Loading...
HomeMy WebLinkAbout20200335 Ver 1_Certificate of Completion_20200727ROY COOPER Governor MICHAELS.REGAN Secretary S. DANIEL SMITH Director NORTH CAROLINA Environmental Quality WRProject No.:'p' 0335 County: cGldwG/I Applicant: _fv rr, n S>o r or t . -0,110 %1 Project Name: Sr•d,'174T,'orf-138l/,.wo.t�G, Date of Issuance of 401 Water Quality Certification: A—;�Y Certificate of Completion RECEIVED JUL 2 7 2020 WDEWWRINMES ' 1� Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, .ivsr,:t X7 rc hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plansatld specific�tigns, and other supporting materials. Signature: Date: %-17"7-OXO Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: If this project was designed by a Certified Professional I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date Registration No. _�� North Carolina Department of Environmental Quality I Division of Water Resources DFQ Asheville Regional Office 12090 US. Highway 70 1 Swannanoa, North Carolina 28778 828296A500