HomeMy WebLinkAbout20211364 Ver 1_PreFiling 30-Day Clock Reached Email_20211016Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Saturday, October 16, 2021 12:01 AM
To: james.mason@threeoaksengineering.com
Cc: Ward, Garcy
Subject: Pre -Filing Time Clock has been reached for 17BP.2.R.90 - 20211364 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for 17BP.2.R.90 that
you submitted on 9/15/2021. The ID number for that project is 20211364, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
For internal use only: Transportation Project
1
DWR Pre -Filing Meeting Request Form
NORTH CAROLINA
ErtWmnmertbl Quallly
ID#*
Regional Office*
Reviewer List*
20211364
Version *
1
Washington Regional Office - (252) 946-6481
Garcy Ward
Pre -Filing Meeting Request submitted 9/15/2021
Contact Name*
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
James Mason
james.mason@threeoaksengineering.com
17BP.2.R.90
NCDOT Highway Division 2
Lenoir
Street Address
2815 Rouse Road Extension
Address Line 2
City State / Province / Region
Kinston NC
Postal / Zip Code Country
28504 USA
Is this a transportation project?* Yes No
Type(s) of approval sought from the DWR:
401 Water Quality Certification - 401 Water Quality Certification -
Regular Express
Individual Permit Modification
Shoreline Stabilization
Does this project have an existing project ID#?*
Yes No
Do you know the name of the staff member you would like to request a meeting with?
Please give a brief project description below and include location information.*
THIS PROJECT IS THE REPLACEMENT OF BRIDGE NO. 530068
ON SR 1515 (ALDRIDGE STORE RD) OVER GROUNDNUT CREEK
NEAR LA GRANGE, LENIOR COUNTY, NC. THE BRIDGE WILL BE
REPLACED IN PLACE WITH MINIMAL STREAM, WETLAND, AND
BUFFER IMPACTS. THREE OAKS ENGINEERING IS ASSISTING
DIVISION 2 WITH AQCUIRING THE PERMITS FOR THIS PROJECT.
IT IS ASSUMED THAT THIS PROJECT WILL BE PERMITTED
UNDER A NWP 3. BASED ON THE IMPACTS, IT DOES NOT
APPEAR THAT WRITTEN AUTHORIZATION WILL BE REQUIRED
FOR EITHER THE SECTION 401 OR BUFFER IMPACTS.
HOWEVER, WE WOULD LIKE CONFIRMATION THAT THIS IS
CORRECT.
Please attach the documentation you would like to have the meeting about.
17BP.2.R.90_Permit Drawings_20210609.pdf 1.79MB
17BP.2.R.90_Permit
Drawi ngs_B U F F E R_20210609. pdf
pdf only
1.14MB
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401
Certification Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting
location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you
can submit an application.
Signature
6 05gred,�rdd
Submittal Date 9/15/2021