Loading...
HomeMy WebLinkAboutWQ0042696_Application (FTSE)_20210823Permit Number WQ0042696 Program Category Non -discharge Permit Type Gravity Sewer Extension. Pump Stations, & Pressure Sewer Extensions Primary Reviewer tyler.benson Coastal SWRuIe Permitted Flow Facility Central Files: APS _ SWP 7/23/2021 Permit Tracking Slip Status Project Type In review New Project Version Permit Classification A Individual Permit Contact Affiliation Facility Name Major/Minor Region East Coast Migrant Head Start Private Sewer Minor Wilmington Location Address County Fender Owner Owner Name The East Coast Migrant Head Start Project Facility Contact Affiliation Owner Type Non -Government Owner Affiliation Steven C. Mayne 2301 Sugar Bush Rd DatesiEvents Raleigh NC 27612 Scheduled Ong Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 7/20/2021 State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 - FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: W x&7✓,r.�_6 QC (to be completed by DwR) All items must be completed or the application will be returned 1. APPLICANT INFORMATION: 1. Applicant's name: The East Coast Migrant Head Start Project (company, municipality, HOA, utility, etc.) t4thW.r2. Applicanttype: ❑ Individual ®CorporahoEl General Partnership ❑Privately -Owned Public Utility ❑ Federal ❑ State/County ❑ Municipal ❑ Other 3. Signature authority's name: Steven C. Mayne per 15A NCAC 02T .0106(b) Title: Chief Financial Officer 4. Applicant's mailing address: 2301 Sugar Bush Road, Suite 400 City: Raleigh State: NC Zip: 27612- 5. Applicant's contact information: Phone number: (919) 926-3365 Email Address: smayne e ECMHSP.org II. PROJECT INFORMATION: I. Project name: East Coast Migrant Head Start pseiect i�r`evok2 �e t R 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Pender ,3� �g�a l7r) Fq � qt) 4. Approximate Coordinates (Decimal Degrees): Latitude: 0Longitude: - 5. Parcel ID (if applicable): Tract 1: 3233-44-3734-0000 & Tract 2: 3233-45-4179-0000 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: John S. Tunstall P.E.License Number: 19851 Firm: Norris & Tunstall Consulting Engineers, P.C. Mailing address: 2602 Iron Gate Drive, Suite 102 City: Wilmington State: NC Zip: 28412- Phone number: 9( 10) 343-9653 Email Address: Tunstall .ntengineers.com & anorris@ntengineers.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: I. Facility Name: James A. Loughlin (Northside) W WTP Permit Number: NPDES NC 0023965 Owner Name: Cape Fear Public Utility Authority V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): W00020849 System Wide Collection System Permit Number(s) (if applicable): WQCS D0524 Owner Name(s): Pender County Utilities FORM: FTA 04-16 Page I of 5 'VI, GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes [-]No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? [-]Yes []No ®N/A 3. If the Applicant is a Home/Property Owners' Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes [-]No ®N/A 4. Origin of wastewater: (check all that apply): ❑ Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ® School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 % Domestic/Commercial % Commercial % Industrial (See 15A NCAC 02T .0103(20)) ►.Is there a Pretreatment Program in effect? ❑ Yes ❑ No 6. Hasa flow reduction been approved under 15A NCAC 02T .0114(fl? ❑ Yes ❑ No ➢ If yes, provide a copy of flow reduction aooroval letter 7. Summarize wastewater generated by project: Establishment Type (see 021.0114(fl) Daily Design Flow',' No. of Units Flow Daycare & Preschool 25 gal/Person 98 2,450 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 2,450 GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S. 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 2 450 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VIL GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): I. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8" 450 PVC ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - ° 3. Design flow of the pump station: millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): gallons per minute at feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B),. ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 lX. SETBACKS & SEPARATIONS -(02B .0200 & 15A NCAC 02T .0305(t)): 1. Does the project comply with all separations found in 15A NCAC 02T .0305(f) & (g) ➢ 15A NCAC 02T.0305(fl contains minimum separations that shall be Drovided for sewer systems: N Yes [-]No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class 11 impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36inches ➢ 15A NCAC 02T.0305(a) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpaee ➢ If noncompliance with 02T.0305( or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes [-]No ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 02B .0200? N Yes ❑ No ➢ This would include Trout Buffered Streams per 15A NCAC 213.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? N Yes [-]No ➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters ➢ Information can be obtained from the 401 & Buffer PermittingBranch ranch 5. Does project comply with 15A NCAC 02T.0 I 05(c)(6) (additional permits/certifications)? N Yes [-]No Per I5A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stonnwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑ Yes N No ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERPIFICATIONS: Does the submitted system comply with I SA NCAC 02T, the Minimum Desian Criteria for the Permitting of Pump Stations and Pane Mains (latest version), and the Gravely Sewer Minimum Desian Criteria (latest version) as applicable? myes ❑ No If No, complete and submit the Variance/Alternative Design Request application (VADC 10.14) and supporting documents for review. Atsroval of the request is required otter to submittal of the Fast Track Application and surportine documents 2. Professional Engineer's Certification: name from Application item III.1.) this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.613, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T.OI06(b): ' 1 r attest that this application for (Signature Authority's qa e & itle firm Application Item 1.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. 1 understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. 1 well make no clalm against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not Included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215,61). any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed S 10,0190 as well as civil penalties up to $25,000 per violation. Signature: Q Date: p a FORM: FTA 04-16 Page 5 of 5 State of North 1Ca�o�,i Department of Environmental Quality Division of Water Resources „ Flow Tracking for Sewer Extension Applications L (FTSE 10-18) Entity Requesting Allocation: The East Coast Migrant Head Start �Yll\ CC7 Project Name for which flow is being requested: East Coast Migrant Head Start 14i f f k T More than are FTSE maybe rewired for a single project If the owner of line WWTP is not responsiblefor all pomp stations along the route of 11te proposed wastewater flow. 1. Complete this section only if you are the owner of the wastewater treatment plant. a. W WTP Facility Name: b. W WTP Facility Permit #: Al! flows are its MGD c. W WTP facility's permitted flow d. Estimated obligated flow not yet tributary to the W WTP e. W WTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility h. Percent of permitted flow used H. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the W WTP: (A) (B) Design Pump Pump Average Approx. Station Station Firm Daily Flow" Current (Name or Permit Capacity, • (Finn / pO, Avg. Daily Number) No. MGD MGD Flow, MGD f W & norm A2COU419 042-6 0, 7-50 Or 03? (C) (D)=(B+C) (E)=(A-D) Obligated, Not Yet Total Current Tributary Flow Plus Daily Flow, Obligated Available MGD Flow Capacity"* 0,041 0-m o,I&q * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pt) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): NOr-45J, WWTP Downstream Permit Number: NCOO23145 Page 1 of 6 FTSF, 10-I8 III. Certification Statement: KO- ,lne4'� F. { -e e) certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and Il plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to trans967t and treat the proposed new wastewater. Title of Signing 11 zl Dare Page 2 of 6 FTSE 10-18 NORMS & TUNSTALL CONSULTING ENGINEERS P.C. 2602 Iron Gate Drive, Suite 102 Wilmington, NC 28412 (910) 343-9653 (910) 343-9604 Fax John S. Tunstall, P.E. T. Jason Clark, P.E. Rohhic P. I Iennell}S E.I. July 15, 2021 NC DEQ Division of Water Resources Water Quality Regional Operations Section Wilmington Regional Office 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Gravity Sewer Extension Fast -Track Permit Application East Coast Migrant Head Start Project Hwy. 117 & Old Blossom Ferry Road Pender County N&T Project No. 20143 Dear Sir or Madam: 1429 Ash -Little River Road .ash, NC 28420 (910) 287-5900 (910) 287-5902 Fax J. Phillip Norris, P.E. Joseph K. Bland, P.E. Thomas J. Schectz, L.I. JUL 2 0 2021 opmtwa secom WAWOM sib Enclosed electronically is the application, Sewer Narrative, Flow Tracking / Acceptance Form (FTSE 10-18) from Pender County Utilities, 8 Yz x 11 color USGS Topographic Map, site plan (ledger size), and a $480.00 check (to be mailed in) for the processing fee. Please review this information for approval and contact us with any questions or comments you may have. Thank you for your assistance on this project. Sincerely, NORRIS & TUNSTALL CONSULTING ENGINEERS, P.C. - S . 501� Jo S. Tunstall, P.E. JST/asn 20143 07-15-21-s-swr-Itr Enclosures cc: Steven Mayne, CFO / The East Coast Migrant Head Start Project (By E-Mail Only) Ted Hoffman, Architect (By E-Mail Only) NCBELS License C-3641 Division of Water Resources State of North Carolina Department of Environmental Quality Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-18) Entity Requesting Allocation: East Coast Migrant Head Start Project Project Name for which flow is being requested: East Coast Migrant Head Start Project More than one FTSE maybe required far a single project if the owner of the WWTP is not responsible for all pump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: James A. Loughlin (Northside} b. WWTP Facility Permit #: NPDES NC 0023965 c. WWTP facility's permitted flow d. Estimated obligated flow not yet tributary to the WWTP e. WWTP facility's actual avg. flow f. Total flow for this specific request g. Total actual and obligated flows to the facility It. Percent of permitted flow used WWTP A11 flows are in MGD 16.000 3.705 10.661 0,002450 14.368 89.8 IT. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Obligated, Pump Pump Average Approx. Not Yet Total Current Station Station Firm Daily Flow* * Current Tributary Flow Plus (Name or Permit Capacity, * (Firm / pt), Avg. Daily Daily Flow, Obligated Available Number) No. MGD MGD Flow, MGD MGD Flow Capacity*** * The Firm Capacity (design flow) of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor (pf) not less than 2.5, per Section 2.02(A)(4)(c) of the Minimum Design Criteria. *** A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is < 0. Downstream Facility Name (Sewer): Cape Fear Public Utility Authority_ Downstream Permit Number: Page 1 of 6 FTSE 10-18 I1I. Certification Statement: I Jeff Theberge, CFPUA Eng. Mgr certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible party. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. Title of Signing Page 2 of 6 FTSE 10-18