HomeMy WebLinkAbout20210046 Ver 1_Site inspection_Oct_20211021 Wetland Inspection Report
Project Num: 20210046 Version: 1 Status: Issued
Project Name: NCDOT-Replace Bridge 355 on Hartzog Ford Road Project Type: Replace bridge with bridge
County: Ashe (B-5825)
Region: Winston-Salem
Location: NCDOT-Replace Bridize 355 on Hartzog Ford Road(B-5825)
Latitude: +360 19' 01" Longitude: -81'25'23"
SW Plan Location:
Site Owner Name: NC DOT Division 11
Inspection Date: 10/10/2021
Reason for Inspection: Routine
Inspection Type: Site Inspection(DOT)
Inspection Contact Person: Title: Phone:
On-Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit(401 WQC)
Inspection Summary:
page 1
Site Number: 20210046 Owner: Pettviohn,Michael A.
Inspection Date: 10/10/2021 Inspection Type: Site Inspection(DOT) Reason for Visit: Routine
Permit(401 WOO Yes No NA NE
Does the impact(s)match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? 0 ❑ ❑ ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: DOT staff Jim Holloway was present to review bridge construction site. Culvert was installed per the
plans alongwith rap. New bents were under construction. Temp causeway was being removed and
rebuilt on opposite side of stream. Some turbidity was noted. DOT agreed that a turbidity curtain woulc
be installed ASAP to control turbidity during causeway construction and demolition and old bent remov,
Will follow-up next week.
page 2