HomeMy WebLinkAbout20211520 Ver 1_Sketch_20211020ake
At Full PondlNormaf Water i eves)
Full Pond/
orm aamMw
en ��XfS"�inf�
ShOrebe -
,
A _
r
CLAN�-S
Please approximately sketch the fo€lowing information on this plan x
!r �IYtF such GS �(J fi x too P (provide dimensionsforeach
•! • Alf proposed vegetation clearing
. Location of rip rap or filf to be placed above the Full Pond/"Normal Water l,eve! e!
�. Location of rap yr rEfl to be placed faelovv the Full Pond/Normal Water Levelelevation
?• Location of any proposed structures such as buildings, "retaining walls, docks, etc.
levatipn
5. Location of any encavation or dredging below the Pull Pond/ Normal Water Level elevation
�. Location of rons�ruction access corridors
FORM: SSCP 10-2073
'age 3 of 3