Loading...
HomeMy WebLinkAboutNCC203117_Annual Fee NOD Letter_20211018RCY COOPER Gownx ELIZABETH S. 81SER SP , f-Y BRIAN WRENN vrnKmr 10/18/2021 Falls of The Cape Attn: Robert Stafford 246 Valleyfield Lane 246 Valleyfield Lane Southern Pines, NC 28387-6754 Subject: Notice of Deficiency - Failure to Pay Annual Fee Invoice No. NCC203117-2021 Dear Permittee: You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee was billed on 9/1/2021 and was due on 10/112021. The annual fee applies to the following construction site: Falls of the Cape Phase 3 E. Front Street, Lillington, NC Harnett County Certificate of Coverage No. NCC203117 NC Reference No. NCG01-2020-3117 If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date, please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments). Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns, please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at annette.lucas@ncdenr.gov. Sincerely, William E. Vinson, Jr. Chief of Program Operations Division of Energy, Mineral, and Land Resources Nath Camlhi Department of EnAmnmental Qgallly I Dlvlskm or Energy. Mln l and Land Rrsarrces S12NorthSallsburyStree 1 1612 Mall Servke Cenrer 1 Ralelgh,NathCamlkna2709-1612 ter. rw�rr�rq 919 707.9200