HomeMy WebLinkAbout20110037 Ver 2_Certificate of Completion_20210202ROY COOPER
Governor
MICHAELS, BEGAN
secretary
S, DANIEL SMITH'
Director
NCRTKCAROLINA ,
Enyironmerstal:Qualit�
WR Project No.: DW R "11-0037� County: I ttcpow¢ 4 l
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification: Tit � L' 3 z 20z0
Certificate of Completion
RECEIVEMCDENWR
FEB 0 2 2021
Non -Discharge
Permitting Unit
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer
Rules, and any subsequent modifications, the applicant is required to return this certificate.to the 401 and
Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh,
NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or
the project engineer. It is not necessary to send certificates from all of these.
Applicant's Certification
I, —r. M. wr , hereby state that, to the best of my abilities, due care and
diligence was used Y the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and
diligence was used in the observation of the construction such that the construction was observed to be built
within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the
approved plans and specifications, and other supporting materials.
Signature:
If this project was designed by a Certified Professional
I, , as a duly registered Professional (i.e.,
Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to
observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to
the best of my abilities, due care and diligence was used in the observation of the construction such that the
construction was observed to be built within substantial compliance and intent of the 401 Water Quality
Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature:
Date
Registration No.
North Carolina Department of Environmental Quality I Divlslon of Water Resources
Asheville Regional Office 1.209011S,.Hlghsvay701 Swanhanoallorth.CamRna28778
ene °Lri:emnaewm 428�290,45oc,
RECEIVED/NGDEOIDWR
JAN 2 92021
Water Qi wity.
PermittingSection',.