Loading...
HomeMy WebLinkAboutNCG160109_DMR_20200828Semi-annual Stormwater Discharge Monitoring Report (DMR) for North Carolina DEMLR General Permit No. NCG160000 - Asphalt CERTIFICATE OF COVERAGE NO. NCG16 0109 FACILITY NAME Fred Smith Company -Westgate Asphalt Plant COUNTY Wake PERSON COLLECTING SAMPLES Jackson Cates LABORATORY ENCC Lak Comments on sample collection or analysis: None Date submitted 08/2812020 Cert.# C317045 -ECP INI SEP 0 8 2020 SAMPLE COLLECTION YEAR Year 2 Period 1 SAMPLE PERIOD ❑ Jan -June M July -Dec or ❑ Monthly' (month) DISCHARGING TO CLASS ❑ORW ❑HQW ❑Trout ❑PNA ❑Zero -flow ❑Water supply ❑SA [*Other Class e, NSW CENTf2f,, rlLES PLEASE REMEMBER TO SIGN ON THE REVERSE DWR SE=STIO^,' Part A: Stormwater Benchmarks and Monitoring Results No discharge this period?' Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches' Total Suspended Solids Benchmarks =__> - - 100 mg/L or 50 mg/L4 001 08/04/2020 2.1 11 002 08/04/2020 2.1 52 003 08/04/2020 2.1 54 004 08/04/2020 2.1 84 ' Monthly sampling (instead of semi-annual) must begin with the second consecutive benchmark exceedance for the same parameter at the same outfall. 'For sampling periods with no discharge at any single outfall, you must still submit this discharge monitoring report with a check mark here. 'The total precipitation must be recorded using data from an on -site rain gauge. Unattended sites may be eligible for a waiver of the rain gauge 4requirement. See General Permit text, Table 1, identifying the especially sensitive receiving water classifications where the more protective benchmark applies. Note: Results must be reported in numerical format. For example, do not report Below Detection Limit, BDL, <PQL, Non -detect, ND, or other similar non - numerical format. When results are below the applicable limits, they must be reported in the format, "<XX mg/L", where XX is the numerical value of the detection limit, reporting limit, quantitation limit, etc. in mg/L. Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. Permit Date: 08/01/2019-OS/31/2024 SWU-252, last revised 09/04/2019 Page 1 of 2 Part B: Vehicle Maintenance Area Monitoring Results: only for facilities averaging > 55 gal of new oil per month. ❑ No discharge this period?z Outfall No. Date Sample Collected' (mo/dd/yr) 24-hour rainfall amount, Inches3 Non -polar O&G by EPA 1664 (SGT-HEM) Total Suspended Solids New Motor Oil or Hydraulic Oil Usage, Annual average gal/mo Benchmarks =__> - - 15 mg/L 100 /L or 50 mg/L^ - Footnotes from Part A also apply to this Part B Note: If you report a sample value in excess of the benchmark, you must implement Tier 1, Tier 2, or Tier 3 responses. See General Permit text. FOR PART A AND PART B MONITORING RESULTS: A SINGLE BENCHMARK EXCEEDANCE TRIGGERS TIER 1 REQUIREMENTS. 2 EXCEEDANCES IN A ROW FOR THE SAME PARAMETER AT THE SAME OUTFALL TRIGGER TIER 2 REQUIREMENTS. • TIER 3: HAS YOUR FACILITY HAD 4 OR MORE BENCHMARK EXCEEDANCES FOR THE SAME PARAMETER AT ANY ONE OUTFALL? YES ❑ NO ❑� IF YES, HAVE YOU CONTACTED THE DEMLR REGIONAL OFFICE AS REQUIRED BYTHE PERMIT? YES ❑ NO ■❑ REGIONAL OFFICE CONTACT NAME: Mail an oriainal and one coav of this DMR, including all "No Discharae" reports within 30 days o receiptof the lab results (or at end of monitoring period in the case of "No Discharge" reports) to: Division of Water Resources Attn: DWR Central Files 1617 Mail Service Center Raleigh, North Carolina 27699-1617 YOU MUST SIGN THIS CERTIFICATION FOR ANY INFORMATION REPORTED: "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." 08/26/2020 (Date) Permit Date: 08/01/2019-05/31/2024 SWU-252, last revised 09/04/2019 Page 2 of 2