HomeMy WebLinkAboutNC0022098_Authorization to Construct_20211019
October 19, 2021
Rich Colangelo, Designated Representative
T3T Cranbrook, LLC
1150 Hungry Neck Blvd, Suite C-359
Mount Pleasant, SC 29464
SUBJECT: Authorization to Construct
A to C No. 022098A02
T3T Cranbrook, LLC
Cranbrook Village Community WWTP
NPDES Permit No. NC0022098
Dear Mr. Colangelo:
A letter of request for an Authorization to Construct was received April 14, 2021, by the
Division of Water Resources (Division). With additional information received on October 18,
2021, final plans and specifications for the subject project have been reviewed and found to be
satisfactory. Authorization is hereby granted for the construction of modifications to the existing
Cranbrook Village Mobile Home Park WWTP, with discharge of treated wastewater into Little
Alamance Creek of the Cape Fear River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of one (1) 10,000 gallon flow equalization basin with two (2) 25 GPM
submersible pumps, two (2) recirculating media filter units with 300 square feet of treatment
surface area per unit and one (1) recirculating media filter units with 250 square feet of treatment
surface area per unit, six (6) 75 GPM recirculation pumps, and two (2) 25 GPM discharge pumps
from the treatment units to two (2) 28,800 GPD pressure UV disinfection units in series;
decommissioning of the existing package treatment plant; and installation of all necessary piping
and controls; in conformity with the project plans, specifications, and other supporting
documentation comprising the ATC Permit Application package submitted to the Department of
Environmental Quality.
This ATC is issued in accordance with Part III, Paragraph A of NPDES Permit No.
NC0022098 issued effective December 1, 2020 and shall be subject to revocation unless the
wastewater treatment facilities are constructed in accordance with the conditions and limitations
specified in Permit No. NC0022098.
DocuSign Envelope ID: E2393727-B205-4FD5-AA59-9FB817FD5C0B
Mr. Rich Colangelo, Designated Representative October 19, 2021 Page 2 of 3
It is the Owner’s responsibility to ensure that the as-constructed project meets the
requirements of all applicable regulations and statutes, the ATC Permit Application package, and
all of the requirements contained herein. Failure to comply may result in penalties in accordance
with North Carolina General Statute §143-215.6A through §143-215.6C.
The sludge generated from these treatment facilities must be disposed of in accordance
with G.S. 143-215.1 and in a manner approved by the Division.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by the Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Winston-Salem Regional Office, telephone number (336)776-9800, shall be notified
at least forty-eight (48) hours in advance of operation of the installed facilities so that an on-site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
Upon completion of construction and prior to operation of this permitted facility, a
certification must be received from a Professional Engineer certifying that the permitted facility
has been installed in accordance with the NPDES Permit and the ATC Permit Application
package. Mail the Certification to: Division of Water Resources, WQ Permitting – NPDES, 1617
Mail Service Center, Raleigh, NC 27699-1617.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III, and IV facilities at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T15A:8G.0202.
A copy of the project plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
DocuSign Envelope ID: E2393727-B205-4FD5-AA59-9FB817FD5C0B
Mr. Rich Colangelo, Designated Representative October 19, 2021 Page 3 of 3
During the construction of the proposed additions/modifications, the Permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor’s
responsibilities shall be in complying with these Acts.
Prior to entering into any contract(s) for construction, the recipient must have obtained all
applicable permits from the State.
The issuance of this ATC does not preclude the Permittee from complying with any and
all statutes, rules, regulations, or ordinances which may be imposed by other government
agencies (local, state, and federal) which have jurisdiction.
If you have any questions or need additional information, please contact Julia Byrd at
telephone number (919) 707-3707 or by email at julia.byrd@ncdenr.gov.
Sincerely,
for S. Daniel Smith
Director, Division of Water Resources
by Min Xiao, PE
NPDES Industrial Permitting Unit
With Engineer’s Certificate attached:
cc: NPDES Files
ecopy: Kevin Davidson, PE
Agri-Waste Technology, Inc.
Email: kdavidson@agriwaste.com
DWR Winston-Salem Regional Office, Water Quality Programs
Without Engineer’s Certificate attached:
cc: Guilford County Health
DocuSign Envelope ID: E2393727-B205-4FD5-AA59-9FB817FD5C0B