Loading...
HomeMy WebLinkAbout20211364 Ver 1_PreFiling 30-Day Clock Reached Email_20211016Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, October 16, 2021 12:01 AM To: james.mason@threeoaksengineering.com Cc: Ward, Garcy Subject: Pre -Filing Time Clock has been reached for 17BP.2.R.90 - 20211364 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for 17BP.2.R.90 that you submitted on 9/15/2021. The ID number for that project is 20211364, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. For internal use only: Transportation Project 1 DWR Pre -Filing Meeting Request Form NORTH CAROLINA ErtWmnmertbl Quallly ID#* Regional Office* Reviewer List* 20211364 Version * 1 Washington Regional Office - (252) 946-6481 Garcy Ward Pre -Filing Meeting Request submitted 9/15/2021 Contact Name* Contact Email Address* Project Name* Project Owner* Project County* Owner Address: James Mason james.mason@threeoaksengineering.com 17BP.2.R.90 NCDOT Highway Division 2 Lenoir Street Address 2815 Rouse Road Extension Address Line 2 City State / Province / Region Kinston NC Postal / Zip Code Country 28504 USA Is this a transportation project?* Yes No Type(s) of approval sought from the DWR: 401 Water Quality Certification - 401 Water Quality Certification - Regular Express Individual Permit Modification Shoreline Stabilization Does this project have an existing project ID#?* Yes No Do you know the name of the staff member you would like to request a meeting with? Please give a brief project description below and include location information.* THIS PROJECT IS THE REPLACEMENT OF BRIDGE NO. 530068 ON SR 1515 (ALDRIDGE STORE RD) OVER GROUNDNUT CREEK NEAR LA GRANGE, LENIOR COUNTY, NC. THE BRIDGE WILL BE REPLACED IN PLACE WITH MINIMAL STREAM, WETLAND, AND BUFFER IMPACTS. THREE OAKS ENGINEERING IS ASSISTING DIVISION 2 WITH AQCUIRING THE PERMITS FOR THIS PROJECT. IT IS ASSUMED THAT THIS PROJECT WILL BE PERMITTED UNDER A NWP 3. BASED ON THE IMPACTS, IT DOES NOT APPEAR THAT WRITTEN AUTHORIZATION WILL BE REQUIRED FOR EITHER THE SECTION 401 OR BUFFER IMPACTS. HOWEVER, WE WOULD LIKE CONFIRMATION THAT THIS IS CORRECT. Please attach the documentation you would like to have the meeting about. 17BP.2.R.90_Permit Drawings_20210609.pdf 1.79MB 17BP.2.R.90_Permit Drawi ngs_B U F F E R_20210609. pdf pdf only 1.14MB By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature 6 05gred,�rdd Submittal Date 9/15/2021