Loading...
HomeMy WebLinkAbout20211318 Ver 1_More Information Received_20211019Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID# * Version* 1 20211318 Is this project a public transportation project?* Yes 9 No Reviewer List: Colleen Cohn:eads\cmcohn Select Reviewing Office: * Raleigh Regional Office - (919) 791-4200 Does this project require a request for payment to be sent?* Yes No Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Is this supplemental information that needs to be sent to the Corps?* Yes No Project Contact Information Name: Wyatt I brown Who is submitting the information? Email Address: brownenvgrp@gmail.com Project Information Existing ID #: Existing Version: 20211318 1 20170001 (no dashes) 1 Project Name: Field View S/D (Civitan Road) Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (ies) Johnston Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Answers to Chris' Questions.pdf 151.76KB WETLAND IMPACT MAPS FIELD VIEW 2.37MB 2021.10.18.pdf TOWN DOES NOT REQUIRE MAINTAINANCE 703.18KB CORRIDOR OVER SEWER IN WETLANDS.pdf Civitan Road Four Oaks Revised Preliminary 1.52MB Wetland Map 1.pdf Preliminary JD (Revised).pdf 155.94KB Revised PCN Impact Sheet.pdf 527.55KB Only pdf or kmz files are accepted. Describe the attachments or comments: I have attached the answers to Chris' questions, and revised impact maps reflecting the answers. I deleted Wetland EE, I have attached the revised Preliminary Wetland Map and Natural Resource table from the Preliminary JD form (I sent Chris an email today with explanation and photos). The contractor was afraid he could not accurately directional bore the gravity sewer line, so we are showing this as a temporary impact since the disturbed wetland area is not a woodland. I have attached a revised PCN impact sheet showing this change. I have also attached a signed letter from the Town of Four Oaks stating a sewer maintenance corridor is not required. Thank you. Sign and Submit ,/ By checking the box and signing box below, I certify that: * 1, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. * 1, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. * I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); * I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); * I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND * I intend to electronically sign and submit the online form. Signature: Z/-?,/ ,qw�at,ww Submittal Date: Is filled in automatically.