Loading...
HomeMy WebLinkAbout20211505 Ver 1_PS 60% & AA draft_20211013REVIEW DOCUMENTATION FORM (Offices may use variations of this form as long as all information is on the form) DESCRIPTION 605 Design and AA Draft Submital ISSUE DATE 4.13.2021 PROJECT NO. 183-1-802 AUTHOR Sarah Rauch PROJECT MGR Clark Chewing PRINCIPAL Kevin Thomas QUALITY MGR Kevin Thomas FILE LOCATION DRAFT P:\2018\183-802\-Draft Documents\Individual Permit\AA\DRAFT REPORT FINAL P:\2018\183-802\-Final Documents\Individual Permit\AA\DRAFT REPORT FOR PROPOSALS — TYPE OF TERMS & CONDITIONS TO BE ATTACHED ❑ ENVIRONMENTAL ❑ GEOTECHNICAL ❑ SURVEY ❑ MSA OTHER FEE SCHEDULE ❑ STD ❑ MID ❑ LOW TECHNICAL REVIEWS (Reviewers shall indicate each item reviewed and sign) Link to Quality Policies PROPOSAL CALCULATION (See Signatory Authority Matrix) Software Used: N/A N/A Purpose ❑ Cost ❑ Method ❑ ❑ Input ❑ ❑ Scope ❑ Schedule ❑ Assumptions ❑ ❑ Output ❑ Calc Guidance ❑ Signature Signature TECHNICAL SPECIFICATION / PROTOCOL REPORT (Project Manager 111 or above) (Project Manager 111 or above) (Format, Technical Content, Measurement/Payment) (Conclusions, Recommendations, Appendices) Signature Signature Kevin Thomas n ma=@ e° CAD/GIS DRAWING SIGNATURE VERIFICATION GENERAL CORRESPONDENCE (PM 11 or above, or designated Quality Manager) (PM or above) Signature Signature OTHER Signature ALL DOCUMENTS MUST HAVE AT LEAST ONE SIGNATORY PRIOR TO RELEASE OUTSIDE OF CEC SIGNATORY AUTHORIZATION 1 SIGNATORY AUTHORIZATION 2 Kevin Thomas oN Ke° Tn ma=m°= «°m ° QUALITY MANAGER SIGNATURE Kevin Thomas ° a= °0 ° °E CEC Quality Policy PM-01 Form Revision No. 1 Feb 2018