' EIP-R/W; ; ; AERIAL UTILITY EASEMENT DB 2126 PG 1446 DB 2231 PG 2180 E ASE ME NT 15' AC CESS IHbb b EOIEOI EOI p 18" RCP54" RCP54" RCPDI8"VCP8"VCP 8"VCP6"DI EIP-R/W 66.06' WALL WOODWALLWOODEASEMENTPERMANENT UTILITY SN 09°48'43" W217.11'28' BSTBST CONCCONCCONC CONC18" C&G18" C&G18" C&G 18" C&G 18" C&G 18" CURB18" CURB12" GUTTER18" C&GCONC BST BST BST BST BST BST BST18" C&G18" C&GGRGR CONC CONCBST BSTBST CONC BST I-40 EB RAMP 23' CONC I-40 EB RAMP 23' CONC30" C&G 30" C&G 3 0" C&G30" C&G 45' BST 28' BST SR 2187 GLENWAY DR 32' BST 29' BST SR 2187 GLENWAY DR 32.5' BST I-40 EB RA MP BST VARIES I-40 WB 64.5' CONC I-40 RAMP BST VAR IES CONC CONC BST BST 15" RCP RCP24" 24" RCP24" RCPRCP24" 15" RCP42" CMP36" RCP72" RCP42" RCP JUNC APPROX 24" RCP 15" RCP18" RCP 24" RCP15" RCP 12" CMP 15" RCP 15" RCP 24" RCP24" RCP24" RCP15" RCP15" CMP 18" RCP 18" RCP15" CMP15" RCP 24" RCP54" RCP 15" RCP15" R C P30" RCPDI DI 30" DIP15" DIPDI DI24" RCP HDPE24" SDMH DI DI POSS JBPOSS JB HW 5' CONC 54" RCP54" RCPPOSS JB LT LT LT LT LT LT LT LT 48" CMP S PI Sta 67+43.78 D L = 785.69' T = 392.91' R = 17,072.00' PI Sta 75+26.15 D L = 779.06' T = 389.60' R = 16,928.00' -YRPAC- -YRPCA- -YRPC--YRPAC--LCDEB- -LCDWB- PI Sta 113+91.69 D L = 782.37' T = 391.26' R = 17,000.00' -L- PI Sta 121+74.06 D L = 782.37' T = 391.26' R = 17,000.00' SE = NC SE = NC SE = NC SE = NC DS = 50 MPHDS = 50 MPHDS = 60 MPHDS = 60 MPH SE = NC DS = 60 MPH SE = NC DS = 60 MPH SE = 06 DS = 50 MPH SE = 06 DS = 50 MPH SE = 06 DS = 50 MPH SE = 06 DS = 60 MPH DS = 60 MPH PIs Sta 11+98.97 F Ls = 160.00' LT = 107.09' ST = 53.72' PIs Sta 24+80.77 F Ls = 160.00' LT = 107.09' ST = 53.72' -YRPCA- -YRPC- -YRPDB- -YLPC-20+00PI Sta 18+44.08 D L = 1,175.17' T = 592.21' R = 290.00' -YLPC- -YRPB- PIs Sta 58+35.20 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 58+74.99 D L = 1,692.58' T = 1,344.00' R = 833.00' 55+00 60+0065+00PI Sta 25+49.52 D L = 786.96' T = 409.59' R = 1,150.00' PIs Sta 29+74.91 F Ls = 144.00' LT = 96.02' ST = 48.02' 15+00 20+00 25+0030+00 PIs Sta 31+66.93 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 12+64.33 D L = 511.92' T = 264.33' R = 833.00' PIs Sta 15+59.95 F Ls = 144.00' LT = 96.04' ST = 48.03' 30+00 35+00 PIs Sta 246+30.11 F Ls = 240.00' LT = 160.02' ST = 80.02' PI Sta 247+61.90 D L = 103.60' T = 51.81' R = 2,330.00' -YRPB- SE = .06 -Y_RT- SE = 05 DS = 60 MPH PI Sta 235+92.32 D L = 525.34' T = 263.34' R = 3,000.00' PIs Sta 239+20.99 F Ls = 200.00' LT = 133.34' ST = 66.67' PIs Sta 30+68.10 F Ls = 220.00' LT = 146.74' ST = 73.40' PI Sta 34+24.03 D L = 553.98' T = 282.68' R = 1,130.00' PIs Sta 37+66.24 F F Ls = 200.00' LT = 129.22' ST = 70.90' DS = 50 MPH SE = EXIST. (0.06) PIs Sta 337+98.63 F Ls = 270.00' LT = 180.02' ST = 90.02' PIs Sta 344+90.12 F Ls = 240.00' LT = 160.02' ST = 80.02' PI Sta 346+17.10 D L = 94.00' T = 47.00' R = 2,320.00' PIs Sta 347+44.11 F Ls = 240.00' LT = 160.02' ST = 80.02' SE = 05 DS = 60 MPH PI Sta 334+86.61 D L = 444.82' T = 222.82' R = 3,000.00' 15+00 -Y_LT- DS = 50 MPH SE = 06 PI Sta 558+84.78 D L = 2,643.26' T = 52,740.87' R = 833.00' PI Sta 81+25.21 D L = 731.59' T = 366.04' R = 8,160.00' PI Sta 72+80.46 D L = 779.06' T = 389.60' R = 16,928.00' SE = .08 DS = 30 MPH --LCDEB --LCDEB --L 75+00 125+00 120+00 115+00 70+00 110+00 60+00 -LCDWB- 65+00 70+00 75+00 80+00 85+00 60+00 12'12' 12'12'12'12'12'12'12'PS12'PS10'12'12'PS11'PS11'4'12'12'12'PS11.7'PROP. GUARDRAIL PROP. GUARDRAIL C AT-1 SAWCUT SAWCUT 50 :1 25:1 PS11.7' PROP. SBG W/ G.R.8:1PS14' SBG W / G.R. 50 :1 12'PS 12'12'12'12'PS11.7'B-77 B-77 B-77 B-77 +04.9B-77B-77PS11.7'PS9' SBG W/ G.R.W/ G.R.EXP. GUTTER 50:1 +33.5 50:1PS 2 4 'SFB (25:1) (25:1) SF B +60 +70.89BEG. SBG + 5 0 +50CONC. DITCH PAV'T12'4' B-77 8:1 w/ GLARE SCREEN PROP. GUARDRAIL SAWCUT +77.7-YRPB- 28+92.04 WALL #13 END RET. 77:1 PS 9.7'PS 12'18'PS TL-3IA MASH +12.1 BEG. EXP. G UTTER EN D SFB W/ C AP RESTRIPING ONLY 300' LANE DROP TAPER (LT) GROUNDWATER FOR 1.5:1 SLOPE SOIL SLOPE (RSS) w/ HIGH STANDARD REINFORCED12'12'12'PS12'PS10'12'12'12'12'36'12'12'12'PS12'PS10'12'12'PS11'PS11'4'12'PS11.7'8:1 SAWCUT EXIST. TO REMAIN 12'B-77 B-77 SBG W/ G.R. SAWCUT CAT-1 PS12'16'12'PS10'PS12'12'12'PS10'12'12'PS10'12'12'CONC. MED. BAR.PS12'12'12'12'PS12'PS11'12'12'12'PS11'12'12'12'12'4'PROP. SBG W/ G.R.12'PS12'PS12'PS11.7'PS12'PS11.7'4'(TYP )25 :1 TL-3 IA MASH PS12.6'02020100 060403020506 040302010206 04 03 02 01 00 01 02(TYP)24'050605 06 0203 05040302 06 (TYP)24'(TYP)24'(TYP) 36'02EX..02EXIST.0202020210 R E T AI N RETAIN RETAIN RETAIN RETAIN RETAIN 24" RCP III RETAIN RETAIN RETAINRETAINRETAINRETAINRETAINRETAIN5 TONS 14 SY CL B RIP RAP 2 TON 7 SY CLASS B RIP RAP REMOVE2 TON 7 SY CL B RIP RAP 1 TON 5 SY CL B RIP RAP REMOVE REMOVEREMOVE JB SEE DETAIL 1 W/ BERM & PSRM LATERAL 5' BASE DITCH 2GI 2GI 2GI 2GI 2GI24" RCP-III2GI 2GI 2GI 2GI 2GI 2GI 15" CSP2GI 2GI JB w/MH 2GI 2GI 2GI 2GI JB w/MH 2GI 2GI 2GI 2GI CB15" RCP-III FS 2GI 2GI 2GI 2GI 2GI 2GI RETAIN 2GI GRADE TO DRAIN REM O V E JB w/MH CONV. DI TO IN TYPICAL DITCH CLASS B RIPRAP 2GI REMOVE REMOVE ADJUST 2GI SPECIAL 2GI ADJUST SPECIAL 2GI ADJUST SPECIAL 2GI ADJUST REMOVE REMOVE JB w/MH SEE DETAIL 25 W/ CLASS 1 RIPRAP TOE PROTECTION 1 CB CB FILL FLOWABLE 15" RCP-III GTD GTD GTD 2GI-A SEE DETAIL 31 WITH CLASS B RIPRAP TOE PROTECTION SEE DETAIL 23 'V' DITCH SPECIAL LATERAL 18" RCP-III15" RCP-IV1 5 " RCP-IV 2GI-D 18" RCP-III V10= 1.6 fps Q10= 83.2 cfs SEE DETAIL 32 CL 1 RIP RAP DISSIPATOR BASIN #1 RIP RAP ENERGY SEE DETAIL 27 PSH 24" RCP-IV 2GI JB w/MH 54" RCP-IV15" RCP-III REMOVE SEE DETAIL 31 w/ CLASS B RIPRAP TOE PROTECTION 3 TON 11 SY CL B RIP RAP 2GI-D 2GI-D 15" RCP-IV 15" CSP W/ ELBOWSW/ ELBOWS 24" RCP-IV SEE DETAIL 31 WITH CLASS B RIPRAP TOE PROTECTION 2 TONS 7 SY CL B RIP RAP SEE DETAIL 31 WITH CLASS B RIPRAP TOE PROTECTION 2GI 2GI FS 15" RCP-IV 15" RCP-IV 27 TONS CL I RIP RAP SEE DETAIL 4 STABILIZATION PIPE OUTLET CHANNEL RCP-III 15" 42" RCP-III 42" RCP-III 42" RCP-III15" RCP-III 2GI 2GI-D 15" RCP-III 24" RCP-III JB w/MH 30" RCP-IV REMOVE 2GI-A 2GI-A 2GI-A 42" RCP-IIIJB w/MH SHEET 2D-4 SEE DETAIL ON STRUCTURE DETENTION OUTLETREMOVEREMOVE JB w/MH GTD RETAIN JB w/MH JB w/MH SEE DETAIL 6 'V' DITCH STANDARD TAIL RETAIN RETAIN RETAIN RETAIN SEE DETAIL 74 W/ CLASS B RIPRAP SPECIAL LATERAL 'V' DITCH 15" RCP-IV 24" RCP-III15" RCP-IV 15" RCP-IV 5 TONS 14 SY CL B RIP RAP REMOVE 15" RCP-IV REMOVE 15" R C P-III SEE DETAIL 22 W/ CLASS B RIPRAP SPECIAL LATERAL 'V' DITCH 30" RCP-IIICOLLAR SEE SPECIAL DETAIL HW CB 15" RCP-IV 15" RCP-IV REMOVE JB w/MH 15" RCP-IV 15" RCP-I V2GI 2GI 2 TON 7 SY CLASS B RIP RAP RETAIN FES24" RCP-IIIRETAIN & LINESEE DETAIL 84 BANK STABILIZATION CLASS II RIP RAP TS S S WC WD WF SI WG SJ WE WD * *** * ** ** ****WD******** *** ********* * SITE #2SITE #2 SITE #3 10/6/2021c:\projectwise\pb\projectwiseint\wsp__victoria.kohlwey\d0339329\I3819_hyd_prm_psh10_L10650-13550.dgnUSVK677148LOCATION: DESIGNED BY: CHECKED BY: COUNTY:TIP NO.: DATE: HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/2/99IREDELL I-3819B DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I-3819B C. DAVIS D. AINSWORTH 4-2-2019 NC LIC NO. F-0165 Suite 610, Charlotte, NC 28203 1001 Morehead Square Dr., (Variable) Channel Bed 10 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED** * * *** ** * * S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED** * * *** ** * * S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SI WF - YRPC- T T FILL IN WETLAND DENOTES TEMPORARY ( Not to Scale) See plan 1.0'min. DETAIL 84 RIP RAP BANK STABILIZATION d* Type of Liner= CL 1 or CL 2 Rip Rap (see plan) -YRPCA- STA. 77+00 RT -YRPCA- STA. 18+65 RT *d=18" for CL 1 and 30" for CL 2 (No Geotextile) Grade Ex. or Pr. ( Not to Scale) Ground Natural Ground Natural PIPE OUTLET CHANNEL STABILIZATION DETAIL 4 Length= 22 Ft. 1.5' -Y_N- STA. 210+35 RT -YRPC- STA. 16+04 RT Elevation Natural Bed Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotextile) SJWC SEE SHEET 10A SEE SHEET 10A 25 5012.5 025 SITE #3 INSET WATER IMPACT TEMPORARY SURFACE GRAPHIC SCALE - INSET SEE INSET SITE #3 SJ SEE DETAIL 4 W/ CLASS 1 RIPRAP STABILIZATION PIPE OUTLET CHANNEL C F F F F F F FF F F F F F FFFFFFFFFCFCF C CCCCCCCFF F F F F F FFFF C C F F F F F F F F F F F F F FFF F F F F F F F F F F C C C C F F F F C F F F F FC C C C C C C F F C CC 18" RCP-III 24" RCP-III 15" RCP-III 15" RCP-III 15" RCP-IV 15" RCP-IV W/ ELBOWS 30" CSP 24" RCP-III 15" RCP-IV 15" RCP-IV 15" RCP-IV 24" RCP-III 24" RCP-III 24" RCP-III 15" RCP-IV 54" WELDED STEEL INSTALLATION TRENCHLESS 15" RCP-III RCP-III 30" 15" RCP-IV 15" RCP-IV RCP-IV 15" w/ ELBOWS 15" CSP w/ ELBOWS 15" CSP MTLRIPRAP RI PRAPRI PRAP24" CMPI-40 EB RA MP BST VARIES 54" RCP-YRPC-65+0015+00 PROP. SBG W/ G.R.12'12'12'PS11.7'PS 2 4 'SFB (25:1) (25:1) SF B18'PS TL-3IA MASH GROUNDWATER FOR 1.5:1 SLOPE SOIL SLOPE (RSS) w/ HIGH STANDARD REINFORCED 03 02 01 00(TYP)24' 05040302 06(TYP)24'REMOVEREMOVE JB15" CSP2GI 2GI 2GI SEE DETAIL 27 PSH 24" RCP-IV54" RCP-IVW/ ELBOWS 24" RCP-IV JB w/MH TS S S -MATCHLINE- STA. 135+50.00 -L- SEE SHEET NO. 11SEE SHEET NO. 22 STA. 19+00.00 -YRPC- STA. 31+50.00 -YRPCA- -MATCHLINE- SEE SHEET NO . 23 -MATCHLINE- STA . 247+00 -Y_RT-NAD 83/95NC GRIDSEE SHEET NO. 22 STA. 66+90.00 -YRPAC--MATCHLINE- SEE SHEET W-1 FOR WALL 13 ENVELOPE SEE SHEET 2D-1 DRAINAGE DETAILS SEE SHEET 73 FOR -YLPC- PROFILE SEE SHEET 72 FOR -YRPDB- PROFILE SEE SHEET 66 FOR -YRPCA- PROFILE SEE SHEET 65 FOR -YRPC- PROFILE SEE SHEET 63 FOR -YRPAC- PROFILE SEE SHEET 56, 57 FOR -Y_RT- PROFILE SEE SHEET 56, 57 FOR -Y_LT- PROFILE SEE SHEET 47, 48 FOR -LCDEB- PROFILE SEE SHEET 39 FOR -L_EB- PROFILE SEE SHEET 39 FOR -L_WB- PROFILE SEE SHEET 37, 38 FOR -L_RT- PROFILE SEE SHEET 37, 38 FOR -L_LT- PROFILE-MATCHLINE- STA. 106+50.00 -L- SEE SHEET NO. 9AAA W PLAN VIEW SECTION A-A (4'min typ.) Permanent Soil Reinforcement matting (PSRM) Seed with native grasses at installation. *NOT TO SCALE BFILL S LOPE2:12:1INFLOW 3/08 not shown for clarity) (Rip Rap in basin GROUND NATURAL Outlet Pipe or Ditch Scour Hole (PSH) Square Preformed D PSRM MIN. 1' TUCK WITH NATURAL GROUND INSTALL LEVEL AND FLUSH WITH GEOTEXTILE LINER: CLASS B RIPRAP DETAIL 27 - PREFORMED SCOUR HOLE PIPE (d = 15") W= 4' D= 1' B= 3.75' -Y11- STA. 30+74 LT -YRPDB- STA. 18+52 RT -YRPDB- STA. 16+85 RT -YRPCA- STA. 80+36 RT -YRPC- STA. 15+09 RT -YRPA- STA. 13+01 RT -Y_S- STA. 120+82 LT AA W PLAN VIEW SECTION A-A (4'min typ.) Permanent Soil Reinforcement matting (PSRM) Seed with native grasses at installation. *NOT TO SCALE B FI LL S LOP E2:12:1INFLOW 3/08 not shown for clarity) (Rip Rap in basin GROUND NATURAL Outlet Pipe or Ditch Scour Hole (PSH) Square Preformed D PSRM MIN. 1' TUCK WITH NATURAL GROUND INSTALL LEVEL AND FLUSH WITH GEOTEXTILE LINER: CLASS B RIPRAP DETAIL 28 - PREFORMED SCOUR HOLE PIPE (d = 18") W= 4' D= 1.5' B= 4.5' -YRPC- STA. 22+09 RT -YRPDB- STA. 15+69 RT F F F F F F 15" RCP-IV 7 75775 775 775 775 7757757757757 75 775 775 780 780780780 780 780780780 780780780780780780780 780 780 780 780 780780780780780 780780 780780780780780780780780780780780 780 780780780 780 780 780780 780780780 780 780780780 780780780780 780780 780780780780 780780780 7857857 85785 785785785 785 785785785785785785785785 7 85 785785785 785785785785785785 785785 790790790790790790790790 790 790790790790790790790 790 790790790 790790790 790 790 790790 790 790 79079079079079079079 0 790 795 795 795 795 795795 795 795 795795795795795 795 795 79579579 5795 795 795795 795 795 79 5 795 795 795795 795 795 795795795 795795 795 795 800 800 800 800 800800 800 800800 800 800 800 800800800 800 80080 0 800 80080 0800 800 800 800 800800800800805805805805805805805 805 805 805805 805 805 805 805805805 805805805805 8 0 5 805805 805 805 80 5 805805 805 80 5 805805810810 810 810810810 810 810810 810810 810 810810 810 810 810810 810 810 810 810810 810 810810810 810810810 810 810 810 8108108108108 10 810 810 810 810 810 810 810810 810810810810815 815 815815815 815 815 815 815 815 815 815 815 815815815815815815 815 815 815815 815815815815815 815 815 815815815815 815815 815 815 815815815815815 815 815 815 815815 815815815820 8208 20 820 820 820 820 820 820 820 820 820 820820820 820820820820 8 20 820820820 820 820 820 8208208 20 8 2 0820820820820820820 820 825825 825 825 825 825 825 825 825 825 825 825825825 825825 825825825 825825825825 825 8 2 5 8258 25825830830830 830 830 830 830 8 3 0 830830 830 830 830830830 8 3 0830 830 830 830830830830 830 83083083 0 830830 835835 835 835835835 835 835835835835835835840840 840 840840840840840 8 4 5845 845 845 DI DI MTL MTL M T L MTL MTL MTL MTL CONC 16 •'60" CONC60" CONCS1SFBUS S 54" CONC 54" CONC 96" CHLSRIPRAPRIPRAPRIPRAP72" RCPRIP RAPMTL MTL MTL MTL MTL RI PRAP134.94'DUKE ENERGY -- 68' R/WOF TRANSPORTATION NORTH CAROLINA DEPARTMENT 173.39'126.61'400.00' EXISTING R/W EXCEL REALTY TRUST -- NC EXCEL REALTY TRUST -- NC CENTRO NP HOLDINGS 1 SPE, LLC 190.04' K & W RESTAURANTS, INC EX IST ING R/W 68.00';; I I c n | }aaEOIEOIM TL3S CABLE 24" CMPJB 30" RCP 24" RCP36" CMP42" CMP 18" RCP 15" CMP42" RCP DI W/FESS 8"VCP 8"VCP 8"V C P 8"VCP30"VCP DIU/C U/C RIPRAP RIPRAP WOOD WALL WALLWOOD1SMTLBUS DI CONC 72" CONC RUINS RIPRAP CONC WALL CONC WALL CONC WALL CONC WALL CONC WALL MTL MTL RIPRAP RIPRAP RIPRAP HEIP EIP EIP80.30'137.71'EIP MOORESVILLE LODGING, LLC 208.65' EIP-R/W; ; ; AERIAL UTILITY EASEMENT DB 2126 PG 1446 DB 2231 PG 2180 E ASE ME NT 15' AC CESS IHbb b EOIEOI EOI p 18" RCP54" RCP54" RCPDI8"VCP8"VCP 8"VCP6"DI EIP-R/W 66.06' WALL WOODWALLWOODEASEMENTPERMANENT UTILITY SN 09°48'43" W217.11'28' BSTBST CONCCONCCONC CONC18" C&G18" C&G18" C&G 18" C&G 18" C&G 18" CURB18" CURB12" GUTTER18" C&GCONC BST BST BST BST BST BST BST18" C&G18" C&GGRGR CONC CONCBST BSTBST CONC BST I-40 EB RAMP 23' CONC I-40 EB RAMP 23' CONC30" C&G 30" C&G 3 0" C&G30" C&G 45' BST 28' BST SR 2187 GLENWAY DR 32' BST 29' BST SR 2187 GLENWAY DR 32.5' BST I-40 EB RA MP BST VARIES I-40 WB 64.5' CONC I-40 RAMP BST VAR IES CONC CONC BST BST 15" RCP RCP24" 24" RCP24" RCPRCP24" 15" RCP42" CMP36" RCP72" RCP42" RCP JUNC APPROX 24" RCP 15" RCP18" RCP 24" RCP15" RCP 12" CMP 15" RCP 15" RCP 24" RCP24" RCP24" RCP15" RCP15" CMP 18" RCP 18" RCP15" CMP15" RCP 24" RCP54" RCP 15" RCP15" R C P30" RCPDI DI 30" DIP15" DIPDI DI24" RCP HDPE24" SDMH DI DI POSS JBPOSS JB HW 5' CONC 54" RCP54" RCPPOSS JB LT LT LT LT LT LT LT LT 48" CMP S PI Sta 67+43.78 D L = 785.69' T = 392.91' R = 17,072.00' PI Sta 75+26.15 D L = 779.06' T = 389.60' R = 16,928.00' -YRPAC- -YRPCA- -YRPC--YRPAC--LCDEB- -LCDWB- PI Sta 113+91.69 D L = 782.37' T = 391.26' R = 17,000.00' -L- PI Sta 121+74.06 D L = 782.37' T = 391.26' R = 17,000.00' SE = NC SE = NC SE = NC SE = NC DS = 50 MPHDS = 50 MPHDS = 60 MPHDS = 60 MPH SE = NC DS = 60 MPH SE = NC DS = 60 MPH SE = 06 DS = 50 MPH SE = 06 DS = 50 MPH SE = 06 DS = 50 MPH SE = 06 DS = 60 MPH DS = 60 MPH PIs Sta 11+98.97 F Ls = 160.00' LT = 107.09' ST = 53.72' PIs Sta 24+80.77 F Ls = 160.00' LT = 107.09' ST = 53.72' -YRPCA- -YRPC- -YRPDB- -YLPC-20+00PI Sta 18+44.08 D L = 1,175.17' T = 592.21' R = 290.00' -YLPC- -YRPB- PIs Sta 58+35.20 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 58+74.99 D L = 1,692.58' T = 1,344.00' R = 833.00' 55+00 60+0065+00PI Sta 25+49.52 D L = 786.96' T = 409.59' R = 1,150.00' PIs Sta 29+74.91 F Ls = 144.00' LT = 96.02' ST = 48.02' 15+00 20+00 25+0030+00 PIs Sta 31+66.93 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 12+64.33 D L = 511.92' T = 264.33' R = 833.00' PIs Sta 15+59.95 F Ls = 144.00' LT = 96.04' ST = 48.03' 30+00 35+00 PIs Sta 246+30.11 F Ls = 240.00' LT = 160.02' ST = 80.02' PI Sta 247+61.90 D L = 103.60' T = 51.81' R = 2,330.00' -YRPB- SE = .06 -Y_RT- SE = 05 DS = 60 MPH PI Sta 235+92.32 D L = 525.34' T = 263.34' R = 3,000.00' PIs Sta 239+20.99 F Ls = 200.00' LT = 133.34' ST = 66.67' PIs Sta 30+68.10 F Ls = 220.00' LT = 146.74' ST = 73.40' PI Sta 34+24.03 D L = 553.98' T = 282.68' R = 1,130.00' PIs Sta 37+66.24 F F Ls = 200.00' LT = 129.22' ST = 70.90' DS = 50 MPH SE = EXIST. (0.06) PIs Sta 337+98.63 F Ls = 270.00' LT = 180.02' ST = 90.02' PIs Sta 344+90.12 F Ls = 240.00' LT = 160.02' ST = 80.02' PI Sta 346+17.10 D L = 94.00' T = 47.00' R = 2,320.00' PIs Sta 347+44.11 F Ls = 240.00' LT = 160.02' ST = 80.02' SE = 05 DS = 60 MPH PI Sta 334+86.61 D L = 444.82' T = 222.82' R = 3,000.00' 15+00 -Y_LT- DS = 50 MPH SE = 06 PI Sta 558+84.78 D L = 2,643.26' T = 52,740.87' R = 833.00' PI Sta 81+25.21 D L = 731.59' T = 366.04' R = 8,160.00' PI Sta 72+80.46 D L = 779.06' T = 389.60' R = 16,928.00' SE = .08 DS = 30 MPH --LCDEB --LCDEB --L 75+00 125+00 120+00 115+00 70+00 110+00 60+00 -LCDWB- 65+00 70+00 75+00 80+00 85+00 60+00 12'12' 12'12'12'12'12'12'12'PS12'PS10'12'12'PS11'PS11'4'12'12'12'PS11.7'PROP. GUARDRAIL PROP. GUARDRAIL C AT-1 SAWCUT SAWCUT 50 :1 25:1 PS11.7' PROP. SBG W/ G.R.8:1PS14' SBG W / G.R. 50 :1 12'PS 12'12'12'12'PS11.7'B-77 B-77 B-77 B-77 +04.9B-77B-77PS11.7'PS9' SBG W/ G.R.W/ G.R.EXP. GUTTER 50:1 +33.5 50:1PS 2 4 'SFB (25:1) (25:1) SF B +60 +70.89BEG. SBG + 5 0 +50CONC. DITCH PAV'T12'4' B-77 8:1 w/ GLARE SCREEN PROP. GUARDRAIL SAWCUT +77.7-YRPB- 28+92.04 WALL #13 END RET. 77:1 PS 9.7'PS 12'18'PS TL-3IA MASH +12.1 BEG. EXP. G UTTER EN D SFB W/ C AP RESTRIPING ONLY 300' LANE DROP TAPER (LT) GROUNDWATER FOR 1.5:1 SLOPE SOIL SLOPE (RSS) w/ HIGH STANDARD REINFORCED12'12'12'PS12'PS10'12'12'12'12'36'12'12'12'PS12'PS10'12'12'PS11'PS11'4'12'PS11.7'8:1 SAWCUT EXIST. TO REMAIN 12'B-77 B-77 SBG W/ G.R. SAWCUT CAT-1 PS12'16'12'PS10'PS12'12'12'PS10'12'12'PS10'12'12'CONC. MED. BAR.PS12'12'12'12'PS12'PS11'12'12'12'PS11'12'12'12'12'4'PROP. SBG W/ G.R.12'PS12'PS12'PS11.7'PS12'PS11.7'4'(TYP )25 :1 TL-3 IA MASH PS12.6'02020100 060403020506 040302010206 04 03 02 01 00 01 02(TYP)24'050605 06 0203 05040302 06 (TYP)24'(TYP)24'(TYP) 36'02EX..02EXIST.0202020210 R E T AI N RETAIN RETAIN RETAIN RETAIN RETAIN 24" RCP III RETAIN RETAIN RETAINRETAINRETAINRETAINRETAINRETAIN5 TONS 14 SY CL B RIP RAP 2 TON 7 SY CLASS B RIP RAP REMOVE2 TON 7 SY CL B RIP RAP 1 TON 5 SY CL B RIP RAP REMOVE REMOVEREMOVE JB SEE DETAIL 1 W/ BERM & PSRM LATERAL 5' BASE DITCH 2GI 2GI 2GI 2GI 2GI24" RCP-III2GI 2GI 2GI 2GI 2GI 2GI 15" CSP2GI 2GI JB w/MH 2GI 2GI 2GI 2GI JB w/MH 2GI 2GI 2GI 2GI CB15" RCP-III FS 2GI 2GI 2GI 2GI 2GI 2GI RETAIN 2GI GRADE TO DRAIN REM O V E JB w/MH CONV. DI TO IN TYPICAL DITCH CLASS B RIPRAP 2GI REMOVE REMOVE ADJUST 2GI SPECIAL 2GI ADJUST SPECIAL 2GI ADJUST SPECIAL 2GI ADJUST REMOVE REMOVE JB w/MH SEE DETAIL 25 W/ CLASS 1 RIPRAP TOE PROTECTION 1 CB CB FILL FLOWABLE 15" RCP-III GTD GTD GTD 2GI-A SEE DETAIL 31 WITH CLASS B RIPRAP TOE PROTECTION SEE DETAIL 23 'V' DITCH SPECIAL LATERAL 18" RCP-III15" RCP-IV1 5 " RCP-IV 2GI-D 18" RCP-III V10= 1.6 fps Q10= 83.2 cfs SEE DETAIL 32 CL 1 RIP RAP DISSIPATOR BASIN #1 RIP RAP ENERGY SEE DETAIL 27 PSH 24" RCP-IV 2GI JB w/MH 54" RCP-IV15" RCP-III REMOVE SEE DETAIL 31 w/ CLASS B RIPRAP TOE PROTECTION 3 TON 11 SY CL B RIP RAP 2GI-D 2GI-D 15" RCP-IV 15" CSP W/ ELBOWSW/ ELBOWS 24" RCP-IV SEE DETAIL 31 WITH CLASS B RIPRAP TOE PROTECTION 2 TONS 7 SY CL B RIP RAP SEE DETAIL 31 WITH CLASS B RIPRAP TOE PROTECTION 2GI 2GI FS 15" RCP-IV 15" RCP-IV 27 TONS CL I RIP RAP SEE DETAIL 4 STABILIZATION PIPE OUTLET CHANNEL RCP-III 15" 42" RCP-III 42" RCP-III 42" RCP-III15" RCP-III 2GI 2GI-D 15" RCP-III 24" RCP-III JB w/MH 30" RCP-IV REMOVE 2GI-A 2GI-A 2GI-A 42" RCP-IIIJB w/MH SHEET 2D-4 SEE DETAIL ON STRUCTURE DETENTION OUTLETREMOVEREMOVE JB w/MH GTD RETAIN JB w/MH JB w/MH SEE DETAIL 6 'V' DITCH STANDARD TAIL RETAIN RETAIN RETAIN RETAIN SEE DETAIL 74 W/ CLASS B RIPRAP SPECIAL LATERAL 'V' DITCH 15" RCP-IV 24" RCP-III15" RCP-IV 15" RCP-IV 5 TONS 14 SY CL B RIP RAP REMOVE 15" RCP-IV REMOVE 15" R C P-III SEE DETAIL 22 W/ CLASS B RIPRAP SPECIAL LATERAL 'V' DITCH 30" RCP-IIICOLLAR SEE SPECIAL DETAIL HW CB 15" RCP-IV 15" RCP-IV REMOVE JB w/MH 15" RCP-IV 15" RCP-I V2GI 2GI 2 TON 7 SY CLASS B RIP RAP RETAIN FES24" RCP-IIIRETAIN & LINESEE DETAIL 84 BANK STABILIZATION CLASS II RIP RAP TS S S WC WD WF SI WG SJ WE WD * *** * ** ** ****WD******** *** ********* * SITE #2SITE #2 SITE #3 10/6/2021c:\projectwise\pb\projectwiseint\wsp__victoria.kohlwey\d0339329\I3819_hyd_prm_psh10_L10650-13550.dgnUSVK677148LOCATION: DESIGNED BY: CHECKED BY: COUNTY:TIP NO.: DATE: HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/2/99IREDELL I-3819B DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I-3819B C. DAVIS D. AINSWORTH 4-2-2019 NC LIC NO. F-0165 Suite 610, Charlotte, NC 28203 1001 Morehead Square Dr., (Variable) Channel Bed 10 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED** * * *** ** * * S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED** * * *** ** * * S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SI WF - YRPC- T T FILL IN WETLAND DENOTES TEMPORARY ( Not to Scale) See plan 1.0'min. DETAIL 84 RIP RAP BANK STABILIZATION d* Type of Liner= CL 1 or CL 2 Rip Rap (see plan) -YRPCA- STA. 77+00 RT -YRPCA- STA. 18+65 RT *d=18" for CL 1 and 30" for CL 2 (No Geotextile) Grade Ex. or Pr. ( Not to Scale) Ground Natural Ground Natural PIPE OUTLET CHANNEL STABILIZATION DETAIL 4 Length= 22 Ft. 1.5' -Y_N- STA. 210+35 RT -YRPC- STA. 16+04 RT Elevation Natural Bed Type of Liner= CL 1 Rip-Rap - Keyed-In (No Geotextile) SJWC SEE SHEET 10A SEE SHEET 10A 25 5012.5 025 SITE #3 INSET WATER IMPACT TEMPORARY SURFACE GRAPHIC SCALE - INSET SEE INSET SITE #3 SJ SEE DETAIL 4 W/ CLASS 1 RIPRAP STABILIZATION PIPE OUTLET CHANNEL C F F F F F F FF F F F F F FFFFFFFFFCFCF C CCCCCCCFF F F F F F FFFF C C F F F F F F F F F F F F F FFF F F F F F F F F F F C C C C F F F F C F F F F FC C C C C C C F F C CC 18" RCP-III 24" RCP-III 15" RCP-III 15" RCP-III 15" RCP-IV 15" RCP-IV W/ ELBOWS 30" CSP 24" RCP-III 15" RCP-IV 15" RCP-IV 15" RCP-IV 24" RCP-III 24" RCP-III 24" RCP-III 15" RCP-IV 54" WELDED STEEL INSTALLATION TRENCHLESS 15" RCP-III RCP-III 30" 15" RCP-IV 15" RCP-IV RCP-IV 15" w/ ELBOWS 15" CSP w/ ELBOWS 15" CSP 785785785 785 790790790790790 790 7 9 5 795795 795 80 0 8 0 5 810 815MTLRIPRAP RI PRAPRI PRAP24" CMPI-40 EB RA MP BST VARIES 54" RCP-YRPC-65+0015+00 PROP. SBG W/ G.R.12'12'12'PS11.7'PS 2 4 'SFB (25:1) (25:1) SF B18'PS TL-3IA MASH GROUNDWATER FOR 1.5:1 SLOPE SOIL SLOPE (RSS) w/ HIGH STANDARD REINFORCED 03 02 01 00(TYP)24' 05040302 06(TYP)24'REMOVEREMOVE JB15" CSP2GI 2GI 2GI SEE DETAIL 27 PSH 24" RCP-IV54" RCP-IVW/ ELBOWS 24" RCP-IV JB w/MH TS S S -MATCHLINE- STA. 135+50.00 -L- SEE SHEET NO. 11SEE SHEET NO. 22 STA. 19+00.00 -YRPC- STA. 31+50.00 -YRPCA- -MATCHLINE- SEE SHEET NO . 23 -MATCHLINE- STA . 247+00 -Y_RT-NAD 83/95NC GRIDSEE SHEET NO. 22 STA. 66+90.00 -YRPAC--MATCHLINE- SEE SHEET W-1 FOR WALL 13 ENVELOPE SEE SHEET 2D-1 DRAINAGE DETAILS SEE SHEET 73 FOR -YLPC- PROFILE SEE SHEET 72 FOR -YRPDB- PROFILE SEE SHEET 66 FOR -YRPCA- PROFILE SEE SHEET 65 FOR -YRPC- PROFILE SEE SHEET 63 FOR -YRPAC- PROFILE SEE SHEET 56, 57 FOR -Y_RT- PROFILE SEE SHEET 56, 57 FOR -Y_LT- PROFILE SEE SHEET 47, 48 FOR -LCDEB- PROFILE SEE SHEET 39 FOR -L_EB- PROFILE SEE SHEET 39 FOR -L_WB- PROFILE SEE SHEET 37, 38 FOR -L_RT- PROFILE SEE SHEET 37, 38 FOR -L_LT- PROFILE-MATCHLINE- STA. 106+50.00 -L- SEE SHEET NO. 9AAA W PLAN VIEW SECTION A-A (4'min typ.) Permanent Soil Reinforcement matting (PSRM) Seed with native grasses at installation. *NOT TO SCALE BFILL S LOPE2:12:1INFLOW 3/08 not shown for clarity) (Rip Rap in basin GROUND NATURAL Outlet Pipe or Ditch Scour Hole (PSH) Square Preformed D PSRM MIN. 1' TUCK WITH NATURAL GROUND INSTALL LEVEL AND FLUSH WITH GEOTEXTILE LINER: CLASS B RIPRAP DETAIL 27 - PREFORMED SCOUR HOLE PIPE (d = 15") W= 4' D= 1' B= 3.75' -Y11- STA. 30+74 LT -YRPDB- STA. 18+52 RT -YRPDB- STA. 16+85 RT -YRPCA- STA. 80+36 RT -YRPC- STA. 15+09 RT -YRPA- STA. 13+01 RT -Y_S- STA. 120+82 LT AA W PLAN VIEW SECTION A-A (4'min typ.) Permanent Soil Reinforcement matting (PSRM) Seed with native grasses at installation. *NOT TO SCALE B FI LL S LOP E2:12:1INFLOW 3/08 not shown for clarity) (Rip Rap in basin GROUND NATURAL Outlet Pipe or Ditch Scour Hole (PSH) Square Preformed D PSRM MIN. 1' TUCK WITH NATURAL GROUND INSTALL LEVEL AND FLUSH WITH GEOTEXTILE LINER: CLASS B RIPRAP DETAIL 28 - PREFORMED SCOUR HOLE PIPE (d = 18") W= 4' D= 1.5' B= 4.5' -YRPC- STA. 22+09 RT -YRPDB- STA. 15+69 RT F F F F F F 15" RCP-IV HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.9/30/2021c:\projectwise\pb\projectwiseint\wsp__victoria.kohlwey\d0339329\I3819_hyd_prm_psh10A_L10650-13550.dgnUSVK677148I-3819B DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NC LIC NO. F-0165 Suite 610, Charlotte, NC 28203 1001 Morehead Square Dr., MTL RIPRAPPOSS JB 15+00 65+0012'12'PS12'PS10'12'12'4'12'B-7712'12'PS12'PS10'12'12'4'12'EXIST. TO REMAIN B-77 B-77 50:1 PS11.7'TL-3 IA MASH +94.4 BEG. SBG PS12.6' 2GI 2GI SPECIAL 2GI ADJUST V10= 1.6 fps Q10= 83.2 cfs 2GI 2GI 2GI 15" RCP-IV 15" RCP-IV 2GI 2GI ************ *** WC F F F F F F F F F 15" RCP-IV 15" RCP-IV 24" RCP-III 24" RCP-III 15" RCP-IV 15" RCP-IV RCP-IV 15" MTL RIPRAPRIPRAP72" RCP24" RCPPOSS JB S -YRPCA- 20+00 70+00 12'12'12'12'4'PROP. SBG W/ G.R.PS11.7'040302(TYP) 36'RETAIN2 TON 7 SY CL B RIP RAP 2GI 2GI 3 TON 11 SY CL B RIP RAP REMOVE 24" RCP-IIISEE DETAIL 84 BANK STABILIZATION CLASS II RIP RAP * ** * * ** ** WD ********* * ( Not to Scale) See plan 1.0'min. DETAIL 84 RIP RAP BANK STABILIZATION d* Type of Liner= CL 1 or CL 2 Rip Rap (see plan) -YRPCA- STA. 77+00 RT -YRPCA- STA. 18+65 RT Grade Ex. or Pr. *d=18" for CL 1 and 30" for CL 2 (No Geotextile) SITE #2 25 50 100500 10A CLEARING DENOTES MECHANIZED* * * * ** * ** * * WETLAND DENOTES FILL INFF SITE #2 SITE #2 GRAPHIC SCALE - INSETNAD 83/95NC GRIDT T FILL IN WETLAND DENOTES TEMPORARY STRUCTURE #12) ACCESS - BRIDGE CONSTRUCTION (MATTING FOR IN WETLAND TEMPORARY FILL STRUCTURE #12) ACCESS - BRIDGE CONSTRUCTION (MATTING FOR IN WETLAND TEMPORARY FILL IN STREAM BED. WITH NCDWR. NO RIPRAP WAS PLACED IN THE FIELD THROUGH COORDINATION *NOTE: RIPRAP WAS INSTALLED SJ F FFF F F F 24" RCP-III HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.9/30/2021c:\projectwise\pb\projectwiseint\wsp__victoria.kohlwey\d0339329\I3819_hyd_prm_psh10A_L10650-13550.dgnUSVK677148I-3819B DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED NC LIC NO. F-0165 Suite 610, Charlotte, NC 28203 1001 Morehead Square Dr., 780 780780780 780780785785785 785 790790790 790 790 790790 MTL RIPRAPPOSS JB 15+00 65+0012'12'PS12'PS10'12'12'4'12'B-7712'12'PS12'PS10'12'12'4'12'EXIST. TO REMAIN B-77 B-77 50:1 PS11.7'TL-3 IA MASH +94.4 BEG. SBG PS12.6' 2GI 2GI SPECIAL 2GI ADJUST V10= 1.6 fps Q10= 83.2 cfs 2GI 2GI 2GI 15" RCP-IV 15" RCP-IV 2GI 2GI ************ *** WC F F F F F F F F F 15" RCP-IV 15" RCP-IV 24" RCP-III 24" RCP-III 15" RCP-IV 15" RCP-IV RCP-IV 15" 775 775 775775780780 7 80 780780 780780 7807807 8 5785785785 790 790790 790 795795 795 795MTL RIPRAPRIPRAP72" RCP24" RCPPOSS JB S -YRPCA- 20+00 70+00 12'12'12'12'4'PROP. SBG W/ G.R.PS11.7'040302(TYP) 36'RETAIN2 TON 7 SY CL B RIP RAP 2GI 2GI 3 TON 11 SY CL B RIP RAP REMOVE 24" RCP-IIISEE DETAIL 84 BANK STABILIZATION CLASS II RIP RAP * ** * * ** ** WD ********* * ( Not to Scale) See plan 1.0'min. DETAIL 84 RIP RAP BANK STABILIZATION d* Type of Liner= CL 1 or CL 2 Rip Rap (see plan) -YRPCA- STA. 77+00 RT -YRPCA- STA. 18+65 RT Grade Ex. or Pr. *d=18" for CL 1 and 30" for CL 2 (No Geotextile) SITE #2 25 50 100500 10A CLEARING DENOTES MECHANIZED* * * * ** * ** * * WETLAND DENOTES FILL INFF SITE #2 SITE #2 GRAPHIC SCALE - INSETNAD 83/95NC GRIDT T FILL IN WETLAND DENOTES TEMPORARY STRUCTURE #12) ACCESS - BRIDGE CONSTRUCTION (MATTING FOR IN WETLAND TEMPORARY FILL STRUCTURE #12) ACCESS - BRIDGE CONSTRUCTION (MATTING FOR IN WETLAND TEMPORARY FILL IN STREAM BED. WITH NCDWR. NO RIPRAP WAS PLACED IN THE FIELD THROUGH COORDINATION *NOTE: RIPRAP WAS INSTALLED SJ F FFF F F F 24" RCP-III 22 SEE SHEET NO. 21 STA. 80+40.00 -YRPAC- -MATCHLINE- SEE SH E ET N O . 1 0-MA TCH L IN E - S TA . 2 3 5 + 0 0 -Y _RT -SEE SH EET N O. 21STA. 120+00 -Y _S--M A TC H LIN E-NAD 83/95NC GRIDSEE SHEET NO. 11 STA. 21+60 -YRPD- STA. 44+50 -YRPCA-- MATCHLINE-SEE SHEET NO. 10 STA. 19+00.00 -YRPC- STA. 31+50.00 -YRPCA- -MATCHLINE- SEE SHEET NO. 10 STA. 66+90.00 -YRPAC--MATCHLINE- REVISIONS1 9/24/2021c:\projectwise\pb\projectwiseint\wsp__victoria.kohlwey\d0339329\I3819_hyd_prm_psh22_Y12000-13500.dgnUSVK677148LOCATION: DESIGNED BY: CHECKED BY: COUNTY:TIP NO.: DATE: HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/2/99IREDELL I-3819B DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I-3819B C. DAVIS D. AINSWORTH 4-2-2019 NC LIC NO. F-0165 Suite 610, Charlotte, NC 28203 1001 Morehead Square Dr., vv MTLBIKE TRAIL 10' BST MTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTL48" CHL48" CHL48" CHL 48" CHL48" CHL 48" CHL 48" CHL 48" CHL RIPRAP RIPRAP RIPRAP DI BENCH RI PRAPS DI RIPRAP RIPRAP DI DI107.27' 5.55'148.59'24.18' 8.33' EIP EIP EIP EIP 72.94'132.92' 40.82' 26.39' EIP OF TRANSPORTAT ION NORTH CAROL INA DEPARTMENT CHRISTOPHER DICKEY 99.34' 1 6 4 .7 4 'DUKE ENERGY -- 68' R/W730.56'G . L . WILSON BUILDING COMPANY SULLIVAN ROAD PARTNERS, LLC SULLIVAN ROAD PARTNERS, LLC AND KRISTEN TODD7.67' EIP-R/W 7 .7 1' E IP -R/W7.43' EIP-R/WEXISTING R/W "GREENWAY EASEMENT" -- 2 0' R/W"GREEN WAY EASE MENT" -- 20' R/W;;;; ; 15.00' 15.00' 15.00' AERIAL UTILITY EASEMENT AERIAL UTILITY EASEMENTDRAINAGE EASEMENTPERMANENT EOIEOIEO IEO IMT L MTLMTLMTLMTL12" CMPDI15" RCP15" RCP 30" RCP24" RCPFES18" R C P 18" R CP DIDIW/FESDI 72" PAVED 48" PAVED48" PAVED72" PAVED30"VCP 20.00'R/WEXISTING I-77 NB 37.5' BSTI-77 NB RAMP 38' BSTBSTI-40 EB RAMP CONC VARIESI-77 NB RAMP BST VARIES 15" CMP15" RCP 36" RCP15" RCP15" RCP 15" RCPB IKE TRA IL 10' BSTMTLMTLMTLMTL S SMTLMTL48" CHL 48" CHLB IKE TRA IL 10' BSTWOODMTLMTLBST48" WW125.92'97.41'281.26'DUKE ENERGY -- 68' R/WDUKE ENERGY -- 68' R/W"G RE ENW AY EA SEM EN T" - - 20' R/W 96 .23'11.23'EXISTING R/WEXISTING R/W68.00'EASEMENTDRAINAGE PERMANENT pMTLMTL15" CMPDICONCCONC30"V C P30"VCP 3 0"VCP3 0"VCP20.00'18" C&G18" C&G18" C&G18" C&G6" CURBBST BRIDGEBST BRIDGE12 " CM P12" CM P 519 S ;;;STATESVILLE CITY OF AN UNDIVIDED 5% INTEREST JOYCE R. JOHNSON ALLEN C. JOHNSON AND LIMITED PARTNERSHIP SUPERIOR PROPERTIES OF IREDELL PROP. CHL FENCE PROP CH L FENCEPROP CHL FENCE PROP CHL FENCE-YRPAC--YRPD- -Y R PD B - -YRPDB- -YRPAC- -YRPD- -YRPDB- -YRPC- -YRPCA-130+00-YRPCA- SE = 06 DS = 50 MPH SE = 06 DS = 50 MPH SE = 04 DS = 50 MPH SE = 06 DS = 50 MPH SE = 05 DS = 60 MPH SE = 05 DS = 60 MPH DS = 50 MPH SE = 06 SE = NC DS = 50 MPH SE = NC DS = 60 MPH -YRPCA- - Y RP C--YRPC-SE = NC DS = 50 MPH PIs Sta 11+93.35 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 14+07.08 D L = 327.27' T = 165.77' R = 833.00' PIs Sta 16+16.61 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 22+11.11 D L = 730.47' T = 365.50' R = 7,870.00'10+0015+00 20+00 125+00PI Sta 117+68.63 D L = 1,074.43' T = 537.61' R = 11,500.00'15+0020+0025+0030+00 PIs Sta 23+74.30 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 26+43.97 D L = 433.64' T = 221.71' R = 845.00' PIs Sta 29+03.94 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 74+01.12 D L = 593.15' T = 297.92' R = 2,550.00'70+0075+0080+00PI Sta 41+32.83 D L = 1,389.22' T = 917.93' R = 833.00'35+0040+00 -Y_S- PIs Sta 30+95.94 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 14+24.03 D L = 392.80' T = 196.43' R = 9,000.00' PIs Sta 31+66.93 Ls = 144.00' F LT = 96.04' ST = 48.03'230+00PIs Sta 232+62.32 F Ls = 200.00' LT = 133.34' ST = 66.67' PI Sta 235+92.32 D L = 525.34' T = 263.34' R = 3,000.00' -Y_RT-330+00PIs Sta 331+73.81 F Ls = 270.00' LT = 180.02' ST = 90.02' PI Sta 334+86.61 D L = 444.82' T = 222.82' R = 3,000.00' -Y_LT- PIs Sta 20+25.04 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 24+66.97 D L = 736.00' T = 393.97' R = 833.00' PIs Sta 28+57.03 F Ls = 144.00' LT = 96.04' ST = 48.03' 20+00 25+00-Y RT--Y LT-120+00235+00335+0012'12'PS 12' PS4' 12'12' PS 4' PS 12'12'12' 24'12'12'24'36' 12' 12' 12' 12' 12' 12' 36' PS 11' PS 11' 12'12'12'12'12'12'48'12'12'12'12'60'12'12'12'12'12'PS11'12' PS 4'12'12'GREU TL-3CAT-1G REU TL-3 12' PS 12'PS 14' PS 14' P R OP. GUAR DR AIL PROP. GUARDRAIL PROP. GUARDRAILPROP. GUARDRAILCAT-1 8:1 12'12'12' 1 2'12'12'1 2'PS1 1. 7'PS11.7'12'12' PS 12' PS 4' PS 4'PS12'GREU TL-3PS11.7' PS 14' 50:1 50:1PS17.7'PROP. SBG W/ G.R. 8:1 8:18:1 C AT-1 B-77B-77B-77B-77 B -7 7B -7 7B-77B-77B-7712' SFB W/ RET. WALL +008:1 12'12'PS14' PS14'PS12' 12'12'PS 12' PS 4'+ 00 12'12'PS4'PS4'1 2'1 2'PS4' +59.7 +54.2 END SBG S B G W/ G. R. 12' PS11.7'12'PS4' PS 20'25:1 25:1 W/ RET. WALL +00 END G.R./ BEG SFB SFB W/ RET. WALL8:1S.F.B.+ 6 0.3 3BEG . G.R. END SFB +22.3EN D SFB SBG W/ G.R.50:18:1 +60 12'12'12'PS11'PS12'PS12'PS14'PS11'12'12'12' 12'PS11.7'12'PS9' +25 GUTTER END EXP. +92.1 END SBG W/ 1.5:1 SLOPE ROCK PLATING PROP. G.R.PROP. RET. WALL W/ SFB CAT-1 +08 PS 9.7'+52+06.5PROP. SFB w/ MOMENT SLAB S.F.B.+ 07 .06 144' SHLD. TAPER 2 5:1 +00 +50 +73 24:1 +10.95B EG. T -BAR. TL-3GREU 185.72 +99.14 PS12' +50 PS11.7'50:1PS 11.7' 77:1 BY OTHERS TOWER RELOCATED BY OTHERS TOWER RELOCATED + 8 8.1 END SBG +29.85END TAPER000102030405050403020100010206050 6 05040302060504030206 05 04 03 0 2 01 0 0 01 0 2 03 04 05 06 0605 0202 02 (TYP)40'(TYP)54'02 (TYP)24' 06 05 04 03 02 03 04 02 04 02(TYP)24'(TYP)24'(TYP)24'(TYP)24' (TYP)24' 04 06 05040302 (T YP)24'040302(TYP)24'03 0100 +20.32 02 02 63.64' RT +06.39 -YRPD- 67.61' RT +08.88 -YRPD- 87.00' RT +47.01 -YRPD- 5 6 82.29' RT +10.22 -YRPDB- 113.81' RT +52.96 -YRPDB- 59.05' RT +18.67 -YRPD- 90.56' RT +37.16 -YRPD- 7REMOVERE MOVE REMOVERE MOVE 2GI 2GI 2GI 2GI 2GI 2GI 2GI FS FS 2GI REMOVEREMOV E 2GI FS R EM OVE REMOV E 2GI 2GI R EM O V E 15" RCP-III 18" RCP-III 1 TONS 5 SY CL B RIP RAP REMOVEFS 18" RCP-III 15" RCP-III 15" RCP-IV 18" CSP2GI 2GI 2GI 2GI 2GI REMOVESEE DETAIL 14 W/ CLASS B RIPRAP LATERAL 5' BASE DITCH 15" RCP-III 2GI 36" R CP-III 3 6" R C P-III 2GI 2GI GRADE TO DRAIN 2 TONS 7 SY CL B RIP RAP RE MOVE 15" RCP-III SEE DETAIL 16 'V' DITCH SPECIAL CUT 15" CSP 15" RCP-III FS 36" RCP-IIISEE DETAIL 15 BEHIND RETAINING WALL CONCRETE DITCH SEE DETAIL 23 'V' DITCH SPECIAL LATERAL SEE DETAIL 25 W/ CLASS 1 RIPRAP TOE PROTECTION 1 REMOVESEE DETAIL 27 PSH15" CSPSEE DETAIL 27 PSH SEE DETAIL 13 AT EMBANKMENT CLASS 2 RIP RAP SEE DETAIL 29 AT EMBANKMENT CLASS I RIP RAP SEE DETAIL 28 PSH SEE DETAIL 27 PSH DETAIL 27 SEE PSH SEE DETAIL 31 WITH CLASS B RIPRAP TOE PROTECTION 2GI 2GI 2GI 15" RCP-IV15" RCP-IV 15 TONS 30 S.Y. CL 1 RIP RAP 2GI-A 2GI-A 2GI-D 2GI-D V10= 8.1 fps Q10= 7.3 cfs TB 2GI TB 2GI TB 2GI JB w/MH V10= 8.8 fps Q10= 5.3 cfs SEE DETAIL 28 PSH 15" RCP-IV18" RCP-IV2GI 15" RCP-IV2GI-A 2GI 2GI 2GI 2GI-A15" RCP-I V15" RCP-IV 15" R CP-III W/ ELBOW S18" R CP -III15" RCP-IVW/ ELBOW SSEE DETAIL 31 WITH CLASS B RIPRAP TOE PROTECTION SEE DETAIL 31 B RIPRAP WITH CLASS TOE PROTECTION W/ ELBOWS15" CSPW/ ELBOW S15" CSPHW 18" RCP-III SEE DETAIL 56 LATERAL 2' BASE DITCH SEE DETAIL 92 W/ CLASS 1 RIPRAP LATERAL 3' BASE DITCH 2GI 15" RCP-IV 2GI 15" R CP-III 2 TON 7 SY CLASS B RIP RAP 3 TON 10 SY CLASS B RIP RAP 2GI15" RCP-IV 15" RCP-V 2GI-D JB w/MH W/ ELBOWS15" CSP2GI-D GTD GTD GTD 15" RCP-III 15" RCP-I V 36" RCP-II I TB 2GI TB 2GI15" RCP-I VREMOVE REMOVE REMOVE REMOVE *at Riprap Apron V2= 1.9 fps* Q2= 4.1 cfs 2GI 2GISEE DETAIL 13 AT EMBANKMENT CLASS 2 RIP RAP SEE DETAIL 58 5' BASE DITCH LATERAL 4 TONS 10 SYCL 1 RIP RAPF * WD WH SJ WD F F F F F F F s ******* SITE #7 SITE #8 SITE #3 SITE #5 SITE #6 SITE #4 SITE #7A F F F F FFFFFFFFFFFFFFFFFFFFFFFFF F F F F FF CFCFFFFF F C F C F C C C C F F F F F FF F C C C C C 15" RCP-III 15" RCP-IV 15" RCP-III 15" RCP-IV 15" RCP-IV 15" RCP-IV 15 " RCP -IV 15" RCP-IV 15 " RCP -IV RCP-III 36" 15" RCP-IV ELBOWS CSP W/ 15"MTLMTL12' PS11.7' 12' PS4' W/ 1.5:1 SLOPE ROCK PLATING +50 2GI15" CSP 15" RCP-III *******FFF15" RCP-IIIAERIAL UTILITY EASEMENTDRAINAGE EASEMENTPERMANENT PROP CHL FENCE022GI15" RCP- III SEE DETAIL 27 PSH15" CSP2GI W/ ELBOW SF * F WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SEE SHEET 22B SEE SHEET 22B T T FILL IN WETLAND DENOTES TEMPORARY SEE SHEET 22A 25 5012.5 025 GRAPHIC SCALE - INSETS INSETSITE #8 SEE INSET SITE #8 SEE SHEET 22A SEE INSET SITE #4 SITE #4 INSET 15" RCP-IV PERMIT DRAWING SHEET 46 OF 67 Rev. 10/04/2021 22 SEE SHEET NO. 21 STA. 80+40.00 -YRPAC- -MATCHLINE- SEE SH E ET N O . 1 0-MA TCH L IN E - S TA . 2 3 5 + 0 0 -Y _RT -SEE SH EET N O. 21STA. 120+00 -Y _S--M A TC H LIN E-NAD 83/95NC GRIDSEE SHEET NO. 11 STA. 21+60 -YRPD- STA. 44+50 -YRPCA-- MATCHLINE-SEE SHEET NO. 10 STA. 19+00.00 -YRPC- STA. 31+50.00 -YRPCA- -MATCHLINE- SEE SHEET NO. 10 STA. 66+90.00 -YRPAC--MATCHLINE- REVISIONS1 9/24/2021c:\projectwise\pb\projectwiseint\wsp__victoria.kohlwey\d0339329\I3819_hyd_prm_psh22_Y12000-13500.dgnUSVK677148LOCATION: DESIGNED BY: CHECKED BY: COUNTY:TIP NO.: DATE: HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.6/2/99IREDELL I-3819B DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED I-3819B C. DAVIS D. AINSWORTH 4-2-2019 NC LIC NO. F-0165 Suite 610, Charlotte, NC 28203 1001 Morehead Square Dr., 770770770770 770 770770770770770770770 770770770770770 770770770770775775775 775775 775775 775 775775775775775775775775775775775 775775 775 775 775 775775775775775775775775775775 7 75 7757757757 7 5 775775 775775775 775775 7757757757757757757757757757757757 75775 775 775775775775775775775775775 775 7757757 7 5 7757757757757757757757757757757757757757757757757757757757757757757757 7 5775775 775775 7 75 775 775 775 775 7757757 7 5 775775775775775775 775775775775775 775775775775775775 775 7 7 5 775 7757757757757 7 5 775 775775775775 775775775775775 775 775 775775 775 775775775 775775775 77577577 5 775 775775775775 775 775775775 780 7807807807 8 0780780 7807 8 07807807807807807 8 0 7807807807807 80 780780780780 780780780 780 7 80 7 8 0 780 780780 78 0780780780780780 780 780780780780 7807807 8 0 780780 7807807807 8 078078078 0780 780 780 7 80780780 780 780780780780780780780780780780780780780780780780 780 78078 0 7 80 780780780780780 780 780780780780780 780 780780 780780 7807807807 807807807 8 0 780 780780785785785785785785785785785 785785785785785 785 785785785785 785785785 785 7 8 5 785785785785 78578578578578 5 785785 785785785785785785785785785 785785785785785785785785 785 785785785 785 785 785785785785785785785785785785785785785785 785785785 7 9 0790 7907907907 9 0790790790790790790790790 790790 790790790790790790790 790790790790790790 7 9 0790790790790 7907907907907907907907907 90 790 790790 790 790 790790790 790790790790790790790790790790790790790 790 790 790795795795795795 795795795795795795795 795 795 795 795795 795795795795 795795795795 795795795 795 795795795 79579579579 5 7 9 5 795 795 795 795 795 795795 795795795 795 795 795 795795795 795795795795795795795 795 795795800800800 8008008008 0 0 800 800 800 800800800800800 800 800 800 800800 800 800 800800800800 80 0 800 800 8 0 0 800 800 800 800800 800800800 800 800 8008008008008008 0 0 805 805 8 0 5 805805 80 5 805 805 805 805 805 805805 805 805 805805805805 805 805 805 805805805805 805 805 805 805 805 805 8058058058058058058058 0 5 805805810810 810810810810810 810 8 1 0 8 10 810 810810 810810810 810 810 810 810810810 810 810810810810810 810810810 810 810 8 10 810 810810810 810 810 810810 810810810810810810810810815815 815 815815 815 815815 815 8158 1 5815 815 815815815815 815 815 815 815 815 815 815 8 15 815815815 815 8158158 1 5 8158158 15 8158158158158158158158158158158158 15 815 815 815815815 815 815815820820820820820820820820 820820 820 820 820820 820 820 820 820 820 820820820820820820820820820 820820820 820820820 820 820 820820 820820 820820820 820 825825825825 825 825825 825 825 825 825 825825825825 825 825825 825 825 825825825825825825 825825830 830 830 835 vv MTLBIKE TRAIL 10' BST MTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTLMTL48" CHL48" CHL48" CHL 48" CHL48" CHL 48" CHL 48" CHL 48" CHL RIPRAP RIPRAP RIPRAP DI BENCH RI PRAPS DI RIPRAP RIPRAP DI DI107.27' 5.55'148.59'24.18' 8.33' EIP EIP EIP EIP 72.94'132.92' 40.82' 26.39' EIP OF TRANSPORTAT ION NORTH CAROL INA DEPARTMENT CHRISTOPHER DICKEY 99.34' 1 6 4 .7 4 'DUKE ENERGY -- 68' R/W730.56'G . L . WILSON BUILDING COMPANY SULLIVAN ROAD PARTNERS, LLC SULLIVAN ROAD PARTNERS, LLC AND KRISTEN TODD7.67' EIP-R/W 7 .7 1' E IP -R/W7.43' EIP-R/WEXISTING R/W "GREENWAY EASEMENT" -- 2 0' R/W"GREEN WAY EASE MENT" -- 20' R/W;;;; ; 15.00' 15.00' 15.00' AERIAL UTILITY EASEMENT AERIAL UTILITY EASEMENTDRAINAGE EASEMENTPERMANENT EOIEOIEO IEO IMT L MTLMTLMTLMTL12" CMPDI15" RCP15" RCP 30" RCP24" RCPFES18" R C P 18" R CP DIDIW/FESDI 72" PAVED 48" PAVED48" PAVED72" PAVED30"VCP 20.00'R/WEXISTING I-77 NB 37.5' BSTI-77 NB RAMP 38' BSTBSTI-40 EB RAMP CONC VARIESI-77 NB RAMP BST VARIES 15" CMP15" RCP 36" RCP15" RCP15" RCP 15" RCPB IKE TRA IL 10' BSTMTLMTLMTLMTL S SMTLMTL48" CHL 48" CHLB IKE TRA IL 10' BSTWOODMTLMTLBST48" WW125.92'97.41'281.26'DUKE ENERGY -- 68' R/WDUKE ENERGY -- 68' R/W"G RE ENW AY EA SEM EN T" - - 20' R/W 96 .23'11.23'EXISTING R/WEXISTING R/W68.00'EASEMENTDRAINAGE PERMANENT pMTLMTL15" CMPDICONCCONC30"V C P30"VCP 3 0"VCP3 0"VCP20.00'18" C&G18" C&G18" C&G18" C&G6" CURBBST BRIDGEBST BRIDGE12 " CM P12" CM P 519 S ;;;STATESVILLE CITY OF AN UNDIVIDED 5% INTEREST JOYCE R. JOHNSON ALLEN C. JOHNSON AND LIMITED PARTNERSHIP SUPERIOR PROPERTIES OF IREDELL PROP. CHL FENCE PROP CH L FENCEPROP CHL FENCE PROP CHL FENCE-YRPAC--YRPD- -Y R PD B - -YRPDB- -YRPAC- -YRPD- -YRPDB- -YRPC- -YRPCA-130+00-YRPCA- SE = 06 DS = 50 MPH SE = 06 DS = 50 MPH SE = 04 DS = 50 MPH SE = 06 DS = 50 MPH SE = 05 DS = 60 MPH SE = 05 DS = 60 MPH DS = 50 MPH SE = 06 SE = NC DS = 50 MPH SE = NC DS = 60 MPH -YRPCA- - Y RP C--YRPC-SE = NC DS = 50 MPH PIs Sta 11+93.35 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 14+07.08 D L = 327.27' T = 165.77' R = 833.00' PIs Sta 16+16.61 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 22+11.11 D L = 730.47' T = 365.50' R = 7,870.00'10+0015+00 20+00 125+00PI Sta 117+68.63 D L = 1,074.43' T = 537.61' R = 11,500.00'15+0020+0025+0030+00 PIs Sta 23+74.30 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 26+43.97 D L = 433.64' T = 221.71' R = 845.00' PIs Sta 29+03.94 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 74+01.12 D L = 593.15' T = 297.92' R = 2,550.00'70+0075+0080+00PI Sta 41+32.83 D L = 1,389.22' T = 917.93' R = 833.00'35+0040+00 -Y_S- PIs Sta 30+95.94 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 14+24.03 D L = 392.80' T = 196.43' R = 9,000.00' PIs Sta 31+66.93 Ls = 144.00' F LT = 96.04' ST = 48.03'230+00PIs Sta 232+62.32 F Ls = 200.00' LT = 133.34' ST = 66.67' PI Sta 235+92.32 D L = 525.34' T = 263.34' R = 3,000.00' -Y_RT-330+00PIs Sta 331+73.81 F Ls = 270.00' LT = 180.02' ST = 90.02' PI Sta 334+86.61 D L = 444.82' T = 222.82' R = 3,000.00' -Y_LT- PIs Sta 20+25.04 F Ls = 144.00' LT = 96.04' ST = 48.03' PI Sta 24+66.97 D L = 736.00' T = 393.97' R = 833.00' PIs Sta 28+57.03 F Ls = 144.00' LT = 96.04' ST = 48.03' 20+00 25+00-Y RT--Y LT-120+00235+00335+0012'12'PS 12' PS4' 12'12' PS 4' PS 12'12'12' 24'12'12'24'36' 12' 12' 12' 12' 12' 12' 36' PS 11' PS 11' 12'12'12'12'12'12'48'12'12'12'12'60'12'12'12'12'12'PS11'12' PS 4'12'12'GREU TL-3CAT-1G REU TL-3 12' PS 12'PS 14' PS 14' P R OP. GUAR DR AIL PROP. GUARDRAIL PROP. GUARDRAILPROP. GUARDRAILCAT-1 8:1 12'12'12' 1 2'12'12'1 2'PS1 1. 7'PS11.7'12'12' PS 12' PS 4' PS 4'PS12'GREU TL-3PS11.7' PS 14' 50:1 50:1PS17.7'PROP. SBG W/ G.R. 8:1 8:18:1 C AT-1 B-77B-77B-77B-77 B -7 7B -7 7B-77B-77B-7712' SFB W/ RET. WALL +008:1 12'12'PS14' PS14'PS12' 12'12'PS 12' PS 4'+ 00 12'12'PS4'PS4'1 2'1 2'PS4' +59.7 +54.2 END SBG S B G W/ G. R. 12' PS11.7'12'PS4' PS 20'25:1 25:1 W/ RET. WALL +00 END G.R./ BEG SFB SFB W/ RET. WALL8:1S.F.B.+ 6 0.3 3BEG . G.R. END SFB +22.3EN D SFB SBG W/ G.R.50:18:1 +60 12'12'12'PS11'PS12'PS12'PS14'PS11'12'12'12' 12'PS11.7'12'PS9' +25 GUTTER END EXP. +92.1 END SBG W/ 1.5:1 SLOPE ROCK PLATING PROP. G.R.PROP. RET. WALL W/ SFB CAT-1 +08 PS 9.7'+52+06.5PROP. SFB w/ MOMENT SLAB S.F.B.+ 07 .06 144' SHLD. TAPER 2 5:1 +00 +50 +73 24:1 +10.95B EG. T -BAR. TL-3GREU 185.72 +99.14 PS12' +50 PS11.7'50:1PS 11.7' 77:1 BY OTHERS TOWER RELOCATED BY OTHERS TOWER RELOCATED + 8 8.1 END SBG +29.85END TAPER000102030405050403020100010206050 6 05040302060504030206 05 04 03 0 2 01 0 0 01 0 2 03 04 05 06 0605 0202 02 (TYP)40'(TYP)54'02 (TYP)24' 06 05 04 03 02 03 04 02 04 02(TYP)24'(TYP)24'(TYP)24'(TYP)24' (TYP)24' 04 06 05040302 (T YP)24'040302(TYP)24'03 0100 +20.32 02 02 63.64' RT +06.39 -YRPD- 67.61' RT +08.88 -YRPD- 87.00' RT +47.01 -YRPD- 5 6 82.29' RT +10.22 -YRPDB- 113.81' RT +52.96 -YRPDB- 59.05' RT +18.67 -YRPD- 90.56' RT +37.16 -YRPD- 7REMOVERE MOVE REMOVERE MOVE 2GI 2GI 2GI 2GI 2GI 2GI 2GI FS FS 2GI REMOVEREMOV E 2GI FS R EM OVE REMOV E 2GI 2GI R EM O V E 15" RCP-III 18" RCP-III 1 TONS 5 SY CL B RIP RAP REMOVEFS 18" RCP-III 15" RCP-III 15" RCP-IV 18" CSP2GI 2GI 2GI 2GI 2GI REMOVESEE DETAIL 14 W/ CLASS B RIPRAP LATERAL 5' BASE DITCH 15" RCP-III 2GI 36" R CP-III 3 6" R C P-III 2GI 2GI GRADE TO DRAIN 2 TONS 7 SY CL B RIP RAP RE MOVE 15" RCP-III SEE DETAIL 16 'V' DITCH SPECIAL CUT 15" CSP 15" RCP-III FS 36" RCP-IIISEE DETAIL 15 BEHIND RETAINING WALL CONCRETE DITCH SEE DETAIL 23 'V' DITCH SPECIAL LATERAL SEE DETAIL 25 W/ CLASS 1 RIPRAP TOE PROTECTION 1 REMOVESEE DETAIL 27 PSH15" CSPSEE DETAIL 27 PSH SEE DETAIL 13 AT EMBANKMENT CLASS 2 RIP RAP SEE DETAIL 29 AT EMBANKMENT CLASS I RIP RAP SEE DETAIL 28 PSH SEE DETAIL 27 PSH DETAIL 27 SEE PSH SEE DETAIL 31 WITH CLASS B RIPRAP TOE PROTECTION 2GI 2GI 2GI 15" RCP-IV15" RCP-IV 15 TONS 30 S.Y. CL 1 RIP RAP 2GI-A 2GI-A 2GI-D 2GI-D V10= 8.1 fps Q10= 7.3 cfs TB 2GI TB 2GI TB 2GI JB w/MH V10= 8.8 fps Q10= 5.3 cfs SEE DETAIL 28 PSH 15" RCP-IV18" RCP-IV2GI 15" RCP-IV2GI-A 2GI 2GI 2GI 2GI-A15" RCP-I V15" RCP-IV 15" R CP-III W/ ELBOW S18" R CP -III15" RCP-IVW/ ELBOW SSEE DETAIL 31 WITH CLASS B RIPRAP TOE PROTECTION SEE DETAIL 31 B RIPRAP WITH CLASS TOE PROTECTION W/ ELBOWS15" CSPW/ ELBOW S15" CSPHW 18" RCP-III SEE DETAIL 56 LATERAL 2' BASE DITCH SEE DETAIL 92 W/ CLASS 1 RIPRAP LATERAL 3' BASE DITCH 2GI 15" RCP-IV 2GI 15" R CP-III 2 TON 7 SY CLASS B RIP RAP 3 TON 10 SY CLASS B RIP RAP 2GI15" RCP-IV 15" RCP-V 2GI-D JB w/MH W/ ELBOWS15" CSP2GI-D GTD GTD GTD 15" RCP-III 15" RCP-I V 36" RCP-II I TB 2GI TB 2GI15" RCP-I VREMOVE REMOVE REMOVE REMOVE *at Riprap Apron V2= 1.9 fps* Q2= 4.1 cfs 2GI 2GISEE DETAIL 13 AT EMBANKMENT CLASS 2 RIP RAP SEE DETAIL 58 5' BASE DITCH LATERAL 4 TONS 10 SYCL 1 RIP RAPF * WD WH SJ WD F F F F F F F s ******* SITE #7 SITE #8 SITE #3 SITE #5 SITE #6 SITE #4 SITE #7A F F F F FFFFFFFFFFFFFFFFFFFFFFFFF F F F F FF CFCFFFFF F C F C F C C C C F F F F F FF F C C C C C 15" RCP-III 15" RCP-IV 15" RCP-III 15" RCP-IV 15" RCP-IV 15" RCP-IV 15 " RCP -IV 15" RCP-IV 15 " RCP -IV RCP-III 36" 15" RCP-IV ELBOWS CSP W/ 15"785785790790795795800MTLMTL12' PS11.7' 12' PS4' W/ 1.5:1 SLOPE ROCK PLATING +50 2GI15" CSP 15" RCP-III *******FFF15" RCP-III 775775AERIAL UTILITY EASEMENTDRAINAGE EASEMENTPERMANENT PROP CHL FENCE022GI15" RCP- III SEE DETAIL 27 PSH15" CSP2GI W/ ELBOW SF * F WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SEE SHEET 22B SEE SHEET 22B T T FILL IN WETLAND DENOTES TEMPORARY SEE SHEET 22A 25 5012.5 025 GRAPHIC SCALE - INSETS INSETSITE #8 SEE INSET SITE #8 SEE SHEET 22A SEE INSET SITE #4 SITE #4 INSET 15" RCP-IV PERMIT DRAWING SHEET 47 OF 67 Rev. 10/04/2021 ( Not to Scale) RIP RAP AT EMBANKMENT Grade Ditch 2' GEOTEXTILE 10'min. 1.0'min. DETAIL 13 Type of Liner= Class 2 Rip-Rap -YRPDB- 14+25 RT -YRPAC- 78+50 RT -YRPAC- 27+86 RT -Y_S- STA. 33+80 RT -Y_S- STA. 69+50 LT ( Not to Scale) 2:12:1D B b LATERAL BASE DITCH 1"/Ft. -YRPDB- FROM STA. 11+99 TO STA. 14+29 RT DETAIL 58 b= 5.0 Ft. B= 5.0 Ft. Min. D= 1.5 Ft. Ground Natural Slope Fill SEE DETAIL 13 AT EMBANKMENT CLASS 2 RIP RAP s B IKE TRA IL 10' B ST S S96 .23'11.23'p 1 5" CMP12'12'12' 82.29' RT +10.22 -YRPDB- SEE DETAIL 13 AT EMBANKMENT CLASS 2 RIP RAP SEE DETAIL 58 5' BASE DITCH LATERAL HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.9/30/2021c:\projectwise\pb\projectwiseint\wsp__victoria.kohlwey\d0339329\I3819_hyd_prm_psh22A_Y12000-13500.dgnUSVK677148I-3819B DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 2550 22A TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN SURFACE WATER TEMPORARY IMPACTS IN INSET 5025 INSET FOURTH CREEK FOURTH CREEK SITE# 6 SURFACE WATER TEMPORARY IMPACTS IN GRAPHIC SCALE - INSETSNAD 83/95NC GRIDSITE# 7 & 7A SITE 7A SITE 7 SURFACE WATER TEMPORARY IMPACTS IN SURFACE WATER IMPACTS IN FROM NCDWR. IN THE FIELD PER GUIDANCE NOTE: RIPRAP WAS INSTALLED WATER SURFACE IMPACTS IN PERMIT DRAWING SHEET 48 OF 67 Rev. 10/04/2021 ( Not to Scale) RIP RAP AT EMBANKMENT Grade Ditch 2' GEOTEXTILE 10'min. 1.0'min. DETAIL 13 Type of Liner= Class 2 Rip-Rap -YRPDB- 14+25 RT -YRPAC- 78+50 RT -YRPAC- 27+86 RT -Y_S- STA. 33+80 RT -Y_S- STA. 69+50 LT ( Not to Scale) 2:12:1D B b LATERAL BASE DITCH 1"/Ft. -YRPDB- FROM STA. 11+99 TO STA. 14+29 RT DETAIL 58 b= 5.0 Ft. B= 5.0 Ft. Min. D= 1.5 Ft. Ground Natural Slope Fill775780785SEE DETAIL 13 AT EMBANKMENT CLASS 2 RIP RAP s 770 770 770770775775 775775780780B IKE TRA IL 10' B ST S S96 .23'11.23'p 1 5" CMP12'12'12' 82.29' RT +10.22 -YRPDB- SEE DETAIL 13 AT EMBANKMENT CLASS 2 RIP RAP SEE DETAIL 58 5' BASE DITCH LATERAL HYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO. SHEET NO.PROJECT REFERENCE NO.9/30/2021c:\projectwise\pb\projectwiseint\wsp__victoria.kohlwey\d0339329\I3819_hyd_prm_psh22A_Y12000-13500.dgnUSVK677148I-3819B DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED 0 2550 22A TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY S S SURFACE WATER DENOTES IMPACTS IN SURFACE WATER TEMPORARY IMPACTS IN INSET 5025 INSET FOURTH CREEK FOURTH CREEK SITE# 6 SURFACE WATER TEMPORARY IMPACTS IN GRAPHIC SCALE - INSETSNAD 83/95NC GRIDSITE# 7 & 7A SITE 7A SITE 7 SURFACE WATER TEMPORARY IMPACTS IN SURFACE WATER IMPACTS IN FROM NCDWR. IN THE FIELD PER GUIDANCE NOTE: RIPRAP WAS INSTALLED WATER SURFACE IMPACTS IN PERMIT DRAWING SHEET 49 OF 67 Rev. 10/04/2021 Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 1 Site 1 Eliminated 2 14+00 -21+50-YRPCA-Roadway Fill 0.32 0.09 2 16+70 - 21+50-YRPCA-Bridge/Stream Bank Stabilization**0.04 0.61 0.02 0.02 < 0.01 115 10 3 15+75-YRPC-Roadway Fill < 0.01 0.01 0.02 < 0.01 206 10 4 24+00-YRPC-Roadway Fill 0.02 5 70+00 - 76+25 -YRPAC-Bridge 0.03 1.81 0.05 5 72+70 - 74+50 -YRPAC-Construction Access 0.23 0.02 77 6 121+50-Y_LT-Stream Bank Stabilization < 0.01 < 0.01 12 20 7 120+90-Y_RT-Stream Bank Stabilization < 0.01 < 0.01 12 20 7A 120+95-Y_RT-Stream Bank Stabilization**< 0.01 < 0.01 19 21 8 19+00-YRPDB-Roadway Fill < 0.01 < 0.01 9 28+50 - 34+00-YRPAC-Roadway Fill 0.40 0.08 0.07 < 0.01 747 10 9A 28+10 - 28+30-YRPAC-Construction Access 0.01 50 10 28+00-YRPAC-Stream Bank Stabilization < 0.01 < 0.01 25 20 11 27+50 - 26+50-YRPAC Roadway Fill 0.19 0.02 12 149+00-150+00-L-Bridge < 0.01 0.01 10 54 13 167+00-Y_RT-Stream Bed Stabilization < 0.01 17 13 167+00-Y_RT-Stream Bank Stabilization < 0.01 < 0.01 44 10 14 28+50-Y-Stream Bed Stabilization < 0.01 < 0.01 17 10 15 33+75-Y-Stream Bank Stabilization < 0.01 < 0.01 11 20 16 37+10-37+20-Y-54" RCP Extension < 0.01 15 16 35+90-37+10-Y-Stream Bed Stabilization < 0.01 < 0.01 98 10 17 37+70-37+80-Y-54" RCP Extension < 0.01 20 17 37+80-38+50-Y-Stream Bed Stabilization 0.01 < 0.01 94 14 SHEET 66 SUBTOTALS*:0.98 2.64 0.00 0.29 0.00 0.16 0.07 1462 356 0.00 *Rounded totals are sum of actual impacts for sites listed on Sheet 66. See Sheet 67 for project total. Revised 2018 Feb SHEET 66 OF 67 WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS IREDELL TIP NO. I-3819B WBS NO. NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS 10/04/2021 **Additional riprap was added for bank stabilization per NCDWR request Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft)(ft)(ft) 18 47+50-Y-54" RCP Extension < 0.01 39 18 47+50-Y-Stream Bed Stabilization < 0.01 < 0.01 33 10 19 46+00-Y-Roadway Fill < 0.01 34 20 68+50-Y-New Channel < 0.01 < 0.01 13 10 20 68+50-Y-Roadway Fill < 0.01 48 21 70+20-Y- 3@9'X11" RCBC Extension 0.02 39 21 69+20-70+20-Y-Stream Bed Stabilization 0.08 < 0.01 137 21 22 71+30-71+90-Y- 3@9'X11" RCBC Extension 0.02 45 22 71+90-72+89-Y-Stream Bed Stabilization 0.08 160 22 72+89-75+10-Y-Stream Bank Stabilization**0.08 225 22 75+10-84+00-Y-Stream Bank Stabilization 0.34 901 22 83+59-83+85-Y-Stream Bed Stabilization < 0.01 25 23 87+70-Y-Roadway Fill < 0.01 33 24 93+75-Y-66" RCP Extension < 0.01 < 0.01 49 10 25 94+50-Y-66" RCP Extension < 0.01 10 25 94+50-Y-Stream Bed Stabilization < 0.01 < 0.01 21 21 26 116+70-120+10-Y-Roadway Fill 0.09 0.04 27 210+00-Y-60" RCP Extension < 0.01 29 27 210+00-Y-Stream Bed Stabilization < 0.01 < 0.01 19 10 28 24+00-Y15RPB-Stream Bed Stabilization < 0.01 < 0.01 16 11 SHEET 66 SUBTOTAL 0.98 2.64 0.00 0.29 0.00 0.16 0.07 1462 356 0.00 SHEET 67 SUBTOTAL 0.09 0.00 0.00 0.04 0.00 0.67 0.03 1843 126 0.00 PROJECT TOTALS*:1.07 2.64 0.00 0.33 0.00 0.83 0.10 3305 482 0.00 *Rounded totals are sum of actual impacts for entire project area Revised 2018 Feb SHEET 67 OF 67 10/04/2021 IREDELL TIP NO. I-3819B WBS NO. WETLAND AND SURACE WATER IMPACTS SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS As-built survey limits for riprap installed on banks at Site 2; see permit drawings for additional information. As-built survey limits for riprap installed on banks at Site 7A; see permit drawings for additional information.