Loading...
HomeMy WebLinkAboutNCC215830_ESC Approval Submitted_20211020Trevor Spencer, P.E. DIRECTOR October 11, 2021 Owner/Financial Responsible Party Leoterra Eastchester, LLC., 110-A Shields Park Dr., Kernersville, NC 27284 ,► o `� A- NORTPI CAROLIN.NS INTERNATIONALCITY� RE: APPROVAL of EROSION and SEDIMENTATION CONTROL PLAN Project: Eastchester Subdivision, Location: 1918 Eastchester Dr., High Point, NC 27265 Lat. 36.012674 Long.-79.982141 Land Disturbing Permit: 4 EN 210247 2390 Dear Sir or Madame: The Engineering Services Department has completed the review process for the Soil Erosion Sedimentation Control Plan submitted to our department on 10/04/2021, for the project referenced above. Based on our review, the plan is hereby approved. This plan approval will specifically cover the Erosion and Sediment Control Measures required for both the Grading Phase and the Building Phase for the disturbed area indicated under Plan EN 210247. If a different identity (from the Grading Phase) executes the Building Phase, this approved Erosion and Sediment Control Plan (E&SCP) may be transferred to the firm/person executing the Building Phase. Prior to transferring the plan, written authorization and a Financial Responsibility Form must be submitted to our office. The terms and conditions of the orginal approved plan shall remain in place unless otherwise noted. The applicant may appeal the conditions of this approval or a standard of the ordinance, by writing to the Planning and Development Director within fifteen (15) days following the date of the approval, conditional approval, or disapproval of a plan. Information regarding the submission of the appeal can be found at the following link - Board of Adjustment'' High Point, NC (highpointnc.gov) or upon written request to the City of High Point Engineering Services Department. City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax:336.883.4118 Phone.336.883.3194 TDD:336.883.8517 As per Section 2.4.3.B.2 and § 113-A-61 (c) If the local government upholds the disapproval or modification of a proposed erosion and sedimentation control plan following the appeal, the applicant submitting the erosion and sedimentation control plan is entitled to appeal the local government's action disapproving or modifying the plan to the North Carolina Sediment Control Commission. Information regarding the Commission can be found at NC DEQ: N.C. Sedimentation Control Commission In the absence of an appeal, the decision of the Enforcement Officer shall be final. The Erosion Control Measures shown on the plan(s) are approximate. Some field adjustment may be required to make the measures work correctly. An Erosion Control Financial Guarantee (Surety) is required to be submitted prior to any Land -Disturbing activities. This refundable guarantee shall remain in force until the work is completed in accordance with the Land -Disturbance Permit and the work is approved by the Engineering Services Director. The amount of the guarantee required is $2000.00 per disturbed acre and can be in the form of a Check, Irrevocable Letter of Credit, Equivalent Security or Surety Bond. The Check, Irrevocable Letter of Credit or Equivalent Security can be deposited with the City or held in escrow with a Financial Institution as per Section 2.6.5 — Performance Guarantee of the City of High Point Development Ordinance. Surety bonds will be held by the city until released. This letter will serve notice that: • As per NCGS 15A NCAC 04B .0120 (b) and (c), INSPECTIONS AND INVESTIGATIONS, this letter shall serve as notice that inspection of sites shall be carried out by the staff of Department of Environmental Quality or other qualified persons authorized by the Commission or Department of Environmental as necessary to carry out its duties under the Act and no person shall refuse entry or access to any representative of the Commission or any representative of a local government who requests entry for purposes of inspection. • As per High Point Development Ordinance 2.5.10.G. I and 2, the Land -Disturbing Permit will become null and void one (1) year from the date of issuance. You may request in writing, 180-day permit extension 30 days prior to the expiration date, for good cause. • The approval of the draft Erosion and Sediment Control Plan and the Land Disturbing Permit issued by the City of High Point is conditional based on the applicant's compliance with Federal and State water quality laws, regulations, and rules. • The approval of the draft Erosion and Sediment Control Plan is based in part on the accuracy of the information provided on the submitted Financial Responsibility Form. If any changes to the submitted Financial Responsibility Form (e.g. ownership, address, company name) occur, then you are required to submit an amended form showing such changes. • The approval of the draft Erosion and Sediment Control Plan does not supersede any other permit or approval. • This Letter of Approval must be posted at the site of the land disturbing activity along 2 City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax:336.883.4118 Phone:336,883.3194 TDD:336.883.8517 with the Land -Disturbing Permit, the approved Erosion and Sediment Control Plan, a copy of the NPDES/NCG010 Permit, and a copy of the Certificate of Coverage (COC). • Records of Inspections must be kept on site for twelve (12) months. • All data used to complete the e-NOI and all Inspection Records must be maintained for a period of three (3) years and available upon request (40 CFR 122.41). • Construction site pollutants must be maintained on -site and not allowed to reach the state's waters. Any spent fluids from construction traffic must be cleaned up and disposed of properly. Any herbicide, pesticide and fertilizer must be used in accordance to the label restrictions. All wastes composed of building materials shall be disposed of in accordance with North Carolina General Statues, Chapter 130A, Article 9 — Solid Waste Management, and rules governing the disposal of solid waste (NC Administrative Code Section 15A NCAC 13B). No dumping of paint and other liquid building material waste in storm drains. Concrete materials onsite, including excess concrete, must be controlled, and managed to avoid contact with surface waters, wetlands, or buffers. No concrete slurry shall be discharged from the site. • Only minor deviation from the. approved plan can be approved by the Erosion Control Inspector. Deviations are limited to the following deficiencies: o Addition of E&SC measures (e.g., silt fence, inlet protection, check dam, rolled erosion control practices, etc.). o Relocation of E&SC Measures that improve the overall stormwater and sediment control. • Erosion Control Measures must be maintained until site is stabilized with sufficient ground cover. The Sedimentation Pollution Control Act of 1973 (NCGS 113A-51 through 66) is performance -oriented, requiring protection of existing natural resources and adjoining properties. If following the commencement of this project, the approved E&SCP is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973, revisions to the plan may be required by the Erosion Control Inspector. • A condition of this approval is that the streets in this phase must be kept free of sediment. • Erosion Control Measures to prevent construction traffic from tracking sediment onto the streets must be maintained_ Any debris or sediment shall be cleaned from the street surface immediately. Site Data: Project Name: Eastchester Subdivision Land -Disturbing Permit (CHP Project Tracking ID): # EN 210247 2390 Limits of Disturbance (in acres) approved: 14.00 acres per FRIOF Address: at/near 1918 Eastchester Dr. City: High Point State: NC Zip Code: 27265 County: Guilford 3 City of High Point, P.O. Box 230, 217 South Hamilton Street, High Point, NC 27261 USA Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517 Latitude (in decimal degrees): 36.012674 degrees* Longitude (in decimal degrees):-79.982141 degrees* River Basin: Cape Fear Receiving Water -Body: West Fork Deep River Stream Index: 17-3-(1.5)* Draft E&SCP submitted by: DMP Engineering Date(s) draft E&SCP Received: October 04, 2021 Plan Type: E&SCP Is this site part of a project covered under a common plan of development: No (new plan) X at/near Construction Entrance ** Could not pull up complete information on NC Surface Water Classifications Map 10-11-2021. Information shown could possibly be incorrect. Additional Information: You will be required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater General Permit from the Department of Environmental Quality (DEQ). Detailed information can be found on the North Carolina Environmental Quality's website at htt s://de .ne. ov/about/divisions/ener -mineral-land-resources/ener -mingral-land- ermits/stormwater- ermitslconstruction-sw Please call me if you have any questions or comments. Sincere y, Sila Vlac ou, EI Engineering Services Department (336) 883-3197 cc: File, Engineer — Connor Peacock, c/o DMP Engineering, 6415 Old Plank Rd., High Point, NC 27265 (via email) 0 City of High Point, P.O. Box 230, 211 South Hamilton Street, High Point, NC 27261 USA Fax:336.883.4118 Phone:336.883.3194 TDD:336.883.8517