Loading...
HomeMy WebLinkAboutNCG050421_CEI_20211021a i A ROY COOPER Governor' ELIZABETHS. BISER Secretary, ionµ BRIAN WRENN NORTH CAROLINA Director Environmental Quality October 21, 2021 Quickie Manufacturing Corporation Attn: Lawrence T. Rohr, Senior Plant Manager 2880 Kenny Biggs Road Lumberton, NC 28358 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater General Permit NCGO50000 Quickie Manufacturing Corporation Quickie Manufacturing, Certificate of Coverage NCGO50421 Robeson County Dear Mr. Rohr: On October 19, 2021, a site inspection was conducted for the Quickie Manufacturing facility located at 2880 Kenny Biggs Road, Lumberton, Robeson County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Ms. Robin Kuhl, Safety Leader, and Mr. James Randy Hunt, Facility Coordinator, were also present during the inspection` and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG050000 under Certificate of Coverage NCG050421. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Gum Branch Canal, class C;Sw' waters in the Lumber River Basin. As a result of the inspection, the facility was found to be compliant with the conditions of the NCG050000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to ' a civil penalty assessment of up to $26,000 per day for each violation. If you or your staff have any questions, comments, or needs assistance with understanding any aspect of your permit, please contact me at (910) 433-3394 or via e-mail at mike.lawyer@ncdenr.gov. Sincerely, eichaelwyer, CPSWQ Environmental Program Consultant Division of Energy, Mineral and Land Resources Enclosure: Compliance Inspection Report ec: Lawrence T. Rohr, Senior Plant Manager — Quickie Manufacturing Corporation Robin Kuhl, Safety Leader — Quickie Manufacturing Corporation James Randy Hunt, Facility Coordinator -Quickie Manufacturing. Corporation Clorissa Rose, Senior EHS Manager — Quickie Manufacturing Corporation Kristen Rivera, Senior Manager Corporate Environmental — Quickie Manufacturing Corporation DEMLR NPDES Stormwater Permit Laserfiche File cc: FRO — DEMLR, Stormwater Files North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources E_ Fayetteville Regional Office 1225 Green Street. Suite 714 i Fayetteville, North Carolina 28301 NOW oeia�mjemcrem�ronmemsi lWaf�iy 9t0.433.3300 Compliance Inspection Report Permit: NCG050421 Effective: 06/01/18 Expiration: 05/31/23 Owner: Quickie Manufacturing Corporation SOC: Effective: Expiration: Facility: Quickie Manufacturing County: Robeson 2880 Kenny Biggs Rd Region: Fayetteville Lumberton NC 28358 Contact Person: Robin Kuhl Title: Safety Leader Phone: 910-737-6500 Ext.1037 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): On -site representative Robin Kuhl 910-737-6500 ext U On -site representative James Randy Hunt 910-737-6500 Related Permits: Inspection Date: 10/19/2021 Entry Time 01:05PM Exit Time: 03:15PM Primary Inspector: Mike Lawyer/ffG Phone: 910-433-3394 Secondary Inspector(s): Reason for Inspection: Follow-up Inspection Type: Compliance Evaluation Permit Inspection Type: Apparel/Printing/Paper/Leather/Rubber Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG050421 Owner - Facility: Quickie Manufacturing Corporation Inspection Date: 10/19/2021 Inspection Type: Compliance Evaluation Reason for Visit: Follow-up Inspection Summary: Inspection conducted as a follow-up to the previous inspection conducted on November 5, 2019, which resulted in the issuance of a Notice of Violation for failure to conduct and record semi-annual Qualitative Monitoring per the conditions of the NCGO50000 Stormwater General Permit. Reviewed the facility's Stormwater Pollution Prevention Plan (SPPP), which contains all permit -required components as well as documentation associated with an annual review/update, annual employee training, annual non-stormwater evaluation, monthly facility inspections and a listing of any spills or lack thereof. Since the previous inspection, Qualitative Monitoring has been conducted and recorded for the first and second half of 2020 as well as the first half of 2021. Monitoring records indicate three stormwater discharge outfalls (SDOs). As discussed during the inspection, the SDO identified as outfall 1 appears to only receive stormwater flow from the employee parking area, which is not associated with industrial activity. Therefore, outfall 1 may be removed from the facility's monitoring schedule. After the records review, observations were made of overall site conditions and the stormwater discharge outfalls. At the time of inspection, facility appeared to be well operated and maintained. Page 2 of 3 Permit: NCGO50421 Owner - Facility: Quickie Manufacturing Corporation Inspection Date: 10/19/2021 Inspection Type : Compliance Evaluation Reason for visit: Follow-up, Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? 0 ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? E. ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? 0 ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ E ❑ # Does the Plan include a BMP summary? N ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? N ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ # Does the facility provide and document Employee Training? E ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? 0 ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Regarding secondary containment facility has no ASTs or other containers of liquid materials located onsite that trigger the secondary containment requirement. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ 0 ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ 0 ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? E ❑ ❑ ❑ # Were all outfalls observed during the inspection? N ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ 0 ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3