HomeMy WebLinkAbout20000783 Ver 3_More Info Received_20130924Strickland, Bev
From: Dennison, Laurie
Sent: Tuesday, September 24.201310:35AM
To: Strickland, Bev
Subject: FYV: Traditions Gubdivision'PHaso1
Attachments: UPDATED PCN_subdivision_0O'20'13.pdf
Laurie Dennison
Wetlands, Buffers, Streams, Compliance — Permitting (Webscape) Unit
NCDENR/Division of Water Resources — Wetlands and Stormwater Branch
VVebsite:
From: Smith, CherhL
Sent: Tuesday, September 24,2O1]9:]9AM
To: Dennison, Laurie
Hi Laurie,
going to reissue V3 for the entire amount of impacts for Phase 1. Thank you.
[herh
From: Deborah Shirley
Sent: Friday, September 2O, 2013 1:38 PM
To: Smith, CheniL
Subject: RE: Traditions Subdivisinn-PHase 1
Cherri,
As per your request, | have updated the Project History,Gection8.5vvithinthePCNapp|icationandhave
provided sheet 4 for your review. Please note that the Project History is one section up from Section 8.6
however | wanted to utilize the blank space on page 4. The tables get confused and "fuse" to other tables
within the PCN if I wouldn't of done this way.
| hope this information ishelpful. Please let nne know if you need anything additional.
Debbie
Deborah Edwards Shirley
Soil & Environmental Consultants, PA
919 -846 -5900 (office)
919 -673 -8793 (mobile)
www.SandEC.co
THINK BEFORE YOU PRINT
From: Smith, Cherri L [ mai Ito: cherri.smith(a)ncdenr.aov]
Sent: Wednesday, September 18, 2013 3:55 PM
To: Deborah Shirley
Subject: RE: Traditions Subdivision -PHase 1
I asked Boyd DeVane to take a look at it to make sure he's okay with it, and he mentioned that he'd get back to me this
week about it. It might be a good idea for us to put that on the agenda tomorrow after we meet about Sierra. Does that
sound okay?
Cherri
From: Deborah Shirley [mai Ito: dshirleyCa)sandec.com]
Sent: Wednesday, September 18, 2013 3:48 PM
To: Smith, Cherri L
Subject: Traditions Subdivision -PHase 1
Cherri,
I wanted to touch base with you regarding the Traditions Subdivision PCN Application. We submitted on
August 28th for a re- verification of impacts that were previously authorized. The impacts have been refined a
r -.
Deborah Edwards Shirley
Environmental Specialist
Soil & Environmental Consultants, PA
11010 Raven Ridge Road
Raleigh, NC 27614
919 -846 -5900 (office)
919 -673 -8793 (mobile)
www.SandEC.co
This electronic communication, including all attachments, is intended only for the named addressee (s) and may contain confidential information. This
electronic communication may not have passed through our standard review /quality control process. Design data and recommendations included herein are
provided as a matter of convenience and should not be used for final design. Rely only on final, hardcopy materials bearing the consultant's original signature
and seal. If you are not the named addressee (s), any use, dissemination, distribution or copying of this communication is prohibited. If you have received this
electronic communication in error, please notify the sender by return e -mail and delete the original communication from your system. Thank you.
THINK BEFORE YOU PRINT
6. Future Project Plans
6a. Is this a phased project? ® Yes ❑ No
6b. If yes, explain.
Traditions is a Master Planned Mixed -use development that was approved by the Town of Wake Forest in May 2008.
Currently Phase I is moving forward, a majority of the remainder of the development has been on -hold for economic
reasons. Please seethe attached "Subdivision Master Plan" and the identified `potential future Impact Area #5 ".
Although we have not included this impact area within this application, we have identified the potential future impact area
for this development. Please note that the applicant for Phase I doesn't own any of the additional parcels within
Traditions and the original permittee /developer has no timeframe as to when additional phases will move forward through
the local or federal & state agency permitting process.
PREVIOUSLY AUTHORIZED IMPACTS
3a.
3b.
3c.
3d.
3e.
3f.
3g.
Stream impact number -
Type of
Stream name
Perennial
Type of
Average
Impact
Permanent (P) or
impact
(PER) or
jurisdiction
stream
length
Temporary (T)
intermittent
(Corps - 404, 10
width
(linear
(INT)?
DWQ — non -404,
(feet)
feet)
other)
S1 ( #1) ® P ❑ T
Fill -Road
UT to Hatters
® PER
® Corps
1'
65
Crossing
Branch
❑ INT
❑ DWQ
S2 ( #2) ® P ❑ T
Lot Fill
UT to Hatters
❑ PER
® Corps
5'
400
Branch
® INT
❑ DWQ
Culvert-
® PER
® Corps
S3 ( 0) ® P F-1 T
Road
Hatters Branch
E] INT
E] DWQ
7 ,
67
Crossing
S4 ❑ P ❑ T
❑ PER
❑ Corps
❑ INT
❑ DWQ
3h. Total stream and tributary impacts
532
6a.
® Neuse El Tar-Pamlico El Other:
Project is in which protected basin?
❑ Catawba ❑ Randleman
6b.
6c.
6d.
6e.
6f.
6g.
Buffer impact
number —
Reason for
Buffer
Zone 1 impact
Zone 2 impact
Permanent (P) or
impact
Stream name
mitigation
(square feet)
(square feet)
Temporary (T)
required?
B1( #3) ® P E]
Road Crossing
UT to Hatters
®No
3,748
3,447
T
B2 ( #4) ® P ❑ T
Non - Electric
UT to Hatters
❑ Yes
0
330
Utility
Branch
® No
B3 ❑P ❑T
F-1 Yes
❑ No
B4 ❑ P ❑ T
❑ Yes
❑ No
6h. Total buffer impacts
3,748
3,777
6i. Comments: Note: Hatters Branch is known locally and on the NC Flood Maps as "Dunn Creek ". It is not named
on the USGS or County Soil Survey.