Loading...
HomeMy WebLinkAboutNCC202512_ESC Approval (Correct County)_20211015 di ,,,2o oN \ re : 4.1 ROY COOPER i , �,. .., Governor ox tit 7,:yo a Secretory BRIAN WRENN NORTH CAROLINA Director Environmental Quality July 1, 2020 LETTER OF APPROVAL Harrisburg Pet Suites, LLC Attention: Gary D. Cherry, Co-Founder Principal 106 Foster Avenue Charlotte, North Carolina 28203 RE: Project Name: PetSuites - Harrisburg Acres Approved: 1.50 Project ID: CABAR-2020-088 County: Cabarrus City: Harrisburg Address: Main Street River Basin: Yadkin-PeeDee Stream Classification: Other Submitted By: Harrisburg Pet Suites, LLC Date Received by LQS: June 19, 2020 Plan Type: New Dear Mr. Cherry: This office has reviewed su bject subject erosion and sedimentation control plan. We find the plan to be Y acceptable with modifications and hereby issue this letter of Approval with Modifications and Performance - Reservation Required The Modifications Re -uired for Approval are listed on the attached page. This plan approval expirethree(3) the date of approval,if no land-disturbing activity has been undertaken, shall yearsfollowing as is required by Title 15A NCAC 4B .0129. As of March 1, 2019, all new construction activities are required to complete and submit an electronic Intent (NOT) form requesting uesting a Certificate of Coverage (COC) under the NCGO 10000 Notice of (N ) q Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activityon the above named project. The NOI form may be accessed at .nc.g de ov/NCG01. Please direct questions about the NOI form to Annette Lucas at q lucas ncdenr. ov or Paul Clark at Paul.clark@ncdenr.gov. After you submit a complete and Annette. @ g correct NOI For m, a COC will be emailed to you within three business days. Initially, DEMLR will not charge a fee for coverage under the NCGO 1 permit. However, on or after May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central Office staff in Raleigh. and the NCGO1 permit require that the following documentation be kept on Title 15A NCAC 4B .0118(a) file at the job site: — — ----"A,,, North Carolina Department of Environmental Quality I Division of Energy.Mineral and Land Resources Mooresville Regional Office 1610 East Center Avenue,Suite 301 I Mooresville.North Carolina 28115 NORTH CAROLINA .wr. ,./` -,... f<- ,e n" Letter of Approval with Modification Harrisburg Pet Suites, LLC July 1, 2020 Page2of2 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter givesrequiredby the notice G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water P pp qualitylaws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. this approval is based inpart on the accuracyof the information provided in the Financial Please note that pp Responsibility Form, which you provided. You are requested to file an amended form if there is any change p ty in the information included on the form. In addition, it would be helpful if you notify this office of the proposed startingdate for this project. Please notify us if you plan to have a preconstruction conference. p Your cooperation is appreciated. Since !" , 6e' Christopher Graybeal Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval Modifications Required for Approval and Performance Reservations NCGO1 Fact Sheet c: Oak Engineering Attention: Luke J. Bugenske. PE 4929 Monroe Road Charlotte, North Carolina 28205 Inspection Department