Loading...
HomeMy WebLinkAboutWQCS00092_Capital Inprovement Plan_20211013Walter M. Gardner, Jr. — Mayor Robert F. Davie, Jr. —Town Administrator f/ I•tCR 7H t: A x7011 1111A P.O. Box 281 Warrenton, NC 27589-0281 (252) 257-1122 Fax (252) 257-9219 www.warrenton.nc.gov Town of Warrenton Sewer Collection System Capital Improvement Plan FY 2021/2022 - FY 2026/2027 The Town of Warrenton operates a wastewater collection system that serves approximately 850 town customers. A portion of the collection system is also utilized to transport the wastewater from the collection systems of Warren County and the Town of Norlina to the Town's wastewater treatment plant. The operation and maintenance of the collection system is regulated by Permit No. WQCS00092 issued by the Department of Environmental Quality. The collection system is composed of approximately 21 miles of various sizes of gravity sewer lines and eight miles of force mains. There are four duplex pump stations in operation. PURPOSE AND DEFINITIONS: The purpose of the capital improvement plan (CIP) is to forecast and match projected revenues and major capital needs over a five-year period. Capital planning is an important management tool that strengthens the linkages between community infrastructure needs and the financial capacity of the Town. The Town defines CIP capital expenditures as any expenditure of major value that recurs irregularly, results in the acquisition of a fixed asset, and has a useful life greater than one (1) year. As a rule of thumb, items included in the CIP include those which: • Involve acquisition, renovation, and/or construction of a single fixed asset greater than $2,500. • Involve any land purchases greater than $50,000 not associated with or included in another CIP project. CAPITAL IMPROVEMENT PLAN DEVELOPMENT: The CIP is updated annually as part of the Town's regular budget process. Projects are reviewed and evaluated based on Manager and Board of Commissioners' service desires, other Town infrastructure needs, the financial capacity of the Town and the impact the projects will create on the Town's operating budget. Once the projects are evaluated, a recommended CIP is developed that identifies the selection and timing of capital projects into future fiscal years. First -year projects are incorporated into the Manager's recommended annual operating budget. The Mayor and Board of Commissioners are also presented the future, unappropriated planning years for their consideration, review and endorsement so staff can proceed with planning and evaluation of potential capital projects. CAPITAL IMPROVEMENT PLAN: The capital improvement plan is simply that -- a plan. As such, projects are subject to change based on new or shifting service needs, special financing opportunities, emergency needs, or other directives or priorities established by the Manager or Board of Commissioners. Because priorities can change, projects included in outward planning years are not guaranteed for funding. The Town of Warrenton's CIP achieves five major objectives as a component of the Town's budget and financial planning process: 1. Helps the Town rationally and intelligently plan for the repair, replacement, and acquisition of capital items that are necessary in providing high quality services to the citizens of Warrenton. 2. Assists in fiscal planning by forecasting capital demands together with future revenues and expenditures (as part of the financial plan). 3. Insuring better coordination, evaluation, and planning of projects to serve the community and its' needs. 4. The CIP, together with the Financial Plan, serves as a guide to decision -making for the Board, Manager and employees. 5. The systematic and comprehensive analysis of capital needs increases the probability of making rational (and correct) budgetary judgments since improvements are identified, prioritized, and matched to the projected fiscal resources of the Town. CIP Projects - Summary F & M Lift Station — This lift station has two pumps, each capable of pumping 80 gpm. The pumps have to be in good working condition to provide continuous sewer service to the customers and to prevent sanitary sewer overflows. This project will provide rehabilitation/repair of the pumps and appurtenances to maintain the lift station in reliable working condition. RigQans Lift Station — This lift station has two pumps, each capable of pumping 260 gpm. As this is a major pump station, it is essential that the pumps are reliable and pumping at their peak capacity. This project will replace one of the pumps and provide the needed replacement parts (impeller) for future needs. Service Trucks — The Utility Department has a staff of five and five service trucks. The current policy for truck replacement is to purchase a new service truck every three years. The Utility Department is responsible for checking the collection system daily, responding to emergencies and performing all maintenance and repairs. Reliable transportation is essential for the continued successful operation of the collection system. One of trucks to be replaced had in excess of $3000 in repairs in the past year. Red Hill Loop Lift Station Electrical Panel — A large percentage of pump station failures are due to electrical causes. The Red Hill PS control panel is corroded due to water intrusion into the panel along with hydrogen sulfide gas. Control panel replacement and upgrade will reduceleliminate the possibility of pump station failure due to electrical causes. Warrenton -Ridgeway Rd Lift Station Electrical Panel — A large percentage of pump station failures are due to electrical causes. The Red Hill PS control panel is corroded due to water intrusion into the panel along with hydrogen sulfide gas. Control panel replacement and upgrade will reduce/eliminate the possibility of pump station failure due to electrical causes. F & M Lift Station Bypass Piping — A mechanical or electrical failure of the lift station would cause a major sanitary sewer overflow and disrupt sewer service to large number of customers. This project would install piping and valves that would a allow a portable pump to be connected to the Lift Station to provide uninterrupted operation during a pump or electrical failure. Sewer Camera — A sewer camera would allow internal inspection of main line sewers and laterals. The inspection would helpful in identifying the root cause of blockages, locating lost taps, determining pipe condition, etc. The visual inspection would eliminate unnecessary digging and guessing when responding to blockages and other problems. Backhoe — A backhoe is essential in maintaining the proper operation of the collection system. It is used for excavating pipelines, moving materials such as pipe, valves, rock, etc. Parts for the current backhoe are difficult to obtain. Tractor — A primary use of the tractor would be to mow and maintain the sewer right-of-ways. The State issued Collection System Operation and Maintenance permit requires the town to maintain the right-of-ways so that they are accessible to equipment and personnel. Failure to properly maintain the right-of-ways would be a permit violation and could result in penalties from the state. Sewer Jetter — The sewer jetter is used to clear line blockages and to clean sewer lines to prevent blockages. It is also a condition of the Collection System permit that the town mechanically clean 10% of the gravity sewer lines each year for a total of 11,088 feet per year. Capital Improvement Plan (CIP) Summary Project Primary Capital FY FY FY FY FY Funding Cost 21122 22123 23124 24125 25126 Source F&M LS Loans & $25,000.00 $25,000.00 Rehabilitation Grants Riggans LS Loans Pump and $30,000.00 $30,000.00 Replacement Grants Red Hill Loop Operating PS Electrical Revenue $15,000.00 $15,000.00 Panel Warrenton - Ridgeway Operating Rd. LS Revenue $15,000.00 $15,000.00 Electrical Panel Two — Loans & Service Operating $93,557.00 $93,557.00 Trucks Revenue F&M LS Operating Bypass Revenue $15,000.00 $15,000.00 Pump Piping Sewer .Operating $16,000.00 ` $16,000.00 Camera Revenue Loans Backhoe and $105,202.00 $105,202.00 Grants Loans Tractor and $55,220.00 ` $55,220.00 Grants Loans Sewer Jetter and $32,000.00 $32,000.00 Revenue TOTAL $401,979.00 $55,000.00 $154,557.00 $105,202.00 $55,220.00 $32,000.00 Approved October 11, 2021 by the Board of Commissioners of the Town of Warrenton by a vote of L_ (aye) to --- -L� (nay). Mayor Walter M. Gardner, Jr.