Loading...
HomeMy WebLinkAboutNCC201249_NOT Closeout Documents_20211021North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Robeson Project: RLNG Laydown Yard Person financially responsible: Piedmont Natural Gas -Tom Morris, Project Manager Address: 4720 Piedmont Row Drive, Charlotte, NC 28210 1. Project Location: NC 71, Walluka Pictures: No 2. Weather and soil conditions: Clear Soil Workable 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes 5. Violations: River basin: Lumber Project #: ROBES-2020-014 Initial inspection: No If no, check violations below: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Steve Williams Inspection report: Sent Report 9. Corrective action needed: Title: Project Manager Date given/sent: October 19, 2021 Yes 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Nicholas Mills Others present: Date of inspection: October 13, 2021 Time arriving on site: 10:00 AM Time leaving site: 11:30 AM cc: