Loading...
HomeMy WebLinkAboutSW6211003_O&M Agreement/Plan_20211019Project Name: I Dollar General - Red Springs (Hoke County) Project Location: NC 211 (Red Springs Rd) and N Old Wire Rd (SR 1105) .. .......�.� oue(Pag" Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & corresponding O&M sheets will be added automaticall Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: 1 Location(s): Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: Location(s): Rainwater Harvesting Quantity: _ Location(s): Green Roof Quantity: Location(s): Level Spreader - Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity:' _ Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s) Low Density Present: No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Rhetson Companies, Inc. Title & Organization: Jamie Encinosa, EVP of Operations Street address: 2075 Juniper Lake Dr. City, state, zip: West End, NC 27376 ........................... . Phone number(s): 910-944-0881 Email: jamie@rhetson.com Signature: a Notary Public for the State of County of do hereby certify that I Date: �' ) `) " o ?_ personally appeared before me this day of 02..� and acknowledge the due execution of th operations and Maintenance Agreement . Witness my hand and official seal, �� _..._� NOTARY PUB C Moore Coun North Carol] CommFssion 6 i 4121, 2026 Seal My commission expires-, �.....� STORM-EZ 7/27/2021 Version 1 5 O&M Agreement Page 1 of 5 Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment - through the emergency drain will be minimized as much as possible. At least once annually, a dam safety expert will inspect the embankment. Any problems that are W found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately SCM element: The entire wet pond The perimeter of the wet pond Potential problem: Trash/debris is present, Areas of bare soil and/or erosive gullies have formed. The inlet pipe is clogged (if applicable). How to remediate the problem: Remove the trash/debris. Regrade the soil if necessary to remove the gully, plant ground cover and water until it is established. Provide lime and a one - time fertilizer application. Unclog the pipe. Dispose of the sediment off -site. The inlet pipe is cracked or otherwise damaged (if Repair or replace the pipe. The inlet device applicable). Erosion is occurring in the Regrade the swale if necessary and provide erosion control swale (if applicable). devices such as reinforced turf matting or riprap to avoid future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a design depth for sediment location where it will not cause impacts to streams or the SCM. storage. The forebay Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Wet Pond Maintenance'.Bogy(�eontinue SCM element: Potential problem::. How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a design sediment storage location where it will not cause impacts to streams or the SCM. depth. _ The main treatment area Algal growth covers over Consult a professional to remove and control the algal growth, p g 50% of the area. Cattails, phragmites or Remove the plants by wiping them with pesticide (do not other invasive plants cover spray). 50% of the basin surface. Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, Plants are dead, diseased disease, etc. Remedy the problem and replace plants. Provide or dying. a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present, repair any holes or erosion. The embankment A tree has started to grow Consult a dam safety specialist to remove the tree. on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately, the embankment needs repair. Clogging has occurred. gg g Clean out the outlet device and dispose of any sediment in a location where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees Remove the weeds or trees, re growing on the mat. a Floating wetland island (if applicable) The anchor cable is damaged, disconnected or Restore the anchor cable to its design state. missing. SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure, the outlet. The receiving water Discharges from the wet pond are causing erosion Contact the local NCDEQ Regional Office. or sedimentation in the receiving water. 77, Wet Flond Ding iRl WET POND Pretreatment other than forebay? No Has Veg. Filter? No Permanent Pool El. 202.5 Temporary Pool El-. 203.5 Clean Out Depth: 2.5 Sediment Removal E 200 Bottom Elevation: 199 Al IACH ADDI II IONAL SHEET5 IF NECESSARY Permanent Pool El, 202.5 Temporary Pool El, 203.5 Clean Out Depth: 6.5 Sediment Removal E 196 Bottom Elevation: 195