Loading...
HomeMy WebLinkAbout20130917 Ver 1_More Info Letter_20130903NCDE R North Carolina Department of Environment and Natural Resources Division of Water Resources Water Quality Programs Pat McCrory Thomas A. Reeder. John E. Skvada, III Governor Director Secretary September 3, 2013 Mr. Ben Wilson, PE Cardno ATC 2724 East Millbrook Rd., Ste. 121 Raleigh, NC 27604 Subject: Hold — Huntersville Shopping Center DWQ #13 -0917 Mecklenburg County, NC Dear Mr. Wilson: On August 30, 2013, the Division of Water Resources (the Division) received you application dated August 28, 2013 for the subject project. Staff have conducted a preliminary review of this application and the following comments and clarifications are needed to process the application: 1) Please provide clarification on the project regarding post construction stormwater. Please provide the general layout/plan for the storm water bmp as it appears to be constructed within the confines of the existing stream. 2) Please overlay the project/site diagram as it relates to the stream and wetland at the site. 3) Based on the topo map and site plan, it does not appear that any effort has been made to avoid and /or minimize impacts to the headwater stream that is proposed to be filled. 4) The diagram provided shows a road entering from the south through an area denoted as new development. This may incur additional stream and /or wetland impacts that would be cumulative to the current project. Are there additional stream/wetland impacts associated with this entrance road? 5) Please provide culvert details (plan, profile, and longitudinal views) at an appropriate size and scale. 6) The diagram indicates the project is located south and /or west of Poplar Tent Rd. The topo map included in the package indicates it crosses to the east side of Poplar Tent Rd. Please clarify. Mooresville Regional Office One Location 610 East Center Avenue, Suite 301, Mooresville, NC 28115 NorthCarolina Phone* (704) 663- 1699Tax (704) 663 -6040\ Customer Service 1- 877 - 623 -6748 Internet http / /portal. ncdenr.org/web/wq wwra!!rf An Equal Opportunity /Affirmative Action Employer — 50% Recycled /10% Post Consumer Paper Mr. Ben Wilson Page Two 7) Be advised an approved copy of the storm water management plan is required prior to impacts. Pending receipt of the information requested above, this project will be placed on hold pursuant to 15A NCAC 2H .0507(h). In addition, this office is requesting that the Army Corps of Engineers place a hold on processing the application. If you have any questions, please contact Mr. Alan Johnson or me at (704) 663 -1699. Sincerely, �" /2ze---t' Michael L. Parker Regional Supervisor Surface Water Protection CC: Karen Higgins, Wetlands Unit Steve Kichefski, Asheville COE