Loading...
HomeMy WebLinkAbout20060853 Ver 1_Certification of Completion_20070713Certification of Completion g~ "5 / ~'~~~'~~ p~o~ect No.: (~~ ~ $~~ County: ~ C ~~© ~ ~~~~~-- =~~~::oant: /VIS. Iti ATtC I~EL>G-. C~stZ-Av'tT 1 -~e;,ttiame: IM1~1yQ t..~KE 5~%3D1~/t51o _~_~ ~.= rs_ua_nce of Wetland Permit: Certificate of Completion r '~ per. completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and a.: . s~~secuent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carol:::. ~,~.:;inn of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form maybe returned to DWQ _ C appcant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all , - ese -lpplicant's Certification K ~ T ~ E N~/a1... ~~ Ault i T F ,hereby state that, to the best of my abilities, due care and diligence ~~ :~ _~c ~~ the observation of the construction such that the construction was observed to be built within substant~::. .. ~r_n!~ance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specificaror~. a~.d other supporting materials. :?-:an:re: ~~ ~-~i-,,rrT~ Date: '7 - ~.~ D -igenr's Certification 1, hereby state that, to the best of my abilities, due care and diligence way ~~sed in the observation of the construction such that the construction was observed to be built within substantial ~ompltance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, ~~c other supporting materials. ~:-Tar'.~re Date: If This project was designed by a Certified Professional `- as a duly registered Professional (i.e., Engineer, _"escape .~rcllitect, Surveyor, etc.) in the State of North Carolina, ha~ring been authorized to observe (periodically, .~ ee'~ly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care ~.e daigence was used in the observation of the construction such that -the construction was observed to be built within s.:~s~antial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. `_ _.!rC Registration No. Q~~~o~~~ JUL 1 3 2007 Date UEh1R -WATER QUALITY 1NETLAND3 AND STO',2~MIATER BRANCH