DWR Pre-Filing Meeting Request Form
.vaw.d'
NORTH CARO.INA
Errvlronm¢ntrtl Qvofiry
ID#* 20211489 Version* 1
Regional Office* Central Office-(919)707-9000
Reviewer List* Rob Ridings
Pre-Filing Meeting Request submitted 10/5/2021
....................................................................................................................................................................................................................
Contact Name* William Sullivan
Contact Email Address* william.sullivan@kimley-horn.com
Project Name* Northern Durham Parkway
Project Owner* City of Durham;ATTN: Robert Joyner(Robert.Joyner@durhamnc.gov)
Project County* Durham
Owner Address: Street Address
101 City Hall Plaza
Address Line 2
City State/Province/Region
Durham NC
Postal/Zip Code Country
27701 USA
Is this a transportation project?* Yes No
Type(s)of approval sought from the DWR:
401 Water Quality Certification - 401 Water Quality Certification -
Regular Express
Individual Permit Modification
Shoreline Stabilization
Does this project have an existing project ID#?*
Yes No
Do you know the name of the staff member you would like to request a meeting with?
Rob Ridings
Please give a brief project description below and include location information.*
On behalf of the City of Durham, Kimley-Horn is submitting this pre-filing
meeting request for a section of the proposed Northern Durham Parkway
project located in Durham, Durham County, NC.The proposed section
would extend from Ferrell Road south to Cheek Road.The typical section
of the proposed roadway would consist of a 2-lane road with curb and
gutter and a sidewalk facility.The project will be constructed through the
proposed Junction Road and Ferrell Road industrial development and the
road will be built in phases. Phase I will extend from Ferrell Road south to
a point north of Panther Creek and Phase II will extend from Phase I south
to Cheek Road.The project is aligned to tie into previously dedicated right-
of-way on both the north and south termini.The project is located within
the Neuse River Basin(03020101).
Stephanie Goss(NCDWR)conducted a field review to determine which
streams in the project area are subject to the Neuse River Basin Buffer
Rules and to identify isolated wetlands that may be subject to State
regulation on March 8, 2021(NBRRO#21-004).Additionally,April Norton
(USACE)issued a Preliminary and Approved Jurisdictional Determination
for the covering the proposed roadway on April 9,2021.A pre-app meeting
was conducted with April Norton,Sam Dailey(USACE),and Andy Williams
(USACE)to discuss the project permitting approach. During this meeting, it
was determined that the stretch of Northern Durham Parkway that is to be
constructed through the proposed Junction Road and Ferrell Road site
would be considered a separate project from the industrial development
and would need to be permitted by the City of Durham under a separate
permit application.
Phase I of the proposed roadway will result in unavoidable impacts to two
404/401 wetlands,three intermittent streams,and multiple buffer zones.All
three stream and buffer crossings are proposed to be near perpendicular.
Phase 11,which is still in design and would be constructed following
completion of Phase 1,would result in unavoidable impacts to Panther
Creek,floodplain wetlands along Panther Creek,and associated buffer
zones. It is anticipated that impacts resulting from Phase I of the NDP
project will qualify for authorization under Nationwide Permit#14 and
corresponding Water Quality General Certification 4135.Additionally,the
project will require a Riparian Buffer Authorization for impacts to buffer
zones 1 and 2.
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401
Certification Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing
meeting request.
1 also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty-day clock started upon receipt of this application. You will receive notification regarding meeting
location and time if a meeting is necessary. You will receive notification when the thirty-day clock has expired, and you
can submit an application.
Signature
L5rIl vl
Submittal Date 10/5/2021
Reviewer Meeting Request Decision
.....................
Is a meeting required or is there more info needed?*
Yes No
If more information is needed,please add comments for the email notification below.
Comment for Email: Meeting held Oct 18th. Requirement met.
Accepted date for meeting 10/18/2021
10:00:00 AM