I met with field staff on August 30, 2021 regarding the visit to the NC119 C203844 project on
August 26, 2021 and discussed recommendations provided on August 27, 2021. All
recommendations were completed and the below photo documentation was taken on 8-31-
2021. Please advise if you need anything further at this time.
AUGUST 31, 2021:
Sincerely,
John Howell
Resident Engineer
Division 7 - District 1
North Carolina Department of Transportation
336-570-6830 Office
jhowell@ncdot.gov
115 East Crescent Square Drive
P.O. Box 766
Graham, NC 27253
From: Conchilla, Ryan <ryan.conchilla@ncdenr.gov>
Sent: Friday, October 8, 2021 12:38 PM
To: Parker, Jerry A <japarker3@ncdot.gov>; 'dmoore@rkk.com' <dmoore@rkk.com>; Howell,
John <jhowell@ncdot.gov>
Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Subject: Mebane Bypass- inspection follow-up
Jerry,
Good afternoon. I'm following up on the repairs and recommendations provided below.
If you can provide a status update on this area with corresponding photos of the repairs, I'd
appreciate it.
Thanks -
Ryan Conchilla, PWS
Environmental Specialist II
401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8)
Division of Water Resources, NC Department of Environmental Quality
Ryan.ConchillaPncdenr.gov
From: Conchilla, Ryan
Sent: Friday, August 27, 2021 10:57 AM
To: Parker, Jerry A <japarker3@ncdot.gov>; 'dmoore@rkk.com' <dmoore@rkk.com>; Howell,
John <jhowell@ncdot.gov>
Cc: Wanucha, Dave <dave.wanucha@ncdenr.gov>
Subject: Mebane Bypass- inspection follow-up
Jerry/Della,
Good morning. A site inspection was performed yesterday and we have the following
recommendations:
At Station 25.75- The 36"concrete pipe outlet (see attached photo, looking east).
Improvements to this area (dip-out/seeding/matting) should be made to minimize impact into
the adjacent JS until the permanent tail ditch is constructed. A wetland or seasonal seed mix
may be needed.
Per our meeting with Travis, the NPDES records moving forward should also include an
additional line item for observations of the turbidity curtain. Let me know if you have
questions.
Ryan Conchilla, PWS
Environmental Specialist II
401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8)
Division of Water Resources, NC Department of Environmental Quality
Ryan.Conchilla@ncdenr.gov
« File: Station 25_75 Ieft.JPG »
Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties.