HomeMy WebLinkAboutNCG210290_DMR_20201029Semi-annual Stormwater Discharee Monitoring; Report
for North Carolina DEMLR General Permit No. NCG210000
Date submitted I0-Xa-2o
CERTIFICATE OF COVERAGE NO. NCG21Q L 01 (�
FACILITY NAME 3EQQt (,. UJ:\\:t►,nS a 4�a�
COUNTY -161A a
PERSON COLLECTING SAMPLES Kevtn W;%Z %
LABORATORY ?A(.*- Lab Cert. #
Comments on sample collection or analysis:
SAMPLE COLLECTION YEAR ZOT.n
SAMPLE PERIOD ❑ Jan -June [July -Dec
or ❑ Monthly)_ (month)
DISCHARGING TO CLASS ❑ORW ❑HQW [-]Trout ❑PNA
❑Zero -flow ❑Watersupply []SA
❑Other
P'OV 0 $ 20Z0
Part A: Stormwater Benchmarks and Monitoring Results (Monitoring is required onlyifthe facility stores exposed accumulations of sawdust, wood chips,
bark, mulch, or other similar material on site for longer than seven (7) days.)
No discharge this period?'
Outfall No.
Date Sample
Collectedt
(mo/dd/yr)
24-hour rainfall
amount,
Inches;
chemical Oxygen Demand
Total Suspended Solids
Benchmarks
120 mg/L
100 mg/L or 50 mg/L
'Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall.
' For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a checkmark here.
'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge requirement.
° See General Permit text, Table 3, identifying the especially sensitive receiving water classifications where the more protective benchmark applies.
Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non -
numerical format. When results are below the applicable limits, they must be reported in the format. "<XX m¢/L". where XX is the numerical value of the
detection limit, reporting limit, etc. in mg/L.
Note: !f you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text.
Permit Date: 8/1/2013-7/31/2018 SWU-245, last revised 7/31/2013
Page 1 of 2
�,,�.WA RECEIVE[
NCDENR NOV 0 8 2020
Stormwater Discharge Outfall (SDO)�EN RAL FILES
Qualitative Monitoring Report DWR SECTION
Forguidanceonfiltingout thfsjorm,please vWt.- tlltp•//portalncdem-.org/web/h•/nodes-stgrmwater/
Permit No.: or Certificate of Coverage No.:
Facility Name: 2U u „%X ,PLA$ k LAWS -WL.-
County: -Ti+H. o+t Phone No. alm - MA_ylcr
Inspector: ti ' u;%1V&AS
Date of Inspection: 1b-i4-'LQ
Time of Inspection: %,.00 A,A
Total Event Precipitation (inches): 011
Was this a "Representative Storm Event" or "Measureable Storm Event" as defined by the permit?
(See information below.)
Q(Yes ❑ No
Please verify whether Qualitative Monitoring must be performed during a "representative storm
event" or'measureable storm event" (requirements vary, depending on the permit).
Qualitative monitoring requirements vary. Most permits require qualitative monitoring to be
performed during a "representative storm event" or during a "measureable storm event" However,
some permits do not have this requirement Please refer to these definitions, if applicable.
A "representative storm event" is a storm event that measures greater than 0.1 inches of rainfall
and that is preceded by at least 72 hours (3 days) in which no storm event measuring greater than `
0.1 inches has occurred. A single storm event may contain up to 10 consecutive hours of no
precipitation
A "measurable storm event' is a storm event that results in an actual discharge from the
permitted site outfall. The previous measurable storm event must have been at least 72 hours
prior. The 72-hour storm interval does not apply if the permittee is able to document that a shorter
interval is representative for local storm events during the sampling period, and the permittee
obtains approval from the local DWQ Regional Office_ _
By this signature, I certify that this report is accurate and complete to the best of my knowledge:
_ -z- &- Ui ,-
(Signature of Permittee or Designee)
Page 1 of 2
SWU-242, Last modified 10/25/2012
1. OutfaR Description:
Outfall No. M-11 Structure (pipe, ditch, etc.) WST S1t_ L t8�l %dd&
Receiving Stream: eau ssr.-. V--� J-e
Describe the industrial activities that occur within the outfall drainage area: tiAA WwM a
Z. Color: Describe the color of the discharge using basic colors (red, brown, blue, etc.) and tint
(light, medium, dark) as descriptors: _ iggi,3iS &baj_I c. , M
3. Odor; Describe any distinct odors that the discharge may have (i.e., smells strongly of oil,
weak chlorine odor, etc.): f
4. Clarity: Choose the number which best describes the clarity of the discharge, where 1 is
clear and 5 is very cloudy:
1 2 3 4 5
S. Floating Solids: Choose the number which best describes the amount of floating solids in
the stormwater discharge, where 1 is no solids and 5 is the surface covered with floating solids:
1 G 3 4 5'
6. Suspended Solids: Choose the number which best describes the amount of suspended
solids in the stormwater discharge, where 1 is no solids and 5 is extremely muddy:
1 (2) 3 4 5
7. Is there any foam in the stormwater discharge? Yes oNo
a. Is there an oil sheen in the stormwater discharge? Yes No
9. Is there evidence of erosion or deposition at the outfall? Yes ON
10. Other Obvious Indicators of Stormwater Pollution:
List and describe
P00f.
Ai..s... i ..... w'....«s.. i.i..i.....i:.i.. .....i /..« �-i... �«..ngrn.. i+.ir fn.sws �ii e�i�Ae�s �r esrncinn /�i��s���f�i�►s�
.. V.�V• YV.• V.M�w.�•, .���Y .IV��rV, r.MMf V� M.V Vr AIM V��YV V� /. V.Y., �� V..V V..�, V V� M.V��I w �VV.r�V ��
may be indicative of pollutant exposure. These conditions warrant further investigation.
SIVII-242. Last modified 10/25/2012