Loading...
HomeMy WebLinkAbout20170461 Ver 1_Permit Drawings_showing added bank stabilization_202110210' 01 co c 01 -0 01 0 0 3 E (V (V 01 CO is 0 0 L 01 0 0 0 E c 0 0 w 01 01 W 0 L C N00 Flo �SLC PROJECT REFERENCE NO. SHEET NO. j�//� DENOTES TEMPORARY l7BPJ2.R.49 4 /� IMPACTS IN SURFACE WATER / R/W SHEET NO. NAD 83 NA 2011 ROADWAY DESIGN HYDRAULICS SURFACE WATER TS IN ENGINEER ENGINEER O O CARL THOMPSON 1 CLASS II RIP RAP NANCY M. VANSTORY LIVING TRUST (STRUCTURE PAY ITEM) CULTIVATED CULTIVATED FIELD CLASS II RIP RAP FIELD SEE DETAIL El CLASS II RIP RAP PAY ITEM) -' DOCUMENT NOT CONSIDERED UNLESS ALL SIGNATURES FINAL COMPLETED (STRUCTURE �G \ 5 ../s, _ LP O 4"R �GENE VANSTORY �� ♦ �/ I5 x MM // Phone:598 st Chatham 19.297 M A Engineering Consultants, 022peet Suite 137 Inc. Cary, Fax: NC License: F-0160 NC 27511 919.297.0221 BM#I W 800DS 1S W S 19°03'0711 W ✓s 1S 211.01' FROM --_ _ ----- GPS 212-1 EXISTING R/W F ,.•1'•'�tia: °,•c,, 'o oO° - ��_ :��l` ;o�.�°� • __ __ — — — — — — — F EXISTING ELEV=822.79 0.64 ° ° °° ° .i. • 'n°°°°, R/W PERMIT D R � V \WIN G MILES +i°�°°°°°°' TO ° �°� °°° N ^^ SR 1890 TOMLIN MILL � � ° 0.11 MILES RD. o' o°o °oo• , • o`o"; � � °oo °o b o° � \ ''" ,o,0• xx>ba o °= , BDI 20' PAVED ROADWAY --I 71— TO SR 1953 RAIDER ROAD SHEET 2 OF 4 'a°0000°o° °�°o• BDI SR 1892 JENNINGS ROAD ;�°o� T \ T _ _\ T T o' o 00 ° ° •' oo' o .. •°oo°o' T � oo• � ' •o°o EXISTING R/W F\� AMA_ 000000�00 — -�— EXISTING R/W — _—oo°a°; R F W E BA\K STAB LIZATIO\ E = (SI I) CULTIVATED FIELD EXCAVATION (SEE STRUCTURE PLANS) � ��v P RAP AT MBANKMENT SEE DETAIL ER1 QP / RIB (S T RAPD AT 1 2) _ =VBA\KV=\T CULTIVATED FIELD _ DECK DRAINS REQUIRED 5 @ 8"x6" OPENINGS IN BRIDGE -L- 13+81 LT & RT -L- 13+95 & RT -L- 14+08 LT & RT -L- 14 + 68 LT & RT —L— 14+85 LT & RT O 4 DETAIL DI DETAIL El DETAIL ER1 TERRY C. LYNN C. MILLER & ROBERT W. CHERYL P. ROBERTSON & LATERAL 'V' DITCH (Not to Scale) b RIP RAP AT CHANNEL EMBANKMENT (Not to Scale) RIP RAP AT EMBANKMENT (Not to Scale) 10'min. Natural I �- — Fill ,� 2' TYP. ,. ''�;.�� Ditch ---..1.0'min� •' �:•'2.0 Ground 2•� .yX 1"/Ft. Slope '`sl. ��;.,•%" Grade 1� � J '�.4 Geotextile Min. D= 1 Ft. b= 2 Ft. *1.5:1 max. or as directed by Engineer Type of Liner= 110 TONS CL II Rip -Rap; 120 SY Geotextile (SOUTH BANK) GEOTEXTILE Type Liner=CL II Rip TONS II Rip 35 TONS CL II Rip -Rap; 39 SY Geotextile (NORTH BANK) of -Rap SAY 8 CL -Rap FROM -L- STA. 14+53 TO STA. 16+25 RT SAY 9 SY Geotextile FROM -L- STA. 14+10 TO STA. 14+37 (SOUTH BANK) FROM -L- STA.14+47 TO STA. 14+56 (NORTH BANK) FROM -L- STA. 14+49 TO STA. 14+56 RT BM RAILROAD S 21° #1 SPIKE SET IN 18" PINE 01' 43.1" W 156.02' FROM -L- STA. 10+00.00 , • • • • • • • : ► • : ' : I BRIDGE HYDRAULIC DATA EL.822.79' :' DESIGN DISCHARGE = 3300 CFS II: DESIGN FREQUENCY = 25 YRS ;:. DESIGN HW ELEVATION = 8/2A FT BASE DISCHARGE = 4600 CFS BASE FREQUENCY = 100 YRS BASE HW ELEVATION = 8/3.2/ FT OVERTOPPING DISCHARGE = 11500 CFS B GIN GRADE END GRADE ' OVERTOPPING FREQUENCY= 500+ YRS -� - STA: l2 #5©A4 I r .... .. i .... E, SITA.15I+75.Ud .. . OVERTOPPING ELEVATION = 8/8.7 FT , = . EL. :;: 8/8.88' ;:;: EL VC PI = 13+25.00 = = 8/9.04' l00' El. ;:;: . " BI&.25' ;:;: " :. DATE OF SURVEY = MAY 20/4 K V = 189 = 60 mph ------------------ W.S.ELEVATION AT DATE OF SURVEY = 800.8 FT --�--,-,-- -�------- ---------- ---------- -- -- ------ ----,--,---,-; -; -,-- ,. ,- -,- -, --, --,- ,- -, ,- ,- - - �- .%, - EXCAVAT ION (SEEPLANS) ANS1 820 P1-: , i:.m e .31 / I I 820 . .. ...: ,, ,,, ,,,, ,,,, ,,,, ,,,, , aeo 1; I; 4" 8 810 4. •- 800 ;;;; ;;;; ;;;; ;;;; ;; ;;;; ;;;; ;;;; ;;;; ;;;; ;;;; ;;;; ;;;; ;;;; ;;;; ;,,, ;;;I$T/ �►R Erg©:e�:RMO/D) �' I —. ... 800 . , . , . , , . , , . , . .. , , , _ STA.. -+ 2 R -. 790 .. ... . . 7 790 rG-- STA; 1:4.f53:-RT: - :_ :_ 12 13 14 15 16 17