HomeMy WebLinkAboutSW6211003_O&M Agreement/Plan_20211019Project Name: I Dollar General - Red Springs (Hoke County)
Project Location: NC 211 (Red Springs Rd) and N Old Wire Rd (SR 1105) .. .......�.�
oue(Pag"
Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location.
Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can
affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s).
The SCM(s) on this project include (check all that apply & corresponding O&M sheets will be added automaticall
Infiltration Basin
Quantity:
Location(s):
Infiltration Trench
Quantity:
Location(s):
Bioretention Cell
Quantity:
Location(s):
Wet Pond
Quantity: 1
Location(s):
Stormwater Wetland
Quantity:
Location(s):
Permeable Pavement
Quantity:
Location(s):
Sand Filter
Quantity:
Location(s):
Rainwater Harvesting
Quantity: _
Location(s):
Green Roof
Quantity:
Location(s):
Level Spreader - Filter Strip
Quantity:
Location(s):
Proprietary System
Quantity:
Location(s):
Treatment Swale
Quantity:
Location(s):
Dry Pond
Quantity:' _
Location(s):
Disconnected Impervious Surface Present: No
Location(s):
User Defined SCM
Present: No
Location(s)
Low Density
Present: No
Type:
I acknowledge and agree by my signature
below that I am responsible for
the performance of the maintenance procedures listed for
each SCM above, and attached O&M tables.
I agree to notify NCDEQ of any problems with the system or prior to any changes to
the system or responsible party.
Responsible Party:
Rhetson Companies, Inc.
Title & Organization:
Jamie Encinosa, EVP of Operations
Street address:
2075 Juniper Lake Dr.
City, state, zip:
West End, NC 27376
...........................
.
Phone number(s):
910-944-0881
Email:
jamie@rhetson.com
Signature:
a Notary Public for the State of
County of do hereby certify that I
Date: �' ) `) " o ?_
personally appeared before me this day of 02..� and
acknowledge the due execution of th operations and Maintenance Agreement .
Witness my hand and official seal, ��
_..._�
NOTARY PUB C
Moore Coun
North Carol]
CommFssion 6 i 4121, 2026
Seal My commission expires-,
�.....�
STORM-EZ 7/27/2021
Version 1 5 O&M Agreement Page 1 of 5
Important operation and maintenance procedures:
Immediately after the wet detention basin is established, the plants on the vegetated shelf and
- perimeter of the basin should be watered twice weekly if needed, until the plants become
established (commonly six weeks).
No portion of the wet pond should be fertilized after the initial fertilization that is required to establish
the plants on the vegetated shelf.
Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet
pond.
If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment
- through the emergency drain will be minimized as much as possible.
At least once annually, a dam safety expert will inspect the embankment. Any problems that are
W found will be repaired immediately.
The measuring device used to determine the sediment elevation shall be such that it will give an
accurate depth reading and not readily penetrate into accumulated sediments.
After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater
than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a
known set location and shall be available upon request.
Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately
SCM element:
The entire wet pond
The perimeter of the wet
pond
Potential problem:
Trash/debris is present,
Areas of bare soil and/or
erosive gullies have
formed.
The inlet pipe is clogged
(if applicable).
How to remediate the problem:
Remove the trash/debris.
Regrade the soil if necessary to remove the gully, plant ground
cover and water until it is established. Provide lime and a one -
time fertilizer application.
Unclog the pipe. Dispose of the sediment off -site.
The inlet pipe is cracked
or otherwise damaged (if
Repair or replace the pipe.
The inlet device
applicable).
Erosion is occurring in the
Regrade the swale if necessary and provide erosion control
swale (if applicable).
devices such as reinforced turf matting or riprap to avoid future
problems with erosion.
Sediment has
accumulated to a depth
Search for the source of the sediment and remedy the problem
greater than the original
if possible. Remove the sediment and dispose of it in a
design depth for sediment
location where it will not cause impacts to streams or the SCM.
storage.
The forebay
Erosion has occurred.
Provide additional erosion protection such as reinforced turf
matting or riprap if needed to prevent future erosion problems.
Weeds are present.
Remove the weeds, preferably by hand. If pesticide is used,
wipe it on the plants rather than spraying.
Wet Pond Maintenance'.Bogy(�eontinue
SCM element:
Potential problem::.
How to remediate the problem:
Sediment has
accumulated to a depth
Search for the source of the sediment and remedy the problem
greater than the original
if possible. Remove the sediment and dispose of it in a
design sediment storage
location where it will not cause impacts to streams or the SCM.
depth.
_
The main treatment area
Algal growth covers over
Consult a professional to remove and control the algal growth,
p g
50% of the area.
Cattails, phragmites or
Remove the plants by wiping them with pesticide (do not
other invasive plants cover
spray).
50% of the basin surface.
Best professional
practices show that
pruning is needed to
Prune according to best professional practices.
maintain optimal plant
health.
The vegetated shelf
Determine the source of the problem: soils, hydrology,
Plants are dead, diseased
disease, etc. Remedy the problem and replace plants. Provide
or dying.
a one-time fertilizer application to establish the ground cover if
a soil test indicates it is necessary.
Weeds are present.
Remove the weeds, preferably by hand. If pesticide is used,
wipe it on the plants rather than spraying.
Shrubs have started to
Remove shrubs immediately.
grow on the embankment.
Evidence of muskrat or
Consult a professional to remove muskrats or beavers and
beaver activity is present,
repair any holes or erosion.
The embankment
A tree has started to grow
Consult a dam safety specialist to remove the tree.
on the embankment.
An annual inspection by
an appropriate
professional shows that
Make all needed repairs immediately,
the embankment needs
repair.
Clogging has occurred.
gg g
Clean out the outlet device and dispose of any sediment in a
location where it will not cause impacts to streams or the SCM.
The outlet device
The outlet device is
Repair or replace the outlet device.
damaged.
Weeds or volunteer trees
Remove the weeds or trees,
re growing on the mat.
a
Floating wetland island
(if applicable)
The anchor cable is
damaged, disconnected or
Restore the anchor cable to its design state.
missing.
SCM element: Potential problem: How to remediate the problem:
Erosion or other signs of
damage have occurred at Repair the damage and improve the flow dissipation structure,
the outlet.
The receiving water Discharges from the wet
pond are causing erosion Contact the local NCDEQ Regional Office.
or sedimentation in the
receiving water.
77,
Wet Flond Ding iRl
WET POND
Pretreatment other
than forebay? No
Has Veg. Filter? No
Permanent Pool El.
202.5
Temporary Pool El-.
203.5
Clean Out Depth:
2.5
Sediment Removal E
200
Bottom Elevation:
199
Al IACH ADDI II IONAL SHEET5 IF NECESSARY
Permanent Pool El,
202.5
Temporary Pool El,
203.5
Clean Out Depth:
6.5
Sediment Removal E
196
Bottom Elevation: