HomeMy WebLinkAboutNCC202512_ESC Approval (Correct County)_20211015 di ,,,2o oN \
re :
4.1
ROY COOPER i , �,. ..,
Governor ox tit 7,:yo a
Secretory
BRIAN WRENN NORTH CAROLINA
Director
Environmental Quality
July 1, 2020
LETTER OF APPROVAL
Harrisburg Pet Suites, LLC
Attention: Gary D. Cherry, Co-Founder Principal
106 Foster Avenue
Charlotte, North Carolina 28203
RE: Project Name: PetSuites - Harrisburg
Acres Approved: 1.50
Project ID: CABAR-2020-088
County: Cabarrus
City: Harrisburg
Address: Main Street
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Harrisburg Pet Suites, LLC
Date Received by LQS: June 19, 2020
Plan Type: New
Dear Mr. Cherry:
This office has reviewed su
bject subject erosion and sedimentation control plan. We find the plan to be
Y
acceptable with modifications and hereby issue this letter of Approval with Modifications and Performance
-
Reservation Required The Modifications Re -uired for Approval are listed on the attached page. This plan approval
expirethree(3) the date of approval,if no land-disturbing activity has been undertaken,
shall yearsfollowing
as is required by Title 15A NCAC 4B .0129.
As of March 1, 2019,
all new construction activities are required to complete and submit an electronic
Intent (NOT) form requesting uesting a Certificate of Coverage (COC) under the NCGO 10000
Notice of (N ) q
Construction
Stormwater General Permit. This form MUST be submitted prior to the commencement of
any land
disturbing
activityon the above named project. The NOI form may be accessed at
.nc.g
de ov/NCG01. Please direct questions about the NOI form to Annette Lucas at
q
lucas ncdenr. ov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and
Annette. @ g correct NOI For
m, a COC will be emailed to you within three business days. Initially, DEMLR will not
charge
a fee for coverage under the NCGO 1 permit. However, on or after May 1, 2019, a $100 fee will be
charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh.
and the NCGO1 permit require that the following documentation be kept on
Title 15A NCAC 4B .0118(a)
file at the job site:
— — ----"A,,, North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources
Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville.North Carolina 28115
NORTH CAROLINA .wr. ,./` -,... f<- ,e n"
Letter of Approval with Modification
Harrisburg Pet Suites, LLC
July 1, 2020
Page2of2
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter givesrequiredby the notice G.S. 113A-61.1(a) of our right of periodic inspection to insure
compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation
Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require
revisions to the plan and implementation of the revisions to insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
P pp
qualitylaws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land-disturbing activity. This approval does not supersede any other permit or approval.
this approval is based inpart on the accuracyof the information provided in the Financial
Please note that pp
Responsibility Form, which you provided. You are requested to file an amended form if there is any change
p ty
in the information included on the form. In addition, it would be helpful if you notify this office of the
proposed startingdate for this project. Please notify us if you plan to have a preconstruction conference.
p
Your cooperation is appreciated.
Since !" ,
6e'
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval and Performance Reservations
NCGO1 Fact Sheet
c: Oak Engineering
Attention: Luke J. Bugenske. PE
4929 Monroe Road
Charlotte, North Carolina 28205
Inspection Department