Loading...
HomeMy WebLinkAbout20130918 All Versions_Application_20130930WETLAND PERMIT IMPACT SUMMARY WETLAND IMPACTS SURFACE WATER IMPACTS Site No. Station (From /To) Structure Size / Type Permanent Fill In Wetlands (ac) Temp. Fill In Wetlands (ac) Excavation in Wetlands (ac) Mechanized Clearing in Wetlands (ac) Hand Clearing in Wetlands (ac) Permanent SW impacts (ac) Temp. SW impacts (ac) Existing Channel Impacts Permanent (ft) Existing Channel Impacts Temp. (ft) Natural Stream Design (ft) 8A 33 +23 -EY4- <0.01 9 95 +78 -L- (LT) TO 15" RCP 2.07 0.15 0.03 <0.01 462 10 102 +77 - L -(RT) 9A 101 +78 -L- (LT) TO 42" RCP <0.01 84 102 +19 - L -(LT) 10 113 +64 -L- (LT) TO 2 @ 7'X 8' RCBC <0.01 0.03 <0.01 212 29 117 +08 - L -(RT) Bank Stabilization 97 10A 114 +23 -L- (RT) TO 0.02 0.02 115 +15 - L -(RT) 10B 115 +19 -L- (LT) TO 0.03 <0.01 <0.01 116 +17 - L -(RT) 10C 116 +15 -L- (LT) TO 0.25 0.04 117 +08 - L -(RT) 11 123 +22 -L- (LT) TO 0.33 127 +94 - L -(RT) Bank Stabilization 18 SUBTOTALS: 2.70 0.05 0.17 0.06 1 <0.01 873 39 PERMIT DRAWINGS SHEET 89 OF 93 NOTE: Rounded totals are based upon sum of actual impacts. Permaner Mechanized Excavation Temp. SW Clearing in SW impacts in Wetlands Wetlands impacts 0.002 0.001 0.006 0.006 0.002 0.005