HomeMy WebLinkAboutSW8010824_Historical File_20011023* * * COMMUNICATION RESULT REPORT ( OCT.24.2001
FILE MODE OPTION
760 MEMORY TeX
REASON FOR ERROR
E-1) HANG UP OR LINE FAIL
E-3) NO ANSWER
ADDRESS (GROUP)
89197331495
P. 1
4:07PM )
T� NCDENR WIRO
RESULT PAGE
--' �-----------------
� OK -- — P. 2/2
E-2) BUSY
E-4) NO FACSIMILE CONNECTION
State of North C=10 1a
DePaftW OfEAV 4ment 4xl41 ia Reoou=4
1 pb4el F. 13gsley, eovermr Wliam G, boss Jr., Sam*47
FAX COVRR SH ET
Date (-)- f
To: ; r
O: 111
FAX #:��������
No. Of Pages; '
From:
CO:—,
�1
�4'#i - Or 5O^ `1'
127 CArdlAfll JprjVv zgenal9p, Wpllpigstppr A1.C. 3004-mg Tdopbope (914) 3964900 FIX (910) dxp, An 291141 OPpprina4lr A irin4pve AWIM Z;npl T
North Carolina u
Department of Environment and Natural Resourc �EP `�
Division of Parks and Recreation 2001
Michael F. Easley, Governor
William G. Ross Jr., Secretary ---------------------
Philip K. McKnelly, Director
MEMORANDUM
TO: Linda Lewis, Environmental Engineer
Division of Water Quality
i
FROM: Brian Strong, Resource Management Specialist �J
Division of Parks and Recreation
'W%DENR
6\01116r
DATE: September 19, 2001
SUBJECT: Request for Exemption from the Stormwater Management Permit Application
Process (Hammocks Beach State Park Boat Ramp and Bulkhead Repairs:
Stormwater Project SW8010824)
The purpose of this memorandum is to request an exemption from the stormwater
management permit requirements for the boat ramp and bulkhead repair project at Hammocks
Beach State Park. The boat ramp at Hammocks Beach has become degraded due to undermining
of the concrete ramp from tidal action. The ramp is used to maintain the state park patrol boats
and the ferry between the mainland and Bear Island. The Division of Parks and Recreation is
proposing to replace only the inclined portion of the boat ramp and no upland areas will be
disturbed. The ramp will be replaced by installing a temporary coffer dam in the water and. de -
watering the area around the ramp (see enclosed schematics). The old ramp will then be
removed and the new ramp will be poured in place. Again, during this process no upland areas
will be disturbed or any vegetation removed. Due to the limited nature of this project we would
request that an exemption from the stormwater permitting process be granted. If you have any
questions regarding this request please contact me at (919) 715-8711.
cc: Jim Pyrtle, Andrew and Kuske Consulting Engineers
Sam Bland, Superintendent Hammocks Beach State Park
Bruce Garner, Project Manager Division of Parks and Recreation
1615 Mail Service Center, Raleigh, North Carolina 27699-1615
Phone:919-733-4181 \ FAX:919-715-3085 \ Internet: www.enr.state.nc.us/ENR/
AN EQUAL OPPORTUNITY \ AFFIRMATIVE ACTION EMPLOYER - 50% RECYCLED / 10% POST CONSUMER PAPER
Lai
Michael F. Easley, Governor
William G. Ross, Jr., Secretary
North Carolina Department of Environment and Natural Resources
September 4, 2001
CERTIFIED MAIL #7001 0320 0003 0382 8188
RETURN RECEIPT REQUESTED
Mr. Brian L. Strong
N.C. Division of Parks & Recreation
1615 MSC
Raleigh, NC 27699-1615
Dear Mr. Stong:
Gregory J. Thorpe, Ph.D., Acting Director
Division of Water Quality
Wilmington Regional Office
Subject: REQUEST FOR STORMWATER
MANAGEMENT PERMIT APPLICATION
Hammocks Beach State Park Boat Ramp and Bulkhead repairs
Stormwater Project No. SW8 010824
Onslow County
On August 22, 2001, the Wilmington Regional Office received a copy of a CAMA/DREDGE & FILL for Hammocks
Beach State Park to replace and expand their Boat Ramp. The North Carolina Administrative Code requires any project that
must receive either Sedimentation and Erosion Control Plan approval and/or a CAMA Major permit to apply for and receive
a Stormwater Management Permit by the Division of Water Quality. Any construction on the subject site, prior to receipt
of the required permit, will constitute a violation of 15A NCAC 2H.1000 and may result in appropriate enforcement action
by this Office.
Either a Stormwater Permit Application Package including 2 sets of plans, completed application form, fee, and
supporting documentation, or a written response regarding the status of this project and the expected submittal date must be
received in this Office no later than September 22, 2001. Failure to respond to this request may result in the initiation of
enforcement action, and construction may experience a subsequent delay.
The NPDES 010000 Federal Stormwater Permit that accompanies the Erosion Control Plan approval letter must NOT
be considered the Coastal Stormwater Management Permit, which will be signed by the Water Quality Supervisor. Please
reference the Project Number above on all correspondence. If you have any questions, please call me at (910)-395-3900.
Sincerely,
4' ! ✓�
7�
Linda Lewis
Environmental Engineer
RSS/arl: S:\WQS\STORMWAT\STORMSUB\010823.Aug
cc: Mitchell Parker, Onslow County Inspections
Jim Gregson
Linda Lc*b
Central Files
N.C. Division of Water Quality 127 Cardinal Drive Extension Wilmington, N.C. 28405 (910) 395-3900
Fax (910) 350-2004 Customer Service
800-623-7748
North Carolina
Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley, Governor
William G. Ross Jr., Secretary
Donna D. Moffitt, Director
E IV Tfl).August 21, 2001
,
U'a 2 2 2001: I
MEMORANDUM:
TO:
FROM:
SUBJECT:
Applicant:
Project Location:
DIVISION O
COASTAL MANAGEMEN
Mr. Greg Thorpe, Acting Director.'
Division of Water Quality
;Doug Huggett
Major Permits Processing Coordinator
LT J.
A4
��,A
NCDENR
CAMA/DREDGE & FILL Permit Application Review
NC Division, of Parks & Recreation/Hammock Beach State Park
Visitor Center
Onslow County, on the mainland opposite Bogue Inlet, east of Queens
Creek on the west end of Swansboro, at the end of SR 1511.
Proposed Pi�6jie6 Proposes to replace and expand their boat ramp, installing a coffer dam
to pour the ramp, and placing rock around the perimeter of the ramp
A. for st oitz�tion.' THe exi..k 0"ead will be replaced.
Please indicate below your agency's position or viewpoint on the proposed project and return
this form by Septembcr.,11, OQ1.: If you have any questions regarding the proposed project,
please contact Tere Barrett a �252) 808-2808 >!`V i'efi' 'p`p opriate, in-depth comments with
supporting data is requested.
REPLY:
This agency has'nb olbjec. ot1 td t�elI, Jj t as:proposed: `� '
This agency has no comment on the proposed project.
Phis a ;gncly approves pf'ithe b'e %n1y 49the recornihediide� changes
are incorporated. See attached.k dd
This agency objects to` the prqjec ` 6t fig 'st ixs:desenbed' in tlYe1ttac'hi
FF:y •a � .� 't ���_ ;'I ,- lj.=v�tltl'.�' +Fi r"4.. °ilisi,l ! �;�di� �•;1 �p�l
SIGNED I F A I I �.<i
I•1aft5r��i'�?�� I('.i4�r �tictrtr.4 � 5x, ��' '�
I �iMorehead City,North aroluia: 28557'
' P''ho'irie,- 15, " 6A� 290W ! FAX: 252=247�=333 s \M Internet:: , http://dcm2.enr.state.nc.us
AN EQUAL O.PPORTUNITY.\ AFFIRMATIVE ACTION EMPLOYER"- 5044'RECYCLED / I0%P6ST COkSU IER PAPER
.� I
Development Type
FEE
DCM %
DwQ
%(14300
1601 435100093 1625 62531
(24300 1602 435100095 2341)
Private, non-commercial
development that does not involve
S250
100% ($250)
0% (SO)
She filling or excavation of any
wetiands or open water areas:
11. Public or commercial development
that does not involve the filling or
$400
100% ($400)
0% $0
( )
excavation of any wetlands or open
water areas:
III. For development that involves the
filling and/or excavation of up to 1
acre of wetlands and/or open water
areas, determine if A, B, C, or D
below applies:
III(A). For Private, non -commensal
development, If General water Quality
S250
100% ($250)
0% SO
( )
Certification No.3301 (see attached)
can be applied:
111(8): For public or commercial
development, if General water Quality
$400
100% ($400)
0% SO
( )
Certification No.3301 (see attached)
can be applied:
III(C). If General Water Quality
Certification No. 3301 (see attached)
could be applied, but DCM staff
determined that additional review and
S400
60% (S240)
40% ($160)
written DWQ concurrence is needed
because of concerns related to writer
quality or aquatic life:
III(D). If General Water Quality
Certification No. 3301 (see attached)
S400
60% ($240)
4C% (S160)
can not be appried:
IV. For development that involves
the filling and/or excavation of more
than one acre of wetlands and/or
$475
60% ($265)
40 (5190)
open water areas:
• Form DCN1-.•1: _
'""XCAVATION
4
..61
AND FILL
(Except bridges and culverts)
Attach this form to Joint Application for CAMA Major
Pei -nit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application that relate to this
proposed project.
Describe below the purpose of proposed excavation or
fill activities. All values to be given in feet.
Access
channel
(MLw) or (NWL)
"Canal
Boat
basin
Boat
ramp
Rock
groin
Rock
breakwater
Rock protec—
tion
Mer
(Excluding
shoreline
5 b1Z-SLion)
Average Final
Existiag Project
1
.�
. .
1 11
F _
vj
.11 Im.
. m
1♦
1
r.
.1
1. EXCAVATION
a. Amount of material to be excavated from below
MHW or NWL in cubic yards 0
b. Type of material to be excavated VGA
c. Does the area to be excavated include coastal
wetlands (marsh), submerged aquatic vegetation
(SAVs) or other wetlands? Yes No
d. Highground excavation in cubic yards VA
2. DISPOSAL OF EXCAVATED
MATERIAL
a. Location of disposal area NIA
b. Dimensions of disposal area
c. Do you claim title to disposal area?
Yes No
If no, attach a letter granting permission from the
owner.
d. Wili a disposal area be available for future
maintenance? Yes No
If yes, where?
Form DC`1-`:LP-2
Does the disposal area include any coastal
(marsh), SAVs or other wetlands?
Yes No
f. Does the disposal include any area in the water?
Yes No
3. SHORELLNE STABILIZATION
a. Type of shoreline stabilization
x Bulkhead Riprap
b. Length
175 linear feet
c. Average distance waaterward of MHW or NWL
d. Maximum distance waterward of MHW. or NWL
0
e.
Shoreline erosion during preceding 12 months
None
(Source of information)
=G Eni
A U.t= 15 2001
If yes, I I
?ASTAL MANAGE�W—, ount of material to be placed in the
MOREHEAD
water 17 cy #57 stone/ 20 cv ric-rap
f. Type of bulkhead or riprap material Fiberglass
bulkhead w/small amount of rip -rap at south
end
g. Amount of fill in cubic yards to be placed below
water level
(1) Riprap 3 cv (south end)
(2) Bulkhead backfill 10 cy
h. Type Of fill material sand, class B rip —rap
i. Source of fill material off site by contractor
4. OTHER FILL ACTIVITIES
(Excluding Shoreline Stabilization)
- Will fill material be brought to site?
x Yes No
b.
(2) Dimensions of fill area 28' x 48' approx.
(3) Purpose -of fill Gravel base for ramp,
rip -rap around ramp base
Will fill material be placed in
(marsh), SAVs or other wetlands?
Yes x No
If yes,
(1) Dimensions of fill area _
(2) Purpose of fill
5. GENERAL
coastal wetlands
a. How will excavated or fill material be kept on site
and erosion controlled? Rip —rap, #57 store,
and sand can be individually stored on
site. Silt fence around sand , as requie-
b. What type of construction equipment will be used
(for example, draglipe, backhoe, or hydraulic
dredge)?
Backhoe or excavator to be used for
—Bulkhead (deadman installation)
c. Will wetlands be cr5ssed in transporting equipment
to project site? Yes x No -
If yes, explain steps that will be taken to lessen
envirorunental impacts.
Emergancy Repairs: Bulkhead and Boa Ram
App' o Projett�isme
Date
Form DCM-MP-4
,iTRUCTURES
(Construction within Public Trust Areas)
Attach this form to Joint Application for CAMA Major
Permit, Form DCM-MP-1. Be sure to complete all
other sections of the Joint Application which relate to
this proposed project.
a. Dock(s) and/or Pier(s)
(1) _ Commercial _Community _ Private
(Z) Number
(3) Length
(4) Width
(5) Finger Piers Yes No
(i) Number
(ii) Length
(iii) Width
(6) Platform(s) Yes No
(i) Number
(ii) Length
(iii) Width
(7) Number of slips proposed
(8) Proximity of structure to adjacent riparian
property lines
(9) Width of water body
(10) Water depth at waterward end of pier at
MLW or NWL
b. Boathouse (including covered lifts)
(1) Commercial Private
(2) Length
(3) Width
C.
Groin (e.g. wood, sheetpile, etc.)
(1) Number
(2) Length(s)
Coffer Dam
d. BvIk3mater (e.g. wood, sheetpile, etc.)
(1) Length 70'
(2) Average distance, from MH h'WI, or
wetlands rangee from and to 2.95
(3) Maximum distance beyon MHti , NWL or
wetlands 4
2001
Mooring buoys
(1) _ Commercial _Community _ Private
(2) Number
(3) Description of buoy
(Color, inscription, size, anchor, etc.)
(4)
(5)
Width of water body
Distance buoy(s) I
shoreline
o be placed beyond
f. Mooring structure (boatlift, mooring pilings, etc.)
(1) Commercial _Community _ Private
(2) Number
(3) Length
(4) Width
g. Other (Give complete description)
Apt or Projec N e
Signature
Date
above(average V beyond)
vov;r;=-q 011a4