Loading...
HomeMy WebLinkAboutNCC201835_NOT Closeout Documents_20211019North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 Annexation Phase V, Construction County: Cumberland Project: Project VIII, Area 24A River basin: Cape Fear Person financially responsible: Public Works Commission - Joseph E Glass, PE, Project #: CUNME-2020-118 Engineer Manager NCC201835 Address: P.O. Box 1089/955 Old Wilmington Road, Fayetteville, NC 28302 1. Project Location: Christina Street, Fayetteville Pictures: No 2. Weather and soil conditions: dry, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No one Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: October 14, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the Notice of Termination process. Reported by: Melissa Joyner Others present: Date of inspection: October 13, 2021 Time arriving on site: 2:55 PM Time leaving site: 3:05 PM cc: A. J. Riddle, Sam Canady (via email)