Loading...
HomeMy WebLinkAboutNCC200055_NOT Closeout Documents_20211019ROY COOPER Governor ELIZABETH S. BISER Secretary BRIAN WRENN Director Town of Red Springs Attn: David Ashburn, Manager P.O. Box 790 Red Springs, NC 28377 NORTH CAROLINA Environmental Quality October 11, 2021 INSPECTION REPORT RE: Project Name: 2020 USDA Water Distribution System Project ID: ROBES-2020-007 County: Robeson Dear Mr. Ashburn: Attached is a copy of the inspection report prepared following an onsite inspection of the above referenced project. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973. Please review this report carefully as it may contain corrective actions needed or comments, which will assist you in meeting the required performance standards of the Act. It is our desire that any, and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact Nicholas Mills, at this office if you have any questions. Enclosure: Inspection Report D � North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources Fayetteville Regional Office 1 225 Green Street, Suite 714 1 Fayetteville, North Carolina 28301 NORTH GARGL NA ~ o."dm tme"_—Uiou.i� /� 910.433.3300 North Carolina Department of Environmental Quality Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094 (910) 433-3300 County: Robeson Project: 2020 USDA Water Distribution System River basin: Lumber Person financially responsible: Town of Red Springs -David Ashburn, Manager Project #: ROBES-2020-007 Address: P.O. Box 790, Red Springs, NC 28377 1. Project Location: See Plans, Red Springs Pictures: No 2. Weather and soil conditions: Clear Soil Workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name). None Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: October 08, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Forms/NCGGI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Nicholas Mills Otbers present: Date of inspection: October 06, 2021 Time arriving on site: 10:00 AM Time leaving site: 11:30 AM cc: