Loading...
HomeMy WebLinkAboutNCC191521_NOT Closeout Documents_20211019ROY COOPER Governor ELIZABETH S. BTSER Secretary ., BRIAN WRENN Director NORTH CAROLINA lrnviranmantal quality Dear Sir or Madam: Attached is a copy of the inspection report which was prepared following an on -site inspection of the subject site. This report is intended to provide you with information concerning the status of the site as it relates to compliance with the North Carolina Sedimentation Pollution Control Act of 1973. Please review this report carefully as it may contain corrective actions needed or comments which will assist you in meeting the required performance standards of the Act. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact the named inspector at the address shown on the inspection report if you have any questions. Sincerely, Land Quality Section Mooresville Regional Office North Carolina Department of Environmental Quaiity I Division of Energy, Mineral and Land Resources Mooresville Regional Office 1 610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115 704-663-1699 North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Mecklenburg Project: K8 North River basin: Catawba Person financially responsible: Charlotte Mecklenburg Board of Education - Gary Project #• MECKL-2019-062 S Adams, Director of Architecture Address: 330I Stafford Drive, PO Box 30035, Charlotte, NC 28208 1. Project Location: Hambright Road, Huntersville Pictures: No 2. Weather and soil conditions: Cloudy, Workable Soils Initial inspection: No 3. Is site currently under notice of violation? No 4, is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): No One Onsite Title: Inspection report: Sent Report Date given/sent: October 08, 2021 9. Corrective action needed: 10. Comments: Overall the site has sufficient permanent ground cover to restrain erosion, however there are some bare areas that should be monitored for stabilization. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO 1) must be requested by the permittee via a Notice of Termination (NOT) unless permit approval date was prior to April 1 st 2019. The NOT is available at: https:Iledocs.deq.nc;gov/Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by. Jeffrey Chandler Date of inspection: October 05, 2021 cc: Yes Others present: Time arriving on site: 11:45 AM Time leaving site: 12:10 PM