HomeMy WebLinkAboutSW6211003_Plansheet - SCM Detail_20211019W z J� CONSTRUCTION SEQUENCE FOR WET DETENTION POND: 1. INSTALL EROSION CONTROLS. 2. CONSTRUCT DAM BASE AND AREAS BELOW THE NORMAL POOL. CONSTRUCTION TO BE PERFORMED UNDER THE INSPECTION OF THE GEOTECHNICAL ENGINEER. SEED UPON COMPLETION. 3. INSTALL OUTLET PIPE, RIP -RAP APRON AND STONE FILTER RING. 4. CONSTRUCT OUTLET STRUCTURE. 5. REMOVE ACCUMULATED SEDIMENT AND SEED UPON COMPLETION. 15" HDPE WITH WATER TIGHT SEAL PIPE TO BE BEDDED PER DIRECTION OF GEOTECHNICAL ENGINEER 2 APPROXIMATE SIZE EXCAVATE AND BACKFILL WITH COMPACTED STRUCTURAL FILL AS DIRECTED BY GEOTECHNICAL ENGINEER 14'-15" HDPE @ 2.86% SILT FENCE AS NEEDED S MIN TOp0F 4.2 4' MIN EMBANKMENT WIDTH 6' TOPSOIL FOR ALL - AREAS ABOVE THE NORMAL POND ELEVATION 7� TRASH RACK REFER TO DETAIL THIS SHEET 6"TOPSOIL ABOVE � 1 TOP OF ENIBANI31ENT ELEVATION=205.5 6" CLAY LINER REFER TO DETAIL too YEAR STORM ELEVATION=205.07 ON LITTORAL SHELF FOR INCREMENTAL WEIR 6" CLAY SOIL LINER ON INSIDE 3 FACE OF 10 YEAR STORM ELEVATION=204.64 EMBANKMENT 1 6 4'x j PRECAST 6FT LITTORAL 1 SHELF CONCRETE RISER (INSTALL STEPS AS NECESSARY) 2 YEAR STORM ELEVATION=204.26 o M i YEAR STORM ELEVATION=204.14 INV=202.5 1.o-INCH STORDI ELEVATION=202.79 -,7 NORbfAL POND ELEVATION=202.5 1 ELEV=200.5 - 1 4' D IN. ASTM C-923 SEAL BETWEEN KEY BARREL & RISER. RISER BASE TO BE FILLED WITH CONC. TO INVERT OF BARREL 8"18"11"112" LONG ANGLE (6 TOT. REQUIRED) TO ANCHOR RISER TO BASE. PROVIDE 2-3/4" A307 BOLTS FROM ANGLE TO RISER AND 2-A307 "J" HOOKS 3/4" DIA. X 12" LONG FROM ANGLE TO BASE. ANGLE TO BE FIELD COATED WITH ZINC RICH PAINT AFTER CONSTRUCTION. T' HOOKS TO BE PLACED UNDER LOWER REINFORCING STEEL. FILTER MEDIA (SEE NOTE 2) FLOW FlO7P PRIOR TO INSTALLATION, MANUFACTURER SPECIFICATIONS OF FILTER MEDIA SHALL BE REVIEWED TO ENSURE THAT DISCHARGE FROM FILTER MEDIA SHALL MEET OR EXCEED THE PROVISIONS OF THE CLEAN WATER ACT. ENSURE THAT PUMP PRESSURE DOES NOT EXCEED FILTER MEDIA PRESSURE RATING. FILTER MEDIA MAY BE, BUT NOT LIMITED TO, SAND MEDIA FILTRATION DEVICES, RATED FILTER FABRIC BAGS OR POLYMER BASED DEWATERING PRACTICES. PUMP STRAINER SHALL NOT BE IN CONTACT WITH BOTTOM OF POND. BMP POND DEWATERING SEEDBED PREPARATION: 1. CHISEL COMPACTED AREAS AND SPREAD TOPSOIL THREE INCHES DEEP OVERADVERSE SOIL CONDITIONS, IFAVAILABLE. 2. RIP THE ENTIRE AREA TO SIX INCHES DEEP. 3. REMOVE ALL LOOSE ROCK, ROOTS AND OTHER OBSTRUCTIONS, LEAVING SURFACE REASONABLY SMOOTH AND UNIFORM. 4. APPLYAGRICULTURAL LIME, FERTILIZER, AND SUPERPHOSPHATE UNIFOR14LYAND MIX WITH SOIL (SEE SEEDING MIXTURE). 5. CONTINUE TILLAGE UNTIL WELL -PULVERIZED, FIRM, REASONABLY UNIFORM SEEDBED IS PREPARED FOUR TO SIX INCHES DEEP. 6. SEED ON A FRESHLY PREPARED SEEDBED AND COVER SEED LIGHTLY WITH SEEDING EQLIPMENT OR CULTIPACK AFTER SEEDING. 7. MULCH IMMEDIATELYAFTERSEEDING AND ANCHOR MULCH. 8, INSPECT ALL SEEDED AREAS AND MAKE NECESSARY REPAIRS OR RE-SEEDINGS WITHIN THE PLANTING SEASON, IF POSSIBLE, IF STAND SHOULD BE MORE THAN 6o%DAMAGED, RE-ESTABLISH FOLLOWING THE ORIGINAL LIME, FERTILIZER AND SEEDING RATES, 9. CONSULT S&ECENVIRONMEVTAL ENGINEERS ON MAINTENANCE TREATMENT AND FERTILIZATION AFTER PERMANENT COVER IS ESTABLISHED. LANDSCAPE NOTES: ALL LANDSCAPING SHALL BE IN COMPLIANCE WITH THE NCDEQ BMP REQUIREMENTS. LANDSCAPE CONTRACTOR SHALL PROVIDE A TWO-YEAR WARRANTY FOR BMP PLANTING SURVIVAL/REPLACEMENT. AT THE END OF THE FIRST YEAR AND AT THE END OF THE TWO-YEAR WARRANTY PERIOD, ALL PLANTS THAT DO NOT SURVIVE MUST BE REPLACED. ESTABLISHMENT PROCEDURES, SUCH AS CONTROL OF INVASIVE WEEDS, ANIMAL AND VANDAL DAMAGE, MULCHING, RE -STAKING, WATERING, AND MESH OR TUBE PROTECTION REPLACEMENT, SHALL BE IMPLEMENTED TO THE EXTEND NEEDED TO ENSURE PLANT SURVIVAL. STAKING MUST BE REMOVED AFTER ESTABLISHMENT (APPROXIMATELY 12 MONTHS), TO PREVENT GIRDLING (STRANGLING) OF ALL WOODY PLANTS. SOD WITHIN BMP AND SURROUNDING AREAS TO BE BERMUDA OR CENTIPEDE GRASS. GRASS OR WILDFLOWER SEED MUST BE APPLIED AT THE RATES SPECIFIED BY THE SUPPLIERS. IF PLANT ESTABLISHMENT CANNOT BE ACHIEVED WITH SEEDING BY THE TIME OF SUBSTANTIAL COMPLETION OF THE STORMWATER FACILITY PORTION OF THE PROJECT, THEN THE CONTRACTOR SHALL PLANT THE AREA WITH WILDFLOWER SOD, PLUGS, CONTAINER PLANTS, OR OTHER MEANS TO COMPLETE THE SPECIFIED PLANTING AND PROTECT AGAINST EROSION BEFORE WATER IS ALLOWED TO ENTER THE STORMWATER BMP FACILITY. ALL MATERIALS SHALL BE ACQUIRED FROM AN APPROVED NCDEQ PLANT VENDOR. PLANT MATERIAL SHOULD BE PURCHASED FROM A LOCAL SOURCE TO ENSURE SURVIVABILITY. LOCAL VENDORS FOR THIS SITE INCLUDE: - CILL IDE NATIVE PLANT NURSERY 919-662-5566 - GROWING WILD NURSERY 910-259-6361 - NC FOREST SERVICE 919-731-7988 - PLANT DELIGHTS NURSERY 919-772-4794 - TARHEEL NATIVE TREES 919-553-5927 IMMEDIATELY AFTER THE WET DETENTION BASIN IS ESTABLISHED THE PLANTS ON THE VEGETATED SHELF AND PERIMETER OF THE BASIN SHOULD BE WATERED TWICE WEEKLY IF NEEDED UNTIL THE PLANTS BECOME ESTABLISHED (COMMONLY SIX WEEKS) NO PORTION OF THE WET DETENTION POND SHOULD BE FERTILIZED AFTER THE FIRST INITIAL FERTILIZATION THAT IS REQUIRED TO ESTABLISH THE PLANTS ON THE VEGETATED SHELF. LANDSCAPING NOTES: 1. CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES AN D ORDINANCES REGARDING LANDSCAPING. 2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ESTABLISH A HEALTHY STAND OF GRASS ON ALL SEEDED AREAS. 3. CONTRACTOR SHALL PROVIDE NATURAL TOPSOIL THAT IS FERTILE, FRIABLE, WITHOUT MIXTURE OF SUBSOIL MATERIALS, AND OBTAINED FROM A WELL DRAIN ED, AVAILABLE SITE. IT SHALL NOT CONTAIN SUBSTANCES WHICH MAY BE HARMFUL TO PLANT GROWTH, TOPSOIL SHALL BE SCREENED AND FREE FROM CLAY, LUMPS, STONES, ROOTS, PLANTS, OR SIMILAR SUBSTANCES 1" OR MORE IN DIAMETER, DEBRIS, OR OTHER OBJECTS WHICH MIGHT BEAHINDERANCETOPLANTING OPERATIONS. TOPSOIL SHALL CONTAINATLEAST 4-6%ORGANIC MATTER BYWEIGHT AND HAVE A PH RANGE OF 5.5 TO 7.0. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR THE WATERING AND THE MAINTENANCE OF ALL LANDSCAPED AREAS UNTIL THE LATER OF; (a) THIRTY (3o) DAYS FOLLOWING THE PLANTING OF THE GRASS AND SHRUBS, OR Ho THE DATE THAT STORE OPENS FOR BUSINESS TO THE PUBLIC. CONTRACTOR SHALL ALSO BE RESPONSIBILITY FOR THE SURVIVAL OF THE BDIP PLANTING MATERIALS DURING THE TWO -PEAR WARRANTY PERIOD AND SHALL REPLACE ALL PLANTS THAT DO NOT SURNIVE AT THE END OF THE FIRST YEAR AND AT THE END OF THE SECOND YEAR OF THE WARRANTY PERIOD. 5. CONTRACTOR TO VERIFY QUANTITIES PRIOR TO COMMENCING WORK. 6. ANY DISTURBED AREAS NOT SCHEDULED FOR HARDSCAPE, PLANTINGS, OR MULCH SHALL BE SEEDED LAWN. REFER TO SITE PLAN FOR LOCATION OF AREAS TO BE SODDED. NO PLANT SUBSTITUTIONS ARE PERMITTED WTTHOUT WRITTEN APPROVAL OF THE OWNERS REPRESENTATATE. 8. FOR NEW PLANTING AREAS, REMOVE ALL PAVEMENT, GRAVEL SUB -BASE AND CONSTRUCTION DEBRIS; REMOVE COMPACTED SOIL AND ADD 18" NEW TOPSOIL, OR TILL AND AMEND THE TOP 18" OF EXISTING SOIL TO MEET TOPSOIL/PLANTING MIX STANDARDS FOR TREES. 9. ADJUST TREE PLANNING LOCATIONS TO AVOID UNDERGROUND UTILITIES. PLANT r5'FROM .ALL UNDERGROUND I FILITIES(SEWER AND STORM DRAINAGE, GAS, WATER, PHONE, AND ELECTRICAL LINES.) STORMWATER MANAGEMENT SYSTEM DETAILS 1 NOT TO SCALE LOW POINT LEVEL PVC ELBOW SEE DETAIL \rr� =o n NOTE:1.o" STORM ELEVATION IS 202.79 AND INTERMEDIATE WEIR IS ELEVATION 204.5. THERE IS ADDITIONAL STORAGE DESIGNED FROM THE i.o" STORM ELEVATION TO THE INTERMEDIATE WEIR ELEVATION. 2 NOTE: PUMPS SHALL BE USED TO DRAIN 1 THE POND WHEN NECESSARY. REFER TO DETAIL THIS SHEET FOR DEWATERING REQUIREMENTS. BOTTOM OF POND (TOP OF SEDIMENT STORAGE)=196.0 CONCRETE SHALL BE PLACED IN RISER AFTER ANGLES ARE SECURED TO BASE AND RISER. - 5 x5'xL5' CONC. BASE REINFORCE WITH #4 BARS AT 12" O.C. TOP AND BOTTOM OF EACH DIRECTION PROVIDE 3" MIN. CLEARANCE BETWEEN EDGE OF CONC. AND STEEL REINFORCING. PROFILE OF WET POND DETENTION SYSTEM (BOTTOM OF SEEDDIMENT SSTrORAGE)r=11995.0 6" CLAY SOIL - LINER MAIN POOL RISI // ' .......... "" �jp ?I��ISTING �, 15" OUTLET PIPE ELIl V� /�O �t> REFER TO GRADING 0 0 0 0 PLAN000, � // / e � 1 / O� \ 1 INLET PIPE WITH- � RIP -RAP APRON 20 0 10 20 1 INCH = 20 FEET GRAPHIC SCALE OUTLET CONTROL STRUCTURE REFER TO DETAILS THIS SHEET 11 O 11 1 TOP OF EMBANKMENT Lp 1 1 ELEV=205.5 O 1 L)l 1 1 W„ O u L)l 1 , c9 ,,coo +,7 1 icon AI5 � 1 00 ;fA q i .`� IJ 1 1 1 <�o 0 ^ Ar '; u O 1 P i ; MAIN POND AREA ,fi r r r yZ Lr L. q LITTORAL SHELF AREA=1,022 ..SF REFER TO DETAIL FOR l PLANTINGS l 1 FOREBAYWEIR J -STORMWATER y MANAGEMENT \\ EASEMENT \ \0 1 O PLAN VIEW EXISTING GRADE=203.0t 2 1 LIUKLIVUI JriUVVA rUKULtItUll TRASH RACK) OUTLET CONTROL STRUCTURE - INCREMENTAL WEIR 6" TOPSOIL ABOVE- 6" CLAY LINER ON LITTORAL SHELF 6FT LITTORAL 6:1 SHELF NOTES: 1. SEE DESIGN PLANS FOR SPECIFIED DIMENSIONS OF RISER. 2. TRASH RACK DIMENSION CRITERIA SPECIFIED IS APPROXIMATE AND VARIES BY MANUFACTURER. 3. INSTALLATION OF TRASH RACK SHALL BE ACCORDING TO MANUFACTURER'S RECOMMENDATIONS. 4. ALL COMPONENTS OF TRASH RACK SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL. 5. ALL MOUNTING HARDWARE SHALL BE OF STAINLESS STEEL OR OTHER NON -CORROSIVE MATERIAL. TRASH RACK ION CORROSIVE MATERIAL � 5.5" Ca 5.5" SPACING 5.5 55" 5 5„ NOTE: RISER TRASH RACK SHALL BE INSPECTED PERIODICALLY AND ANY DEBRIS ON THE TRASH RACK IS TO BE REMOVED AND PROPERLY DISPOSED OF. TRASH RACK DETAIL 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION FOREBAY BERBI 3:1 5.o' GRASS FOREBAY WEIR AT ELEV=202.0 FOREBAY TOP ELEV= 203.5 WIDTH AT TOP = 3.5 FF FOREBAY ENTRANCE SHALL BE DEEPER THAN FOREBAY EXIT PERM. POND ELEV.=202.5 SEDIMENT STORAGE TO FOREBAY BOTTO ELEV=too. RISER STRUCTURE 4" PVC SCREW CAP FOR CLEANING ACCESS 12" MIN. 4"4' PVC TEE 0.75"DIA. HOLE DRILLED INTO BOTTOM CAP PVC DRAIN OUTLET NOTE: PUMPS SHALL BE USED TO DRAIN THE FOREBAY WHEN NECESSARY. REFER TO DETAIL P THIS SHEET FOR DEWATERING REQUIREMENTS. a NORMAL POND ELEVATION BOTTOM LITTORAL SHELF ELEV. M BOTTOM OF SEDIMENT - STORAGE/EXIT ELEV=199.5 FOREBAY ENTRANCE SHALL BE DEEPER THAN FOREBAY EXIT SHALLOW LAND ZONE HERBACEOUSPLANTS 6 TYPICAL LITTORAL SHELF VEGETATION DETAIL SCALE: N.T.S. SCIENTIFIC NAME COMMON NAME PLANTING ZONE QUANTITY NURSERY CONTAINER TYPE FOREBAY SHALLOW WATER ZONE HERBACEOUS PLANTS POND (NORMAL POOL) 6" TOPSOIL FOR ALL AREAS ABOVE THE NORMAL POND ELEVATION BOTTOM OF SEDIMENT STORAGE/ENTRANCE ELEV=i99.o SPACING PLANTING SEASON Jancus effusus Soft Rush SHALLOW WATER 43 PEAT POT C O.C. SPRING/SUMMER Iris virginica Blue Flag Iris SHALLOW WATER 43 PEAT POT C O.C. SPRING/SUMMER Schocnoplectus tabernacmontani Soft Stem Bulrush SHALLOW WATER 43 PEAT POT 6' O.C. SPRING/SUMMER Eupatoriadelphus maculatus Spotted Trumpetweed SHALLOW LAND 43 PEAT POT C O.C. SPRING/SUMMER Eupatorium purpureum Joe-Pye Weed SHALLOW LAND 43 PEAT POT C O.C. SPRING/SUMMER Rhynchospora colorata Starrush Whitetop SHALLOW LAND 43 PEAT POT C O.C. SPRING/SUMMER TYPICAL LITTORAL SHELF PLANTING SCHEDULE STORMWATER MANAGEMENT NOTES: 1. THE DEVELOPER OR HIS AGENT SHALL CONTACT THE DESIGN ENGINEER WHEAT THE BEST MANAGEMENT PRACTICE(S) ARE CONSTRUCTED AND ABOUT TO BECOME OPERATIONAL SO A FINAL INSPECTION CAN BE PERFORMED TO DETERMINE COMPLIANCE WITH THEAPPROVED PLAArCAArBE PERFORMED. 2. ANNUAL MAINTENANCE INSPECTIONAND REPORT REQUIRED - THE OWNER OFA PER3IITTED STRUCTURAL STORMWATER B3 P/CONTROL SHALL AATNUALLYSUBMITA MAINTENANCE AND INSPECTION REPOR T FOR EACH BAP TO THE STORMWATER ADMINISTRATOR. ANNUAL INSPECTIONS SHALL BEGIN WITHIN ONE YEAR OF THE RECORDATIONOFANYDEED(S) SHOWING STORI IVATER BMPs/CONTROL STRUCTURES. 3. UPON COMPLETION OF THE PROJECT, AND BEFORE A CER TIFICA TE OF OCCUPANCY SHALL BE GRANTED, THE ENGINEER OF RECORD SHALL CERTIFY THAT THE COMPLETED PROJECT IS INACCORDANCE WITH THEAPPROVED STORALWATER MANAGEMENT PLANSAND DESIGNS. 4. A FINAL INSPECTION OF THE SITE AND STORMWATER MANAGEME.'VT BMP/CONTROLS TO BE SCHEDULED WITHAND COMPLETED BYTHE PROJECT ENGINEER . 5. NCDEQ AND THEIR ASSIGNS HAVE RIGHT TO ACCESS THE STORMWATER CONTROL(s) FOR INSPECTIONS OR 31AINTEN9NCEAS NECESSARY. 6. THE ENGINEER'S CERTIFICATION OF COMPLETION WILL BE REQUIRED PRIOR TO THE FINAL PLAT OR CERTIFICATE OF OCCUPANCY. THE STORUHATER CONTROL IS TO BE INSPECTED TO ENSURE ITIS FUNCTIONING AS DESIGNED AND HAS FULL DESIGN VOLUME PRIOR TO ISSUANCE OF THE FINAL CERTIFICATE OF OCCUPANCY. 1, THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING THE STOnIWATER CONTROLS(s)ACCORDING TO THEAPPROVED MAINTENANCE PLANAND DIRECTION OF NCDEQ �STORMWATER MANAGEMENT DESIGN WET DETENTION POND RIVER BASIN: LUMBER RECEDING STREAM: RAFT SWAMP STREAM INDEX: 14-1041) STREAM CLASS: C;Sw HUC: 0304020305 PROJECT COORDINATES: 34.886899°N,-79.207507°W POND DESIGN SUMMARY DRAINAGE AREA TO POND: r.o0 ACRES SITE IMPERVIOUS AREA TO POND: 0.79 ACRES OFF -SITE DESIGN IMPERVIOUS AREA TO POND: ono ACRES TOTAL DESIGN IMPERVIOUS AREA TO POND: 0.79 ACRES PRE -DEVELOPED POST -DEVELOPED POST DEVELOPED POST DEVELOPED POST DEVELOPED TOPOND TOPOND THROUGH POND BYPASS COMBINED DRAINAGE AREA: 2.02 AC im AC 1.02 AC CURVE NUMBER: 53.6 87.9 52.1 TIME OF CONCENTRATION: 13.1 MN 5 MIN to MIN 1.0" STORM EVENT: 0.187 CFS 0.007 CFS 1-YEAR STORM EVENT: o.lo8 CFS 3.059 CFS o.or9 CFS 0.029 CFS 0.048 CFS 2-YEAR STORM EVENT: 0.525 CFS 3.963 CFS 0.087 CFS 0.187 CFS 0.274 CFS to -YEAR STORM EVENT: 2.807 CFS 6.519 CFS o.986 CFS 1.242 CFS 2.228 CFS too-YEARSTORM EVENT: 8.044 CFS 1o.6o CFS 7.973 CPS 3.795 CFS 11.77 CPS STAGE STORAGE TABLE STAGE ELEVATION CONTOUR INCREMENTAL TOTAL (FT) (FT) AREA (SF) STORAGE (CF) STORAGE (CF) 0.0 202.5 2350 0 0 0.5 203.0 3043 1348 1348 1.0 203.5 3468 1628 2976 (WQV) 1.5 204.0 3993 1865 4841 2.5 205.0 4767 4380 9221 3.0 205.5 5176 2486 11707 OPERATION & MAINTENANCE BMP element: Potentialproblem: How I will remediate the problem The entire BMP Trash/debris is present Remove the trash/debris The Perimeter of the wet etention basin Areas of bare soil and/or erosive gullies have formed Regrade the soil if necessaryto remove the gully, and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application Vegetation is too short or too Maunam vegetation at a height long of approximately six inches. e inletdevice: pipe or The pipe is clogged. Unclog the pipe. Dispose o t e wale sediment off -site. The pipe is cracked or Replace the pipe. otherwise damaged Erosion is occurring in the Regrade the swale if necessary swale. to smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebav Sediment has accumulated to Search for the source o the a depth greater than the sediment and remedy the original design depth for problem if passible. Remove the sediment storage. sediment and dispose ofitin a location where it will not cause impacts to streams or the BMP. Erosion hasoccure . ProVI ea ttmna erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Wee s are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The vegetated shelf Best professional practices Prune according to best show that pruning is needed professional practices to maintain optimal plant health. Plants are dead, diseased or Determine the source of the dying. problem: soils, hydrology, disease, etc Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessarv. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. The main treatment area Sediment has are elated to Search or the source of t e a depth greater than the sediment and remedy the original design sediment problem if possible. Remove the storage depth. sediment and dispose ofitin a location where it will not cause impacts to streams or the BMP. Aga growt covers over 5o% Consult a professional to remove of the area. and control the algal growth. Cattails, phragmites or other Remove the plants by wiping invasive plants cover 50% of them with pesticide (do no the basin surface. spray) The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment Evidence of muskrat or beaver Use traps to remove muskrats activity is present. and consult a professional to remove beavers. Atree has started to grow on Consult a dam safety specialist the embankment. to remove the tree. An annual innspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage haveoccurred at the Water Quality Regional Office, or outlet. the 401 Oversight Unit at 010-71q-1786. �N o w c m Z o w m aim � N CONSULTANT: Bowman North Carolina, Ltd. (Formerly Triangle Site Design, PLLC) 4004 Barrett Drive, Suite 101 Raleigh, NC 27609 (919) 553-6570 mlowder@bowman.com FIRM# F-1445 �r�,rylerrFr,r ' W, . 4�F SEAL 3!�4 ' E. rs�r Aor'M,rw J OWNER/DEVELOPER: RHETSON COMPANIES, INC. AM. ALAN CAGLE 2075 JUNIPER LAKE ROAD WEST END, NC 27376 (910) 944-0881 alan@rhetson,com r� N -k- concepts and designs presented herein, as an instrument of services, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Bowman North Carolina, Ltd. shall be without liability to Bowman North Carolina, Ltd. I� O rn Drawn Checked Rhetson Project# 20138 Project No. 058001 Initial Date: September 20, 2021 Title STORMWATER MANAGEMENT DETAILS Sheet No. C-10 )G#23213-Red Springs (Hoke