Loading...
HomeMy WebLinkAboutNCG080676_DMR_20200623Semi-annual Stormwater uischarge Monitoring Report ECO PY for North Carolina Division of Water Quality General Permit No. NCG080000 Date submitted June 23, 2020 CERTIFICATE OF COVERAGE NO. NCGO80676 SAMPLE COLLECTION YEAR 2020 FACILITY NAME Carrboro Public Works Garage SAMPLE PERIOD 2 Jan -June ❑ July -Dec COUNTY ORANGE RECEIVE or ❑Monthly' (month) PERSON COLLECTING SAMPLES J Frei/ SwSG DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA LABORATORY Pace Analytical Lab Cert. # 12/ 40 JUL 0 6 2020 ❑Zero -flow 2 Water Supply ❑SA Comments on sample collection or analysis: pH measured infield by CENTF.— L riLEg 0 Other WS-V. NSW SwSG (Lab Cert No. 5054) DINR JECTIOPI PLEASE REMEMBER TO SIGN ON THE REVERSE Did this facility perform Vehicle Maintenance Activities using more than 55 gallons of new motor oil per month? ✓ yes _no (if yes, report your analytical results in the table immediately below) Part A: Vehicle Maintenance Areas Monitoring Requirements (If applicable) No discharge this period' Outfall No. Date Sample Collected, mo/dd/yr 00530 00400 00556 Total Suspended Solids, mg/L pH, Standard units Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L New Motor Oil Usage, Annual average gal/mo Benchmark - 50 or 100 see permit Within 6.0-9.0 15 - 001 06/11/20 8.1 6.81 < 5.0 +/-115 005 06/11/20 78.9 7.23 < 5.0 +/-115 Part B: Oil/water Separators and Secondary Containment Areas at Petroleum Bulk Stations and Terminals (if applicable) Outfall No. Date Sample Collected, mo/dd/yr 00556 00530 00400 Non -Polar Oil and Grease/TPH EPA Method 1664 (SGT-HEM), mg/L Total Suspended Solids, mg/L pH, Standard units Permit Limit 15 50 or 100 see permit 6.0-9.0 For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here. SWU-250 last revised April 1 I, 2013 Page 1 of 2 STORM EVJT CHARACTERISTICS: Date 06/11/20 (first event sampled) Total Event Precipitation (inches): 0.56" Date (list each additional event sampled this reporting period, and rainfall amount) Total Event Precipitation (inches): Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: • A BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. SEE PERMIT PART II SECTION B. • 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER ATTHE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. SEE PERMIT PART II SECTION B. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDENCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES 0 NO ❑ IF YES, HAVE YOU CONTACTED THE DWQ REGIONAL OFFICE? YES 0 NO ❑ REGIONAL OFFICE CONTACT NAME: Mail an original and one copy of this DMR including all "No Discharge" reports within 30 days of receipt of the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: NCDEQ/ Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." f, �, zeZ� (Date) Additional copies of this form may be downloaded at: http://portal.ncdenr.org/web/wq/ws/su/npdessw#tab-4 SWU-250 last revised April 11, 2013 Page 2 of 2