Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0024602_Regional Office Historical File Pre 2018
No Pat McCrory Governor h Carolina Department of Environment and Natural Resources April 20, 2015 Mr. Kenneth GUI Olympic Corporate Center II, LLC 4200 Sandy Porter Road Charlotte, NC 28273 Subject: Permit No.WQ0024602 Modification Olympic Corporate Center Building 2 Wastewater Collection System Extension Permit Mecklenburg County Dear Mr, Gill: Donald R. van der Vaart Secretary In accordance with your application received April 9, 2015, we are forwarding herewith a modification to Permit No.WQ0024602 dated April 20, 2015, to Olympic Corporate Center 11, LLC (Permittee) for the construction and operation upon certification of the subject wastewater collection system extension. This permit shall be effective from the date of issuance until rescinded, shall void Permit No, WQ0024602 issued November 19, 2004, and shall be subject to the conditions and limitations as specified therein. This cover letter shall be considered a part of this permit and is therefore incorporated therein by reference, This permit was originally issued on November 19, 2004, and allowed the construction of 80 linear feet of 6-inch gravity sewer and 1,686.09 linear feet of 8-inch gravity sewer with a flow of 18,480 gallons per day. This modification increases the length of 8-inch gravity sewer by 355 linear feet for a total of 2,041 linear feet of 8-inch gravity sewer. Please pay particular attention to the following conditions contained within this permit: Condition 11.1: This permit shall not be automatically transferable; a request must be made and approved. Condition 11,4: Requires that the wastewater collection facilities be properly operated and maintained in accordance with 15A NCAC 2T ,0403 or any individual system -wide collection system permit issued to the Permittee. It shall be responsibility of the Permittee to ensure that the as -constructed project meets the appropriate design criteria and rules. Failure to comply may result in penalties in accordance with North Carolina General Statute §143-215.6A through §143-2.15.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. Mooresville Regional Office 610 East Center Avenue, Suite 301, Mooresville, NC 28115 Phone: 704-663-1699 \ Fax 704-663-6040 \ Customer Service 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity \ Affirmative Action Employer— Made in part by recycled paper Olympic Corporate Center U, LL[ Permit Nn.uVQ0024602K4OD|F{CAT|ON , If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adUmdicatnry hearing upon written request within 30 days following receipt of this permit. This request must be inthe form of written petition, conforming to Chapter 150B of North Carolina General Statutes, and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC27G90-6714 Unless such demands are made, this permit shall befinal and binding. Ifyou need additional information concerning this matter, please contact Barry Love at(704)23S`I143 orvia e-mail atbarryJnve@ncdencgov. for S. Jay Zimmerman, Director Division of Water Resources, NCDENR byMichael Parker, Regional Supervisor Water Quality Regional Operations Section Mooresville Regional [)fMoe Division of Water Resources, NCDENR cc: Jeffery C. Urobonn, P.E. (electronic copy) Barbara Gross (electronic copy) Tommy Rowland (electronic copy) Regional Office Files Water Resources Central Files PER[S(electronic copy) Page 2ofR F1bENR STATE OF NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES WASTEWATER COLLECTION SYSTEM EXTENSION PERMIT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations, permission is hereby granted to the Olympic Corporate Center II, LLC Mecklenburg County for the construction and operation of approximately 2041 linear feet of 8-inch gravity sewer and 80 linear feet of 6-inch gravity sewer as part of the Olympic Corporate Center Building 2 project, and the discharge of 18,480 gpd of collected domestic wastewater into the Charlotte Water existing sewerage system, pursuant to the application received April 9, 2015, and in conformity with 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted March 4, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting data subsequently filed and approved by the Department of Environment and Natural Resources and considered a part of this permit. This permit was previously issued on November 19, 2004, for 80 linear feet of 6-inch gravity sewer and 1,686.09 linear feet of 8-inch gravity sewer and a flow of 18,480 gallons per day, to serve office buildings. This modification is for the addition of 355 linear feet of 8-inch gravity sewer. This permit shall be effective from the date of issuance until rescinded and shall be subject to the ified conditions and limitations contained therein. or S. Jay Zimmerman, Director Division of Water Resources, NCDENR By Authority of The Environmental Management Commission Permit Number: Permit Issued: WQ0024602 MODIFICATION April 20, 2015 Page 3 of 8 SUPPLEMENT TO PERMIT COVER SHEET Olympic Corporate Center II, LLC is hereby authorized to: Construct, and then operate upon certification the aforementioned wastewater collection extension. The sewage and wastewater collected by this system shall be treated in the Charlotte Water McAlpine Creek Wastewater Treatment Facility in accordance with Permit Number NC0024970. Permitting of this project does not constitute an acceptance of any part of the project that does not meet 15A NCAC 2T; the Division's Gravity Sewer Minimum Design Criteria adopted March 4, 1996 as applicable; and the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable, unless specifically mentioned herein. Division approval is based on acceptance of the certification provided by a North Carolina -licensed Professional Engineer in the application, It shall be the Permittee's responsibility to ensure that the as -constructed project meets the appropriate design criteria and rules, Construction and operation is contingent upon compliance with the Standard Conditions and any Special Conditions identified below. SPECIAL CONDITIONS This permit shall become voidable unless the agreement between Olympic Corporate Center II, LLC and Charlotte Water for the collection and final treatment of wastewater is in full force and effect. [15A NCAC 02T.0304(h)] 2. No flow in excess of the quantity permitted herein, 14,480 GPD, shall be made tributary to the subject sewer system until an application for permit modification for an increase in flow has been submitted to and approved by the Division. [15A NCAC 02T.0304(b)] 11. STANDARD CONDITIONS This permit is not transferable. In the event there is a desire for the wastewater collection facilities to change ownership, or there is a name change of the Permittee, a formal permit request shall be submitted to the Division accompanied by documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request shall be considered on its merits and may or may not be approved. [15A NCAC 02T.0104; G.S 143-215.1(d3)] 2. This permit shall become voidable unless the wastewater collection facilities are constructed in accordance with the conditions of this permit; 15A NCAC 2T; the Division's Gravity Sewer Miiinimum Design Criteria adopted March 4, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials unless specifically mentioned herein, [15A NCAC 02T.0110] This permit shall be effective only with respect to the nature and volume of wastes described in the application and other supporting data. [15A NCAC 02T .0110] Page 4 of 8 I 4. The wastewater collection facilities shall be properly maintained and operated at all times. The Permittee shall maintain compliance with an individual system -wide collection system permit for the operation and maintenance of these facilities as required by 15A NCAC 2T .0403. If an individual permit is not required, the following performance criteria shall be met: [15A NCAC 02T .0108(b)]: a. The sewer system shall be effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. b. A map of the sewer system shall be developed and shall be actively maintained. c. An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. d. Pump stations that are not connected to a telemetry system shall be inspected every day (i.e. 365 days per year). Pump stations that are connected to a telemetry system shall be inspected at least once per week. e. High -priority sewer lines shall be inspected at least once per every six -months and inspections are documented. f. A general observation of the entire sewer system shall be conducted at least once per year. g. Overflows and bypasses shall be reported to the appropriate Division regional office in accordance with 15A NCAC 2B .0506(a), and public notice shall be provided as required by North Carolina General Statute §143-215.1C. h. A Grease Control Program is in place as follows: 1. For public owned collection systems, the Grease Control Program shall include at least biannual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. 2. For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. 3. Grease education materials shall be distributed more often than required in Parts (1) and (2) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. i. Right-of-ways and easements shall be maintained in the full easement width for personnel and equipment accessibility. j. Documentation shall be kept for Subparagraphs (a) through (i) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. Page 5 of 8 5. The Pennh1eeshaU report by telephone to v water resources staff member attNa Mooresville Regional Office, telephone number (704)@53'1,699, ausoon as possible, but in no case more than 24, following the occurrence or first knowledge of the occurrence of either of the following: a. Any process unit failure, due to known or unknown reasons, that renders the facility incapable of adequate wastewater transport' such as mechanical or electrical failures of pumps, line blockage urbreakage, etc.;or b. Any 3SOand/or spill over 1,O00gallons; nr c. AmySSO and/or spill, reQa,d|egmfvolume, that reaches surface water Voice mail messages or faxed information is permissible, but this shall not be considered as the initial verbal report. Overflows and spills occurring outside normal business hours may also be reported to the Division of Emergency Management attelephone number (900) 868-0360 or(919) 733'3300. Persons reporting any ofthe ab�nveoccurrences shall file a spill report bycompleting and submitting Part | of Form [S'SSQ (or the most current Division approved form) within five days following first knowledge mfthe occurrence, This report must outline the actions taken orproposed to be taken to ensure that the problem does not recur. Part || of Form CS-SSQ (of the most current Division approved form) can also be completed to show that the SSO was beyond control. [G.S. 143- 215.1C(al)] 6. Construction ofthe gravity sewers, pump stations, and force mains shall be scheduled so as not to interrupt service by the existing utilities nor result in an overflow or bypass discharge of wastewater tnthe surface waters pfthe State. [15ANCA[02T.OI00<b\} 7. Upon completion of construction and prior to operation of these permitted facilities, the completed Engineering Certification form attached to this permit shall be submitted with the required supporting documents tothe address provided onthe form. Acomplete certification isone where the form is fully executed and the supporting documents are provided as applicable. Any wastewater flow made, tributary to the wastewater collection system extension prior to completion of this Engineer's Certification shall be considered aviV|ation of the permit and shall subject the permltteetoappropriate enforcement actions. If the permit is issued to a private entity with an Operational Agreement, then a copy of the Articles of Incorporation, Dec aration »/Covenants/Restrirdons, and Bylaws that have been appropriately filed with the applicable Count\/sRegister mf Deeds office shall be submitted with the certification. Acomobete certification is one where the form isfully executed and the supporting documents are provided asapplicable. Supporting documentation shall include the following: n, One copy ofthe project construction record drawings (plan & profile views of sewer lines & force nnolms) of the wastewater collection system extension. Final record drawings should be clear on the plans oron digital media (CD or BVD disk) and are defined as the design drawings that are marked mpu,annotated with after construction information and show required buffers, separation distances, material changes, etc. b. One copy of the supporting applicable design calculations including pipe and pump sizing, velocity, pump cycle times, and level control settings, pump station buoyancy, wet well storage, surge protection, detention time in the wet well, and force main, ability to flush low points in Page 6 of 8 source or pUTmp is dedicated to multiple stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, include travel timeframes, shall be provided. c. Changes to the project that do not result in non-compliance with this permit, regulations, or the Minimum Design Criteria should be dearly identified on the record drawings, on the certification in the space provided, or in written summary form. Prior to Certification (Final or Partial): Permit modifications are required for any changes resulting in non-compliance with this permit (including pipe length increases of 10% or greater, increased flow, pump station design capacity design increases of 5% or greater, and increases in the number/type of connections), regulations, or the Minimum Design Criteria. Requested .modifications or variances to the Minimum Design Criteria will be reviewed on a case -by -case basis and each on its own merit. Please note that variances to the Minimum Design Criteria should be requested and approved during the permitting process prior to construction. After -construction requests are discouraged by the Division and may not be approved, thus requiring replacement or repair prior to certification & activation. [15A NCAC 02T .0116] 8. Gravity sewers installed greater than ten percent below the minimum required slope per the Division's Gravity Sewer Minimum Design Criteria shall not be acceptable and shall not be certified until corrected. If there is an unforeseen obstacle in the field where all viable solutions have been examined, a slope variance can be requested from the Division with firm supporting documentation. This shall be done through a permit modification with fee. Such variance requests will be evaluated on a case -by -case basis. Resolution of such request shall be evident prior to completing and submitting the construction certification. [ 15A NCAC 02T.0105(n)] 9. A copy of the construction record drawings shall be maintained on file by the Permittee for the life of the wastewater collection facilities. [15A NCAC 02T .0116] 10. Failure to abide by the conditions and limitations contained in this permit; 15A NCAC 2T; the Division's Gravity Sewer Design Criteria adopted March 4, 1996 as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Station and Force Mains adopted June 1, 2000 as applicable; and other supporting materials may subject the Permittee to an enforcement action by the Division, in accordance with North Carolina General Statutes §143-215.6A through §143-215.6C, construction of additional or replacement wastewater collection facilities, and/or referral of the North Carolina -licensed Professional Engineer to the licensing board. [15A NCAC 02T .0104; 15A NCAC 02T .0108(b-c)] 11. In the event that the wastewater collection facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement facilities. [15A NCAC 02T .0110; 15A NCAC 02T .0108(b)] 12. The issuance of this permit shall not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by the Division any other Federal, State, or Local government agencies which have jurisdiction or obtaining other permits which maybe required by the Division or any other Federal, State, of Local government agencies. [G.S. 143-215.1(b)] Page 7 of 8 EAST TRACK SEWER ENGINEE NG CERTIFICATION PERMITTEE: PERMIT #: PROJECT: ISSUE DATE: Olympic Corporate Center U. LLC WQ0024602 MODIFICATION Olympic Corporate Center Building 2 April 20, 2015 This project shall not be considered complete nor allowed to operate in accordance with Condition 7 of this permit until the Division has received this Certification and all required supporting documentation, It should be submitted in a manner that documents the Division's receipt. Send the required documentation to' the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary to the wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement actions. The Permittee is responsible for tracking all partial certifications up until a final certification is received, A Final Certification shall be a complete set of record drawings and design calculations regardless of whether partials have been submitted. PERMITTEE'S CEtTIE!CATION I, the undersigned agent for the Permittee, hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein or portions thereof. Printed Name, Title Signature Date ENGINEER'S CERTIFICATION 1, , as a duly registered Professional En neer in the State of North Carolina, having been authorized to observe (f] periodically, ` weekly, full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this permit; 15A NCAC 02T; the Division of Water Resources' (Division) Gravity Sewer Minimum Design Criteria adopted March 4, 1996. as applicable; the Division's Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North Carolina Professional Engineer's Seal w/signature & date: Final [] Partial (include description) Certification Comments, ualrflers (attach if necessary):. NC DWR Water tuatlty Regional Operations Section 610 East Center Avenue, Suite 301, Mooresville, NC 28115 .. ten, ,USE THE TAB KEY TO MOVE FROM FIELD TO FIELD 1. Owner/Permittee: la. _Olympic Corporate Center I LLC Full Legal Name (company, municipality, HOA, utility, etc. 1b. Kenneth Gill, Manger a _ Signing Official Name and Title (Please review 15A N Application Number: (to be completed by DWR) uthorized signing officials) 1c_ The legal entity who will own this system is: © Individual 0 Federal © Municipality 0 State/County 0 Private Partnership 0 1d, 4200 Sandy Porter Road U. Mailing Address 1f. NC 0 z State 1h. 704-461-1324 Telephone 2 Project (Facility) Information: 2a. Olyrnpic Corporate Center Building 2 Brief Project Name (permit will refer to this name) Contact Person: Jeffery C Orsborn, PE Name and Affiliation of Someone Who Can Answer Que 3b, 704-749-1432 Phone Number Project is © New Modification (of an existing permit) Facsimile Owner is El Public (skip to Item B(3)) 1 e. Charlotte City 1 g, 28273 Corporation © Other (specify): RECEIVED/NCDENR!DWR Zip Code steve@islandhotdin E-mail 2b. Mecklenburg nm County Where Project is Located ons About this Application 3c. jorsborn@orsborn-eng.cam E-mail tf Modification, Permit No.: WQ0024602 El Private (go to Item 2(a)) 2a. If private, applicant will be: 0 Retaining Ownership (i e store, church, single office, etc.) or Leasing units (lots, townhomes, etc. - skip to Item B(3)) 0 Selling units (lots, townhomes, etc. - go to item B(2b)) Charlotte Mecklenburg Utilities (MU.) Owner of Wastewater Treatment Facility (WWTF) Treating Wastewater From This Project ItQH)S E t E.GIOP OFFICE 2b, If sold, facilities owned by a (must choose one) 0 Public Utility (Instruction D) a Homeowner Assoc./Developer (Instruction E) 4a_ McAlpine Creek WWTP 4bNC0024970 Name of WWTF WWTF Permit No, 5al© Gravity Owner of Downstream Sewer ;Receiving Sewer Size }0 Force Main S The origin of this wastewater is (check all that apply): j O Residential Subdivision 0 Apartments/Condominiums 0 Mobile Home Park • School © Restaurant Office Unknown Permit # o 0 Retail (Stores, shopping centers) DI Institution © Hospital © Church 0 Nursing Home 0 Other (specify): 7 Volume of wastewater to be allocated or permitted for this part cuter project, 'Do not include future flows or previously permitted allocations uction F 100°/© Domestic/Commercial % Industrial (Attach Description) % Other (Attach Descripti 0 gallons per day If the permitted flow is zero, indicate why: [j Pump Station, Outfall or Interceptor Line where flow will be permitted in subsequent permits that connect to this line Flow has already been allocated in Permit No. WQ0024602 O Rehabilitation or replacement of existing sewer with no new flow expected (see 15A NCAC 02T .0303 to determine if a permit is required) n FTA (I8-1 M3 APPLICATION Page 4 of 6 • Provide the wastewater flow calculations used in determining the permitted flow in accordance with 15A NCAC 2T .0114 for the value in Item B(7) AND/OR the design flow for line or pump station sizing if a reduced or zero flow is being requested in Item B(7), Values other than that in 15A NCAC 2T .0114 (b) and (c) must be supported with actual water or wastewater use data in accordance with 15A NCAC 2T .0114 (f) 18,480 previously permitted Summary of Sewer Lines to Permitt NOTE 1,686 LF perviously permitted, 978 LF perviously certified, 355 LF additional required, for total 2,041 LF_ h additional sheets Length (feet) New Gravity or Additiona Force Main Gravity Summary of Pump Stations wl associated Force Mains to be Permitted (attach additional sheets as necessary) Pump Station Location ID: (self chosen - as shown on plans/map for reference) ongitude: Latitude: Design Flow (MGD) Pump Station Location ID Operational Point' GPM @TDH Power Reliability Option - permanent generator WATS; Force Main Size Force Main Len 2 - portable generator wIMTS (self chosen - as shown on plans/map for reference) ongitude: Latitude: Design Flow (MGD) Operational Point GPM @TDH th Power Reliability Option - permanent generator wIATS; ` Force Main Size Force Main Length 2 - portable generator wfMTS 2. Will the wastewater flow in the proposed sewer lines or pump stations be able to be directed to another treatment facility? Yes No If Yes, permit number of 2nn treatment facility RO — if "yes" to 6,12 please contact the Central Office PERCS Unit) 3. Does the sewer system comply with the Minimum Design Criteria for the Permitting of Pump Stations and,Force Maids (latest version), the Gravity Sewer Minimum Design Criteria (latest version) and 15A NCAC Chapter 2T as applicable?' Yes No If No, please reference the pertinent minimum design criteria or regulation and indicate why a variance is requested. SUBMIT TWO COPIES OF PLANS, SPECIFICATIONS OR CALCULATIONS PERTINENT TO THE VARIANCE WITH YOUR APPLICATION RECEIVEDiNCDENRI o WQROS MOORESVILLE REGIONAL OFFICE FTA 08-13 .A.PPLaC \TIO\ Page 5 of 6 14. Have the following permits/certifications been submitted for approval for the system or project to be served? Wetland/Stream Crossings - General Permit or 401Certification? ❑ Yes ❑ No ® NIA Sedimentation and Erosion Control Plan? Yes ❑ No ❑ N/A Trout Buffer Waiver? ❑ Yes ❑ No NIA Starmwater? lei Yes El No ❑ N/A 15. Does this project include any high priority lines (1A �T volve aerial lines, siphons, or interference manholes)? These lines will be considered high priority and must be checked once every six months Check if Yes: ❑ and provide details: Owner/Permittee's Certification: (Signature of Signing Official and Project Name) i, Kenneth Gill , attest that this application for Olympic Corporate Center Building 2 has been reviewed by me and is accurate and complete to the best of my knowledge, l understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. Note: In accordance with North Carolina General Statutes 143-215,6A and 43-211 B, any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000 well as civil penalties up to $25,000 per violatio Signing Official Sign Date ENGINEERING DESIGN DOCUMENTS MUST BE COMPLETED PRIOR TO SUBMITTAL OF THIS APPLICATION. THESE DOCUMENTS MUST INCLUDE PLAN AND PROFILE OF SEWERS, THEIR PROXIMITY N TO OTHER UTILITIES, DESIGN CALCULATIONS, ETC. REFER TO 15A NQAC 02T .03O5 Z 2 Professional Engineer's Certification. (Signature of Design Engineer and Project Name) 1, Jeffery C. Orsborn attest that this application for Olympic Corporate Center Building 2 has been reviewed by me and is accurate, complete and consistent with the information in the engineering plans, calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations. Gravity Sewer Minimum Design Criteria for Gravity Sewers adopted February 12, 1996, and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains adopted June 1. 2000 and the watershed classification in accordance with Division guidance. Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that l have reviewed this material and have judged it to be consistent with the proposed design. Note: In accordance with NC General Statutes 143-215, .4 and 143-215, 68. any person who knowingly makes any false statement, representation, or certification in any application shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed $10.000 as well as civil penalties up to $25,000 pe effery C. Orsborn Professional Engineer Name 2b. Orsborn Engineering Group Engineering Firm 2c. 610 E. Morehead Street, Suite 106 Maiiing Address 2d. Charlotte City 2g. 704-749-1432 2h Telephone 2e. NC 2f. 28202 State Zip 2i. jorsborn@orsborn-eng.com Facsimile E-mail NC PE Seal, Signature & D FLA 08-1 APPLICATION' R NN PROPOSED „ pFFIVATE," SEWER .. TEN_SiQ,N SITE DATE: CALE: I'° = 5OO' DRAN BY: JA APPROJEDBY: JCO UiDAR`r EXkSTING 'SANITA USGS QUAD MAP EXHIBIT FOR OLYMPIC CORPORATE CENTER - BUILDING 2 CHARLO I 1E, NORTH CAROLINA ORSBORN ENGINEERING GROUP 610 EAST MOREHEAD STREET, SUITE 106 CHARLOTTE, NC 28202 P) 704-749-1432 • F)'704-749-1433 ORSBORN ENGINEERING GROUP Olympic Corporate Center Building 2 Charlotte, North Carolina Project Narrative April 8, 2015 This project was previously permitted, W00024602, for approximately six buildings within a master planned office park. A portion of the system was built and a partial certification was filed. At this time, building 2 is being constructed to add over 115,000 sf to the park, and the sewer is being extended to the final development lot. At full build -out, it is anticipated that this development will include four buildings. However, there are no immediate plans to develop buildings 3 or 4. Pagel 610 EAST MOREHEAD STREET, SUITE 106 • CHARLOTJF, NC 28202 p) 704.749,1432 F )704,749.1433 TRANSMITTAL ORSBORN ENGINEERING GROUP 610 EAST MOREHEAD STREET, SUITE 106 Project: 14006 Olympic Corporate Center Building 2 CHARLOTTE, NORTH CAROLINA 28202 PHONE 704.749.1432 FAX 704.749.1433 To: Fast Track Permitting NCDENR 610 E. Center Ave. Charlotte, NC 28115 y Date: 04.08.2015 1 Sent Via: FedEx Date Description For Approval 0 F• or Your Use [] A• s Requested Applications Fee $480 O For Review and Comment Q Approved as Submitted 9Approved as Noted Call if you need anything else, Copied To: E1V ED/NCDENFI/DWR P R 9 Z' 15 WOROS MOORESVILLEREGION'AL OFFICE El Returned for Corrections LI Returned After Review Resubmit for Approval Central Files: APS — SVVP 4/20/2015 Permit Number WQ0024602 Permit Tracking Slip Program Category Status Project Type Non -discharge Active Major modification Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer barry.love Coastal SWRu1e Permitted Flow 18,480 Facility Version Permit Classification 1.10 Individual Permit Contact Affiliation Facility Name • Olympic Corporate Center Building III Location Address Owner Major/Minor Region Minor Mooresville County Mecklenburg Facility Contact Affiliation Owner Name Olympic Corporate Center 11, LLC Dates/Events Owner Type Non-Govemment Owner Affiliation Steve Craig Manager 801 E Trade St Charlotte NC 28202 Orig Issue 11/19/2004 Scheduled App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 4/9/2015 4/20/2015 4/20/2015 Regulated Activities Requested /Received Events Commercial or industrial, other Wastewater collection Outfall Additional information requested 4/14/15 Additional information received 4/15/15 Waterbody Name Streamlndex Number Current Class Subbasin OLYNIP:6C CORPORATE -CENTER 1 ::LLC - 4200,SANDY. PORTER RD CHARLOTTE; IVC 28273 •15.3/SAU._ , .86 ©laces Environments@ Quality May 10, 201.7 Mr. Kenneth Gill Olympic Corporate Center 11, LLC 4200 Sandy Porter Road Charlotte, NC 28273 SUBJECT: Final Engineering Certification Acknowledgement. Project: Olympic Corporate Center Building 2 Permit No. WQ0024602 Modification Permittee: Olympic Corporate Center II,. LLC County: Mecklenburg Dear Mr. Gill: OY COOPER %rev ernotr MICHAEL S. REGAN Sec:reiarl= S. JAY ZIMMERMAN Director The Division of Water Resource's Mooresville Regional Office received the final engineering certification with record drawings for the subject sewer extension project on May 9, 2017. Enclosed is a certification page for your records. A full review of the certification materials may or may not be conducted. It is assumed that receipt of this certification indicates compliance with all regulations, design criteria and the permit. However, if a full technical review is conducted, you will be notified of any items of noncompliance. Please be reminded that the Permittee is responsible for keeping a copy of the final record drawings for the life of the project. if you have not received such copy from your consultant, please contact them immediately to obtain a copy. Lastly, you are receiving this letter because the Division has you listed as the responsible party, If this permitted system is no longer owned by you or your company, please complete Form PNOC.F since the permit is not automatically transferable. Form PNOCF can be downloaded from http://portal.ncdenr.orglweb/wq/swp/ps/es/pnoc from the Collection Systems Applications page. Should you have any questions, please do not hesitate to contact me at (704) 235-2143,. Barry Love Environmental Speci cc: Jeffery C. Orsbom, P.E., (Orsbom Engineering Group, 610 E. Morehead Street, Suite 106, Charlotte, NC 28202) Central. Files MRO Nothing Compares`"_,. State of North Carolina i Environmental Quality I Water Resources {Wateity Regional Operations Mooresville Regional Office J 610 East Center Avenue, Suite 301 I Moore ville, North Carolina 28115 704-663-1699 ° ` FAST TRACK SEWER ENGINEERING CERTIFICATION PERKdQTEE: Olympic Corporate Center U, LL[ PERyN[[#: VVQ00I4602 MODIFICATION PROJECT: Olympic Corporate Center Building ISSUE DATE: May 3'2BI7 This project shall not beconsidered complete nor allowed tmoperate |naccordance with Condition 7of this permit until the Division has received this Certification and all required supporting documentation. It should be submitted in a manner that documents the Division's receipt. Send the required documentation to the Regional Supervisor, Water Quality Regional Operations Section at the address at the bottom. Any wastewater flow made tributary tothe wastewater collection system extension prior to completion of this Certification shall be considered a violation of the permit and shall subject the Permittee to appropriate enforcement :c1iwos. The Permittee is responsible for tracking all partial certifications up until afinal certification is received. AFinal Certification shall be complete set o/record drawings and design calculations regardless mfwhether partials have been submitted, PEnmnTEE~5CEnnF|CATmx Lthe undersigned agent for the Pennhtee,hereby state that this project has been constructed pursuant to the applicable standards & requirements, the Professional Engineer below has provided applicable design/construction information to the Permittee, and the Permittee is prepared to operate & maintain the wastewater collection system permitted herein rti o therepf, ��� ^~ L /��^����+ � ��� Printed Name, Title Signature Date ENGINEER'S CERTIFICATION |, C'- ' as a duly registered Professional E rinthe State of North Carolina, havKng be authorized to observe (�� periodically, | | weekly,�l full time) the construction of the project name and location as referenced above for the above Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance of this pe/mit� 15A N[AC 02T; the Division ofWater Resources' (Dlvisipn)Gravity Sewer Minimum Design Criteria adopted March 4, 1996 as applicable; the Division's Minimum Design [rite/la for the Fast -Track Permitting ofPump Stations and Force Mains adopted June 1, 2000 as applicable; and other supporting materials. North [anm||na Professional Engineer's Sea] w/ |goatune&date- Final | ] Partial (include description Certification Com a|UOero(attach|fnecessary): NC DWR—m$ter Quality Regional Operations Section 510East Center Avenue, Suite 301,MooresviUe, NI[28lI5