HomeMy WebLinkAboutNCC200195_NOT Closeout Documents_20211019North Carolina Department of Environmental Quality
Land Resources: 610 East Center Avenue, Suite 301, Mooresville, NC 28115 (704) 663-1699
County: Union Project: Union County-CDBG Hwy 218 Water River basin: Yadkin-PeeDee
Person financially responsible: Union County -John Shmak, CIP Program Manager Project #: UNION-2020-049
Address: 500 North Main Street, Suite 600, Monroe, NC 28112
1. Project Location: Highway 218, NewSalem
Pictures: No
2. Weather and soil conditions: Sunny, no activity
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: October 18, 2021
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process. If you have any questions, please
contact me at Lily.KayAncdenr.gov or by phone at (704) 235-2137.
Reported by: Lily Kay Others present:
Date of inspection: October 13, 2021 Time arriving on site: 1:40 PM Time leaving site: 2:00 PM
cc:
Yes