Loading...
HomeMy WebLinkAbout20110037 Ver 2_Certificate of Completion_20210202ROY COOPER Governor MICHAELS, BEGAN secretary S, DANIEL SMITH' Director NCRTKCAROLINA , Enyironmerstal:Qualit� WR Project No.: DW R "11-0037� County: I ttcpow¢ 4 l Applicant: Project Name: Date of Issuance of 401 Water Quality Certification: Tit � L' 3 z 20z0 Certificate of Completion RECEIVEMCDENWR FEB 0 2 2021 Non -Discharge Permitting Unit Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate.to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, —r. M. wr , hereby state that, to the best of my abilities, due care and diligence was used Y the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date Registration No. North Carolina Department of Environmental Quality I Divlslon of Water Resources Asheville Regional Office 1.209011S,.Hlghsvay701 Swanhanoallorth.CamRna28778 ene °Lri:emnaewm 428�290,45oc, RECEIVED/NGDEOIDWR JAN 2 92021 Water Qi wity. PermittingSection',.