Loading...
HomeMy WebLinkAbout20200636 Ver 1_Certificate of Completion_20201116ROY COOPER Governor MICHAEL S. REGAN Secretary S. DI IEG SMITH Dim r NORTH CAROWNA Env_7ronmental Quality WR Project No.: ? n_ 0 (oCounty: Q)Lx 1Le Applicant: `)r-o C.e_ T M ec,- L, W e— Project Name: r N� �F� — 8`i SUtrtdLA Gen l�v- de, w-e-S Date of Issuance of 401 Water Quality Certification: -, U h P -7 ,b Z.O Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 and Buffer Permitting Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, 12�,t" (� e e. F. 1"l 0 %-Jej!P , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of Water Quality Certification and Buffer Rules, the approved plans and specifications, r p orting materials. Agent's Certification I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, , as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permitee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date Registration No. RECEIVE® Nov 16 2020 D Q North. Carolina Department ofEnvironmental Quality j Division of Wa1N@M/D V Y f V NP D ES Asheville Regional Office 12090 U.S, Hlghway 70 1 Swannanoa, North.Carolina 28778 828. 96.4500